SNS Status Report Karen S. White 10/15/08.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Protect Your Business and Simplify IT with Symantec and VMware Presenter, Title, Company Date.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Software Engineering – University of Tampere, CS DepartmentJyrki Nummenmaa INSTALLATIONS Software installation accommodates software.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
EPICS Meeting 2005ORNL Rdb systems at SNS Jeff Patton and cast April 27-29, 2005 EPICS Meeting 2005.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
April, 2005 EPICS Collaboration Controls Group Alarm Management at Jefferson Lab A New Configuration and Extended Capabilities B. Bevins, M. Joyce, J.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
R. Lange, M. Giacchini: Monitoring a Control System Using Nagios Monitoring a Control System Using Nagios Ralph Lange, BESSY – Mauro Giacchini, LNL.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Control System and Software Engineering Process Elder Matias
K.Furukawa, Feb Controls Activity at KEK Controls Activities at KEK Issues for ILC Kazuro Furukawa, KEK.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
ICS – Software Engineering Group 1 Status of SNS Carl Lionberger.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
Experience Running Embedded EPICS on NI CompactRIO Eric Björklund Dolores Baros Scott Baily.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Alarm System Status Curtis Dunn Control System Suite/Eclipse Frameworks Workshop EPICS Collaboration Meeting June 12-16, 2006.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Connecting LabVIEW to EPICS network
Jefferson Lab Report Karen S. White 11/14/00. Overview  Status of Jefferson Lab Control System  Work In Progress  Transitioning to Operations.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Industrial Control Engineering ADE Rapid Application Development Environment.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
LCLS Commissioning & Operations High Level Software
Cryoplant Controls Installation
BaBar Transition: Computing/Monitoring
Business System Development
Accelerator control at iThemba LABS
Accelerator Reliability and Software
Oracle Database Administration
The ILC Control Work Packages
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Jefferson Lab Low Level RF Controls
LCLS Commissioning & Operations High Level Software
MES Migration HGP Asia Knowledge Day 2017
The EPICS running envirionments in the five accelerator projects
Fiber Based Synchronous Timing System
Channel Archiver Kay-Uwe Kasemir, LANL
EPICS: Experimental Physics and Industrial Control System
Test Beamline System Requirements and Charge to PDR Committee
Readout Systems Update
Vacuum Control System for Monolith Vacuum
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

SNS Status Report Karen S. White 10/15/08

EPICS Collaboration Meeting October 15-17, 2008 SNS Background Spallation Neutron Source World’s most powerful pulsed neutron source Built by ORNL and 5 partner labs Construction complete (CD-4) April 2006 Current operating power ~625 kW Full operating power 1.4MW Multiyear ramp up to full production capability Full power, high availability, max hours 24 instruments on 18 beamlines Planning power upgrade, 2nd target, current upgrade EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Controls Large operational EPICS system ~180 VME IOCs (VxWorks) ~80 Soft IOCs (Linux) ~320 Diagnostics IOCs (Windows) ~210 PLCs ~500,000 Process Variables, including ~125,000 for diagnostics Estimated 100,000 channels EPICS Collaboration Meeting October 15-17, 2008

Production Ramp Up Plan FY08 Actual 72.0 2807 4032 950 Availability (%) Neutron Production Hours Total Operating Hours Integrated Beam Power Commitment [MW-hrs] FY07 75.0 1500 3500 117 FY08 82.5 2700 4000 887 FY09 90.5 5000 3575 FY10 92.5 4300 5133 FY11 94.5 4500 5350 EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 SNS Culture Change Operations Commissioning Construction “Make it work right all the time” “Just build it” (on schedule & budget) “Make it work” EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Phases Construction Budget and Schedule rule Technical deliverables sometimes compromised to stay on schedule or within budget Commissioning Demonstration that technical systems can operate, often at less than full design specifications Learn how to operate and get diverse systems to work together Identify and fix problems, then run some more EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Phases Operations Repeatability, Reliability, Availability, Operability Deliver neutrons to users Gradual ramp up to full power In parallel Upgrade, improve or repair problematic systems Push for higher availability Controls Availability Goal – Downtime < 50% of FY07 Actual – FY08 downtime was 37% of FY07 EPICS Collaboration Meeting October 15-17, 2008

All Systems Downtime Hours EPICS Collaboration Meeting October 15-17, 2008

Controls Downtime Hours EPICS Collaboration Meeting October 15-17, 2008

Controls Availability Analyze causes of past downtime and target improvements to address biggest loss and highest frequency problems Downtime Not due to EPICS Hardware failures Application programs Unclear interfaces  shooting the messenger Controls can also help other systems improve availability EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Infrastructure Network, servers, file storage Failures poses biggest risk for widespread outage with potentially long recovery times Backups, patching, file organization, bumpless reboots, hot spares Improve configuration control, documentation and system monitoring Decouple services for accelerator operations from ORNL IT (e.g. Oracle) EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Alarms Operations does not like our alarm system (not alh) Alarms based on automatically generated EPICS IOC logic and edm screens Monitors ~12,000 Process Variables Selected alarms are audibly annunciated Non-annunciated alarms are basically ignored Getting from a summary alarm indication to the root cause requires drill down through numerous screen System is difficult to maintain and expand Difficult to define what is an alarm; get good limits and configurations EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 New Developments New controls back-end developments use: CSS/Eclipse/Java Oracle database for configuration and logging Other talks at this meeting New Archiver (Kay Kasemir) Databrowser (Kay Kasemir) Database (Dave Purcell) Alarms (Kay Kasemir) XAL (Dave Purcell for Tom Pelaia) CAML (Dave Purcell for Tom Pelaia) EPICS Collaboration Meeting October 15-17, 2008

Controls Improvement Projects PPS MEBT Beam Stop Mode Allows downstream tunnel entry during front end operations Timing Improve maintainability and reliability; reduce number of modules Design 3 new timing system boards Master – replaces 20 existing VME cards (1) Receiver - FPGA based board (25) Fan-out – distributes low jitter signals to new receivers Vacuum Improve maintainability and reliability Replace custom chassis and interlock modules with standard PLC controls EPICS Collaboration Meeting October 15-17, 2008

EPICS Collaboration Meeting October 15-17, 2008 Hiring Transition from construction to operations, need different skills mix Now hiring software and hardware engineers jobs.ornl.gov select Neutron Science EPICS Collaboration Meeting October 15-17, 2008