BPA Formal Comments Overview to NAESB OS

Slides:



Advertisements
Similar presentations
W. WeathersModeled after Redirect Examples Examples: Reservations that are dotted show Capacity Available to Resell or Transfer. MWs in Gray are.
Advertisements

11 OASIS Subcommittee - Notification Task Force UPDATE May
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
1 Defender Mitigation Proposed Name Change: Defender Reservation True-up Jan 15, 2012 NAESB OASIS Subcommittee Progress Report.
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Preemption and Competition Redirect Issues NAESB OS Meeting June 6, 2012 BPA Presenting.
NAESB Coordinate Interchange
Timing and Flowchart Assignment
W. Weathers1A Conference Call 8/18/05 Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Timing Considerations for Short-term Preemption and Competition Automation NAESB OS Presentation.
FERC Order minute Scheduling.
Tiers 1 & 3 Assignment Flat Profile Recommendation.
NAESB OASIS Subcommittee Long Term Competition Mike Norris, Rebecca Berdahl May 13, /13/141.
DRAFT E-Tag Notification Presentation NAESB OS Mar 26-28, 2013 Seattle, WA.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER OA ER Issued May 16, 2013
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
Short-Term Competitions and Preemption.  Overview  Standards being covered are:  Motion 2 - Fixed Capacity Over Term of Request. ▪ Tier 1 Service –
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS July 22-24, 2014 BPA Presenting.
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS Presentation August 20, 2014 BPA Presenting.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Capacity Reassignments, Aggregation & Redirects of Reassignments NAESB OS – May 13th, 2014 BPA.
Consolidation (API 5.d R09015) Business Practice Standards Draft WEQ OS Marie Pompel – July 2015.
NAESB WEQ EC Meeting 10/20/2015.   Workload  Long-Term Competition for Rollover Rights OASIS Subcommittee.
NAESB Update Kathy Anderson October 2015 MIC Meeting.
02/19/14 REVIEW AND UPDATE FLOWCHART AND TIMING. Goals Finish going through the process flowchart listing the steps and various options for each. Develop.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
03/11/14 RECOMMENDATION FLOWCHART AND TIMING. GOALS Finish going through the process flowchart listing the steps and various options for each. Develop.
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
NT Assignment Update: 9/17/13. NT Assignment Update Resources: CompanyResources BPARebecca Berdahl, Milos Bosanac, Ann Shintani, Bob Zerfing ClarkBrenna.
NITS on webSmart OASIS. NITS on webSmart OASIS Agenda  Company and User Permissions  Electronic Industry Registry requirement  WebSmart OASIS NITS.
NAESB NITS, and Long-term Competition
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Preemption-ROFR Notification
NT Assignment Update: 9/17/13.
WEQ OASIS Subcommittee
BPA Formal Comments Recap of ‘Best Offer’ Proposal
SCC P2P – Collaboration Made Easy Contract Management training
Duke Energy Carolinas Quarterly Stakeholder Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
Recommended Appendix B Redirect Standards Examples
Service Across Multiple Transmission Systems
Preemption & Competition Standards BPA – Southern Compromise Proposal October 24, 2017 PURPOSE: Review and discuss the inequity with the Short-Term Firm.
NITS Review Scoping Document.
Duke Energy Carolinas Quarterly Stakeholder Meeting
Service Across Multiple Transmission Systems
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Conjoint Analysis.
Short-term Competition and Preemption (STCP)
Interchange Scheduling and Accounting Subcommittee Meeting
System Optimizations Work Group Update
Entry Overrun Calculation
NITS on webSmart OASIS.
Kathy Anderson October 2015 MIC Meeting
Assigned to the WEQ OASIS and BPS Subcommittees
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
OASIS Notification Recommendation.
and Forecasting Resources
Presentation transcript:

BPA Formal Comments Overview to NAESB OS API 2.a.i.1 – Short-term Preemption & ROFR Aug 16, 2017

Agenda Background Proposal 1 Proposal 2 Proposal 3 Note: These proposals address different problems and thus should be considered independently of each other. BPA Formal Comments @ NAESB OS 08/16/2017

Background The draft standards allow a scenario in which more Defenders with ROFR are identified than there is ATC to accommodate them all (x001-xx.4.3.5.2). This can create ROFR “winners” and “losers”. A ROFR “loser” is a customer who legitimately tried to exercise ROFR by submitting a valid ROFR request on-time, but for which the Matching profile could not be granted by the TP. BPA believes a TP should only offer ROFR to a Defender when there is sufficient ATC to honor all such ROFRs. However, BPA recognizes that FERC has envisioned that it may not be possible to honor all ROFR’s. BPA is not challenging the standards that allow ROFR “losers” to exist. However, BPA is proposing remedies for two adverse outcomes related to ROFR “losers”. The selection of ROFR “winners” and “losers”. How capacity preempted from a ROFR “loser” is allocated in some cases. BPA Formal Comments @ NAESB OS 08/16/2017

Problem 1 Customers with less sophisticated systems and fewer financial resources can be at a disadvantage in having their ROFR request be awarded when there are multiple Defenders with ROFR and insufficient ATC to accommodate them all. BPA Formal Comments @ NAESB OS 08/16/2017

Sorting Criteria of ROFR Requests Table xx-7 echoes FERC guidance on the sorting of multiple ROFR requests. Duration Price Queue Time of the ROFR Request In practice, however, Queue Time of the ROFR request can be the governing criteria in many cases. Most Defenders will choose to match the duration of the Challenger. Price is not a factor for TP’s that use a tariff rate. When Queue Time is the tie-breaking criteria, the advantage goes to the customer who can respond most quickly with a ROFR request. This advantages some customers over others. FERC has already demonstrated a willingness to level such a playing field between customers when there is a race to respond. BPA Formal Comments @ NAESB OS 08/16/2017

FERC on Leveling the Playing Field In Order 890, FERC provided guidance on how to level the playing field between customers with disparate levels of sophistication when there is a time-based “race” to acquire constrained capacity. “1419. In order to ensure that transmission service is not awarded in an arbitrary fashion and to ensure that transmission customers who are less sophisticated and have fewer financial resources have equal access to transmission service, we will require transmission provider who set a “no earlier than” time for request submittal to treat all transmission service requests received within a specified period of time as having been received simultaneously.” FERC introduced a “simultaneous submission window” concept to give everyone an equal chance at getting the limited ATC when a “starting gun” is used to initiate a “race to ATC”. BPA believes that there is a similar “starting gun” situation and “race to ATC” for submission of ROFR requests when Queue Time of ROFR response becomes the governing criteria for sorting ROFR requests. BPA Formal Comments @ NAESB OS 08/16/2017

Leveling the Playing Field for ROFR Submission Just as in the case of a “no earlier than” window, customers with sophisticated systems will be able to submit a ROFR request within seconds of being notified of the competition, while a customer with less resources may take an hour or more. This can be mitigated by employing a similar simultaneous submission window for ROFR requests. All ROFR requests received within the first “xx” minutes will have the same time of ROFR response. Employ a new tie-breaker for ROFR requests received within the window. SSW (5 min) ATC being requested starts 60 days in the future 60 Days Out “No earlier than” for Monthly Firm PTP Market Open (xx min) ROFR sorting and evaluation 24 hour ROFR Response Time Remainder of ROFR Response Time Competition Initiated Starting Gun BPA Formal Comments @ NAESB OS 08/16/2017

Proposal 1: SSW for ROFR Requests Add footnote * to Criteria 3 to indicate that all ROFR requests received in the first ‘xx’ minutes from initiation of the Preemption-ROFR Process will have the same Queue Time. The period ‘xx’ will be indicated by the TP in their Business Practices. TP can opt-out of using this simultaneous window by setting the value to zero. Add a 4th criteria to serve as a tie-breaker for Criteria 3: the Queue Time of the original Defender ARef. ROFR requests received after ‘xx’ min will be sorted by Criteria 3 as per current standards. Table xx-7 Criteria Order Attribute 1 Duration 2 Price 3 Queue Time (of ROFR Request) * 4 Queue Time (of Defender ARef) BPA Formal Comments @ NAESB OS 08/16/2017

Motion 1: SSW for ROFR Requests Modify Table xx-7 to add a footnote to Criteria 3 to indicate that all ROFR requests received within ‘xx’ minutes of the initiation of the Preemption-ROFR Process will be deemed to have been queued at the same time. Add Criteria 4 to use the Queue Time of the Defender ARef as the tie-breaker for Criteria 3. The ‘xx’ time period will be determined by the TP in their Business Practices. BPA Formal Comments @ NAESB OS 08/16/2017

Problem 2 It is possible for capacity that is preempted from a Defender who legitimately tried to exercise ROFR to be reallocated and awarded to a lower priority Defender, even one that is still pending. BPA Formal Comments @ NAESB OS 08/16/2017

Current Order of Evaluation and Profiles Evaluate Defenders with ROFR Explicitly decline ROFR Only submit invalid ROFR requests Do not submit any ROFR request Valid ROFR request that is granted Valid ROFR request that is not granted Evaluate Challenger Evaluate Defenders without ROFR Reservations Requests Remaining Matching Profile Remaining BPA Formal Comments @ NAESB OS 08/16/2017

So what’s the problem? Evaluate Defenders with ROFR Explicitly decline ROFR Only submit invalid ROFR requests Do not submit any ROFR request Valid ROFR request that is granted Valid ROFR request that is not granted Evaluate Challenger Evaluate Defenders without ROFR Reservations Requests The Remaining profile is calculated by the TP based on the premise that preempted capacity is awarded to the Challenger, but… Profile Remaining Remaining Remaining Preempted capacity …if the Challenger does not take the preempted capacity, that ROFR capacity can be awarded to a Defender without ROFR.  BPA Formal Comments @ NAESB OS 08/16/2017

A New Principle… Evaluate Defenders with ROFR Evaluate Challenger Defenders who submit valid ROFR requests that are not granted should be given the first opportunity at excess capacity remaining after the Challenger final state. A New Principle… Profile Evaluate Defenders with ROFR Explicitly decline ROFR Only submit invalid ROFR requests Do not submit any ROFR request Valid ROFR request that is granted Valid ROFR request that is not granted Evaluate Challenger Re-evaluate any ROFR “losers” Evaluate Defenders without ROFR Reservations Requests Remaining Remaining Remaining Matching Sounds easy enough, but there is another thing to consider… BPA Formal Comments @ NAESB OS 08/16/2017

What about the Remaining Profile? A re-evaluation of a Defender with ROFR after the Challenger final state seems in conflict with the purpose of the Remaining profile. The Remaining profile provides important benefits: Serves as an affirmative agreement between the TP and TC on the capacity that will be granted if the Matching profile cannot be granted. Provides the Defender a mechanism for lowering their remaining capacity. Provides a guarantee of capacity to the TC (the Remaining profile is not re-evaluated for changing system conditions by the TP). Some customers may prefer the certainty of the Remaining profile, while others may want the opportunity to get an improved offer over and above the Remaining profile through re-evaluation. TP’s may require affirmation from TC’s before granting Defenders with ROFR capacity other than the Remaining profile. BPA Formal Comments @ NAESB OS 08/16/2017

Proposal 2: ‘Best Offer’ for Defenders with ROFR Offer Defenders with ROFR the option to choose between the certainty of the Remaining profile or an opportunity to be re-evaluated for a better offer once the Challenger is in a final state. Add a ‘Best Offer’ flag to the rofrrequest template: Best Offer = “No” means Defenders who submit a valid ROFR for which there is insufficient ATC will get the Remaining profile without a re-evaluation. Best Offer = “Yes” means the Defender is informing the TP of their desire to forego the certainty of the Remaining profile. Instead, the Defender will be re-evaluated after the Challenger final state, but prior to any evaluation of Defenders without ROFR. This re-evaluation may result in final capacity that is higher or lower than the Remaining profile. Thus, the customer must explicitly opt-in by setting the ‘Best Offer’ flag in a valid rofrrequest submission. This re-evaluation will only occur for Defenders who set the ‘Best Offer’ flag when the Matching profile cannot be granted in full (i.e., ROFR “losers”) This option does not apply to Defenders who: explicitly decline ROFR; only submit invalid ROFR requests; or do not submit any ROFR request at all. This adds a new Data Element to WEQ-003 and an update to the rofrrequest template in WEQ-002. There are also changes to WEQ-001 and WEQ-013 to explain the use of the flag and the re-evaluation process. BPA Formal Comments @ NAESB OS 08/16/2017

Motion 2: ‘Best Offer’ for Defenders with ROFR Defenders with ROFR will be offered the option to have their final capacity award based on a re-evaluation that occurs after the Challenger is in a final state but before any re-evaluation of Defenders without ROFR. This proposal targets Defenders who legitimately try to exercise ROFR by submitting a valid ROFR request, but for which the Matching profile cannot be granted. BPA Formal Comments @ NAESB OS 08/16/2017

Problem 3 Customers who explicitly decline to exercise ROFR must still wait for the 24hr ROFR window to expire (or for all Defenders with ROFR to respond) before their participation in the Preemption-ROFR Process is completed. This delay seems unnecessary. BPA Formal Comments @ NAESB OS 08/16/2017

Timeline for Explicitly-declined ROFR The ROFR response window is 24 hours or when all Defenders with ROFR have responded with a valid ROFR request. Customers who explicitly choose to not exercise ROFR are subject to this same timing. This unnecessarily delays such customers from doing other business (tagging, Resales, Redirects) with their remaining capacity (if any). Evaluate ALL ROFR Defenders Defender 1 Explicitly Declines Start of ROFR Competition 24 Hour ROFR Response Time Defender 2 Does Not Respond End of ROFR Competition BPA Formal Comments @ NAESB OS 08/16/2017

Proposal 3: Early Conclusion for Declined ROFR No changes to the ROFR requirements for a Defender who wishes to explicitly decline to exercise ROFR. If the TP receives a valid ROFR request indicating the intent to explicitly decline ROFR, the TP shall immediately: Apply the Remaining profile as applicable to the related Defender ARef. Reset the competition flags for this Defender and all associated Dependents. No change to the timing and processing of other ROFR requests. Evaluate Remaining ROFR Defenders Defender 1 Explicitly Declines Start of ROFR Competition Assign Remaining Profile and Turn off Flags 24 Hour ROFR Response Time Defender 2 Does Not Respond End of ROFR Competition BPA Formal Comments @ NAESB OS 08/16/2017

Motion 3: Early Conclusion for Declined ROFR The Transmission Provider will immediately conclude a Defender’s participation in the Preemption-ROFR Process as soon as the TP receives a valid ROFR request indicating this customer’s intent to explicitly decline ROFR. BPA Formal Comments @ NAESB OS 08/16/2017

Questions? BPA Formal Comments @ NAESB OS 08/16/2017

Backup BPA Formal Comments @ NAESB OS 08/16/2017

Prior OS Discussions of SSW March 2013 OS discussions on SSW were related to how Defenders who had been subject to the “no earlier than time” submission window would be treated as Defenders. These discussions were NOT related to using a submission window concept for ROFR requests. Motion 52: When multiple reservations that were granted as part of a given Simultaneous Submission Window (SSW) are subsequently identified as potential defenders, and all other differentiating criteria are equal (duration, price and queue time), these defenders shall be given a relative priority to one another based on the reverse order, last-in-first-out (LIFO), that each of these SSW defenders were granted in clearing the SSW. In the cases of pro-rata allocation methodology, the original queue time within the SSW shall be used to determine the relative priority of the defenders (LIFO). Motion 52 was withdrawn. Motion 53: The business practice for preemption and competition shall be silent in the treatment of defenders granted in the Simultaneous Submission Window (SSW). Motion 53 was voted down. BPA Formal Comments @ NAESB OS 08/16/2017

Best Offer Example Assume the below four-day scenario with ATC of 15 MW on Day 1, 0 on Day 2, 15 on Day 3, and 5 on Day 4. A Challenger wants 15 MW on Day 1 through Day 3. Defender 1 is still pending for 5 MW on Day 2. Defender 2 is a Conditional Reservation for 5 MW on Day 2. Defender 3 is a Conditional Reservation for 10 MW on Day 2. The Challenger needs 15 MW on Day 2, 5 MW from all three defenders. The rofrrequest that is created is pictured below. Note that there is enough ATC in Day 4 for both of the ROFR Defenders to individually extend and get their match, but not enough ATC for both of them. Assume that Defender 2 gets their rofrrequest submitted before Defender 3. Thus, Defender 2 will be accepted and Defender 3 will be denied. BPA Formal Comments @ NAESB OS 08/16/2017

Best Offer Example (continued 2) Defender 2 will get their matching profile while Defender 3 will get their remaining profile. Defender 1 (the pending request) will get 0 MW. The Challenger will get a partial offer of 15 MW, 5 MW, and 10 MW. ATC will be zero all four days. Assume the Challenger can’t use the partial, so they either rebid down or, in this case, withdraw their Request. That will leave ATC of 15 MW on Day 1, 5 on Day 2, 10 on Day 3, and 0 on Day 4. The 5 MW in Day 2 came from what was taken from Defender 3. BPA Formal Comments @ NAESB OS 08/16/2017

Best Offer Example (continued 3) Current: Standards say that once the Challenger is in a final state, that the non-ROFR Reservations and pending Requests are re-evaluated. What this means is that the 5 MW that came from Defender 3, and that Defender 3 wanted to save since they tried to match, goes to Defender 1 which has a lower priority than Defender 3. Proposal: In this case Defender 3 could enable the “Best Offer” flag to indicate to the TP that they want to be re-evaluated following Challenger final action. Defender 3 gets it’s 5 MW on Day 2 back for their original 10 MW and the lower priority Defender 1 gets 0 MW. BPA Formal Comments @ NAESB OS 08/16/2017