Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain elisa.guillermain@cern.ch.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
DC-DC Buck Converter in Inner Detector Environment
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
1 LHC Project Seminar - 06/05/99Raymond RAUSCH - SLRAD-WG Radiation Tests on Electronics for the LHC Machine u Presentation - Objectives of the Radiation.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
LHC Emergency Lighting jm FORAY EN/EL/BT Initial project : The current LHC emergency lighting system was designed and installed at the time of the LEP.
TPS & Simulations within PARTNER D. Bertrand, D. Prieels Valencia, SPAIN 19 JUNE 2009.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
CLIC/CLEX controls Radiation issue August 29 th, 2012 F.Locci - BE/CO-FE.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
Remembering PWO Radiation hardness studies at IHEP, Protvino Y. Kubota.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
R2E Workshop Preparations RadWG Meeting March 25 th.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
Radiation Resistant Lighting Ben Fiedler Supervisor: J. Devine.
Matters arising RADWG - 3 July 2009
Solid-State Cameras for LHC instrumentation
CONS and HL-LHC day Analysis of needs from TE-EPC
Project lead by Fusion For Energy (F4E)
Distributed Optical Fibre Radiation and Temperature Sensor (DOFRS)
TETRA (CERN’s Safety Radio Communication Network)
Irradiation test of Commercial (BASLER) digital cameras
Radiation monitoring and follow up during LHC commissioning
Cryo equipment strategy in the R2E context
SPS dose forecast for foreseen safety installations
An extensive aging study of bakelite RPC
Installation of an Instrument on a CERN machine
“hot spots” SIS100 internal beam dump Super-FRS production target
Material irradiation tests meeting R2M, a spin-off from R2E
2 Fraunhofer INT Euskirchen Germany
Ideas and design concepts, and challenges
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Helium spill in LHC tunnel
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
Compact readout unit for the EP-RADMON radiation monitoring sensors
Irradiation Facilities Questionnaire
Dose levels at the SPS, monitoring and calculation.
Ongoing BE-BI developments going to be exposed to radiation
Irradiation test of Pressure Transducers for the LHC machine
Radiation Monitoring in LHC Experiments
Studies of the effect of the LHC cycle on
Radiation tolerant fibres for LHC controls and communications
Material Irradiation Tests June 2016 coordination meeting
Radiation Working Group RADWG
Presentation transcript:

Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain elisa.guillermain@cern.ch

Material Irradiation testing - WorkFlow Identification of dose levels : Where is the material installation area(s) ? How long is it expected to live ? Irradiation test → Accelerated ageing test. Definition of the irradiation test parameters and specification. Irradiation type and dosimetry, passive or active test, etc… Choice of the suitable irradiation facility. In-house (CHARM, CC60,…) or external (Fraunhofer INT, Ionisos,…). Material characterization : Tests and analysis. Conclusions : Can the material be installed or an alternative must be find ? R2E team support at all steps ! Support of the Monitoring and Calculation Working Group !

Project example 1 : Emergency lights

Emergency lights : Overview Current technology is robust but obsolete – will be discontinued. Need to have a replacement solution ! New emergency lighting system : Two types of lights : Comatelec specifically designed for wall mounting. Thorlux for ceilings. Specifications are similar. Parts potentially sensitive to radiation : Power supply : Modified for SEE insensitivity (still need to be fully assessed). KT fund and CERN open hardware license. LEDs. Plastic or glass parts (windows).

Emergency lights : Irradiation tests history Test of the full system : In CNGS. Gammas (Fraunhofer INT) – December 2013. Passive tests, up to 100 kGy. Darkening of the windows. Decrease of the light flux. Neutrons (CEA) – June 2013. 5x1014 neutron eq/cm2. Difficulties for the characterization test. Test of parts : At CHARM : Bridge rectifier of the new power supply was tested at CHARM. Resistant up to at least 30 Gy (parasitic mode : low total dose…).

Emergency lights : Irradiation tests history On-going real condition tests : The old technology was removed and replaced by the new technology during LS1: In LHC Pt 7 : Wall emergency lights (approx. 1.4 m height every 14 m). Lights are ON when tunnel is closed. In TDC2 and TCC2 : Wall emergency lights (approx. 1.4 m height) and ceiling emergency lights. Half of the lights are OFF when tunnel is closed. LED lifetime increase is expected.

Emergency lights: Requests to MC WG The light shall withstand at least 5-years LHC dose. Doses accumulated since their installation (LS1) ? Expected doses for the next years ? The lights are not at beam level (BLM) nor RadMon locations (below beam line), but on the walls : How to assess the dose at the tunnel walls from the doses at beam level ? Feedback from MC WG will help determining the parameters and condition for the foreseen additional irradiation tests.

Project example 2 : TETRA system

TETRA beacons : Overview TETRA emergency communication system : http://information-technology.web.cern.ch/services/Radio-Communication Digital communication and geolocation system : In both surface and underground CERN areas. Radio (fire brigade, security guards, maintenance and operational teams). Over 1000 beacons for geolocation. Beacons : Contains electronics. Modified for SEE insensitivity(still need to be fully assessed). Battery powered (LiSOCl²). TETRA system was installed during LS1 in the whole accelerator chain.

TETRA beacons : Irradiation tests history Irradiation test already preformed : In CNGS (CNRAD), up to 154 Gy. At Fraunhofer INT (gammas) : Failure at 336 Gy with 3.2 Gy/h. They functioned again after annealing. Output of irradiation tests : The beacons resisted up to few hundred Gy only. Most critical in SPS. Consider development of radiation tolerant beacons ? It is unsure if failure is due to the batteries or the beacons themselves (power consumption increase ?).

TETRA beacons : Requests to MC WG System installed during LS1 in accelerators (inner walls of tunnels). In SPS, 1/3 of the beacons stopped working. Location of the damaged beacons is known. Doses accumulated since their installation (LS1) ? Expected doses for the next years ? How to assess the dose at the tunnel walls from the doses at beam level ? Feedback from MC WG will help determining the parameters and condition for the foreseen additional irradiation tests.

Conclusion The two systems described are safety related : It is crucial to assess their lifetime. Feedbacks and inputs from the MC WG are valuable for specifying irradiation tests and assessing the life time of material and devices depending on their installation area(s). Difficulties : BLM, RadMon, RPL are not at the walls or ceilings. How to estimate the accumulated dose at the walls / ceiling from these measurements ? Inputs from the Fluka Team ? The outputs from these two request will be useful in the frame of many other projects.

Thanks for your attention !