xxxx doc.: IEEE /xxxxr0 March 2017

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Advertisements

Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE aj Process Overview
IEEE aj Task Group May 2017 Agenda
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
IEEE aj March Closing Report
IEEE aj Task Group March 2017 Agenda
IEEE aj May Closing Report
IEEE aj Task Group May 2016 Agenda
IEEE aj Task Group May 2017 Agenda
TGaj editor report for Sponsor Ballot
Presentation transcript:

xxxx doc.: IEEE 802.11-17/xxxxr0 March 2017 P802.11aj Report to EC on Unconditional Approval to go to Sponsor Ballot Date: 2017-03-17 Author(s): Jiamin Chen (Huawei) Jiamin Chen /Huawei

xxx doc.: IEEE 802.11-16/xxxxr0 March 2017 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for unconditional approval to send IEEE P802.11aj Draft 5.0 to Sponsor Ballot. This document was approved during the plenary session of the 802.11 working group on 17th March 2017. Passed in the Working Group 46-yes, 0-no , 4-abstain The TGaj 5C document (https://mentor.ieee.org/802.11/dcn/12/11-12-0141-07-cmmw-ieee-802-11-cmww-sg-5c.doc ) was also approved during the plenary session of the 802.11 working group on 17th March 2017. Passed in the Working Group 44-yes, 0-no , 3-abstain Jiamin Chen (Huawei) Jiamin Chen /Huawei

802.11 WG Letter Ballot Results – P802.11aj xxx doc.: IEEE 802.11-012/xxxxr0 March 2017 802.11 WG Letter Ballot Results – P802.11aj Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 217 2016-01-20 IEEE 802.11aj Draft 1.0 Technical Technical 368 295 80 36 12 221 30 88 220 2016-06-30 IEEE 802.11aj Draft 2.0 First Recirculation Technical Recirculation 377 304 81 53 17 218 28 89 223 2016-08-30 IEEE 802.11aj Draft 3.0 Second Recirculation 308 82 57 19 27 226 2016-12-21 IEEE 802.11aj Draft 4.0 Third Recirculation 313 83 55 18 234 21 92 228 2017-03-04 IEEE 802.11aj Draft 5.0 Fourth Recirculation 315 84 51 16 247 14 95 228.1 LB 228 Post-Ballot vote change* 249 * Email indication of “Approve” from Ganesh Venkatesan and Yongho Seok. Jiamin Chen (Huawei) Jiamin Chen /Huawei

802.11 WG Letter Ballot Comments – P802.11aj xxx doc.: IEEE 802.11-012/xxxxr0 March 2017 802.11 WG Letter Ballot Comments – P802.11aj Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) 217 2016-01-20 Technical Letter Ballot for TGaj draft 1.0 174 220 2016-06-30 First Recirculation Ballot for TGaj draft 2.0 38 223 2016-08-30 Second Recirculation Ballot for TGaj draft 3.0 21 226 2016-12-21 Third Recirculation Ballot for TGaj draft 4.0 27 228 2017-03-04 Fourth Recirculation Ballot for TGaj draft 5.0 1 (*) (*) The commenter withdraws the comment. Jiamin Chen (Huawei) Jiamin Chen /Huawei

xxx doc.: IEEE 802.11-16/xxxxr0 March 2017 Letter Ballot 228 A single comment was received that was not "must be satisfied" (and was from a "yes" voter). The commenter subsequently stated by email to the WG chair that he wished to withdraw the comment. The comment was discussed and resolved during the March session. That discussion and resolution was notified to the WG members as usual in the comment resolution spreadsheet (https://mentor.ieee.org/802.11/dcn/17/11-17-0390-01-00aj-lb228-comment-database.xlsx),  and the approval recorded in the task group minutes (to be posted). This satisfies the IEEE-SA OM requirement "shall provide evidence of the consideration of each comment" (OM 5.4.3.3). Because this is not a comment that "must be satisfied",  and because no changes were made since the previous ballot,  no recirculation is needed. Jiamin Chen (Huawei) Jiamin Chen /Huawei

Unsatisfied comments by commenter xxx doc.: IEEE 802.11-012/xxxxr0 March 2017 Unsatisfied comments by commenter Voter LB217 LB220 LB223 LB226 LB228 Total Bazhong Shen (*) 4 Brima Ibrahim (*) 1 Jonathan Segev (*) 2 Matthew Fischer (*) 14 22 36 Nehru Bhandaru (*) Payam TorabJahromi(*) 6 10 Qi Wang (*) Solomon Trainin (*) Victor Hou (*) 5 Vijay Auluck (*) Vinko Erceg (*) Yakun Sun (*) 3 41 67 (*) Commenter provided no response for a contact to ask which comments are satisfied or unsatisfied. Total number of unsatisfied comments based on feedback from commenter: 0 Total number of unsatisfied comments from unresponsive commenter: 67 Jiamin Chen (Huawei) Jiamin Chen /Huawei

Unsatisfied comments by commenter – Topics Sept 2012 doc.: IEEE 802.11-012/xxxxr0 March 2017 Unsatisfied comments by commenter – Topics Topic #Comments Definitions/acronyms, General description (Cls. 3, 4) 2 Layer management (Cls. 6) 1 Frame Formats (Cls. 9) 16 MAC sublayer functional description (Cls. 10) 18 MLME procedures / Security (Cls. 11, 12) 4 PICS, MIB, Country elements etc. (Annex B, C, E) General (or no Cls. specified) , 5C doc PHY (Cls. 24, 25) 22 Total 67 Jiamin Chen (Huawei) Xiaoming Peng / I2R

Unsatisfied comments March 2017 xxx doc.: IEEE 802.11-16/xxxxr0 March 2017 Unsatisfied comments There is no unsatisfied comment from responsive commenter. The composite of all unsatisfied comments from unresponsive commenter and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. Jiamin Chen (Huawei) Jiamin Chen /Huawei

TGaj Timeline Open Close March 2017 First sponsor ballot 23-Mar-17 Sept 2012 doc.: IEEE 802.11-012/xxxxr0 March 2017 TGaj Timeline Open Close First sponsor ballot 23-Mar-17 23-Apr-17 Second sponsor ballot 14-Jun-17 30-Jun-17 Third sponsor ballot 27-Jul-17 10-Aug-17 Fourth sponsor ballot 22-Aug-17 6-Sept-17 RevCom Submittal deadline 16-Oct-17 EC Approval Nov 10-Nov-17 RevCom - SASB Dec 5-6-Dec-17 Jiamin Chen (Huawei) Xiaoming Peng / I2R

Thank You! March 2017 xxx doc.: IEEE 802.11-16/xxxxr0 Jiamin Chen (Huawei) Jiamin Chen /Huawei