Internal review of IR2 LEP cryostats (WP11/WP5) Close out session

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
The integration of 420 m detectors into the LHC
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Closing Session Report
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
SIS 100 Vacuum chamber Recooler String system Components
Cryostats for superconducting magnets
ALIGNMENT OF THE NEW TRIPLETS
SPL RF coupler: integration aspects
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
STRAW TRACKER SYSTEM CAD STATUS :
Roadmap for triplet cryostats
11 T Dipole Integration & Plans M. Karppinen
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Status of cryostat integration and conceptual design
SPS cryogenic proximity equipment and SM18 validation
Steam Power Generation
Hollow e- lens, Cryogenic aspects
Renovation of the 45-year old PS magnets
List of changes and improvements for the next generation CLIC module
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Circuits description and requirements - Closed Session-
The 11T cryo-assembly: summary of design and integration aspects
UK RFD Pre-Series cryomodule
Thomas Otto, TE Department, CERN
TEST PLANS for HL LHC IT STRING
as a prototype for Super c-tau factory
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Internal review of IR2 LEP cryostats (WP11/WP5) Close out session Diego Perini, Rob Van Weelderen, Jaime Perez Espinos, Jean-Philippe Tock https://indico.cern.ch/event/630930/overview

Are the design and the specifications for procurement at the level of maturity appropriate to start the production? Have all the relevant constraints, e.g. thermo-mechanical, electrical, integration and safety related been identified and taken into consideration in the design? Are the interfaces with neighboring elements well defined and documented? Is the procurement strategy appropriate given the time constraints of the HL-LHC project? Is the assembly procedure well defined and the plans for the assembly facilities, tooling, and personnel, appropriate and compatible with the other activities? Are the quality control plan and the relating tests adequate? Is the proposed schedule realistic?

Connection cryostat LEP(R/L)A LEP(R/L)B As we are doing with the 11T, we replace the existing cryo-assembly with 3 independenly installed units. Each unit is aligned independently. The collimator is installed after the bypass cryostat is in place. From Delio’s presentation

General good quality of the presentations, well prepared. In the large majority of the cases the design foresees ‘standard’ or already tested solutions. Therefore the project looks under control. We spotted a few points that needs some further thinking / consolidation

Q1 Are the design and the specifications for procurement at the level of maturity appropriate to start the production? Yes We assume the use of the specifications of the already existing objects.

Q2. Have all the relevant constraints, e. g Q2 Have all the relevant constraints, e.g. thermo-mechanical, electrical, integration and safety related been identified and taken into consideration in the design? Almost yes with a few points to be checked Connection to line M must have high hydraulic impedance. To be checked. Tolerances are very tight (golden or silver level?). Tuning systems are accessible only during the assembly. Transport issues (vibrations, protection of delicate extremities). Punch system to center the beam pipe in the shell. Stability during thermal cycles? Check metallurgical status (cracks). Electrical safety around the extremity connections must be improved (next slide). Torsion and rotation of the bus bars during the assembly and use. Need of one fix point to avoid rotation. The system gives a local hydraulic restriction in the insulation vacuum volume. Safety valves (quantity, position, release pressure) should be checked. (Valid for the 11 T magnet as well).

Electrical insulation should be revisited in view of increasing margin and robustness, especially but not exhaustively in the following areas  : Lyras protection End cover inner surface insulation Insulation of the tubes going through the shuffling modules (beam lines, heat exchanger,…) Sharp edge of nozzles Dipole lyras of the neighbouring dipoles

Q3. Are the interfaces with neighboring elements well defined and Q3 Are the interfaces with neighboring elements well defined and documented? Yes We do not have too much to say. Standard machine configuration.

Q4 Is the procurement strategy appropriate given the time constraints of the HL-LHC project? Today it is reasonable. Tight time for tendering of some components but still ok. In case of problems with one supplier there is not a lot of margin. Project engineers could be very loaded, especially if there will be issues with the procurement of some critical components. The assembly periods are moving targets embedded into the 11T programme. Fine, but one need flexibility in case of shifts and delays. Bus bars. One firm only (Turkey).

Q5 Is the assembly procedure well defined and the plans for the assembly facilities, tooling, and personnel, appropriate and compatible with the other activities? Globally yes. The document we saw is a good starting point defining the assembly sequence. Tools look fine. The number of identified personnel is fine. We can not judge if the required personnel will be available in due time (compatibility with other activities). An industrial contract to provide the necessary personnel for assembly in the beginning of 2018 seems unrealistic

Q6 Are the quality control plan and the relating tests adequate? There is the need of some work to complete the plan. Test plan and acceptance criteria to be defined. Measuring systems and procedures to be defined. Those points were mentioned but not totally explained during the review. The cold test is planned without current in the bus bars. The overhead/possibility to power (some) of the main bus bars during the cold test should be studied. This could give useful information. We noted that a pneumatic test at 1.26 times the design pressure is acceptable for safety.

Q7 Is the proposed schedule realistic? At the moment and within what we know, yes. The assembly periods are moving targets embedded into the 11T programme. Fine, but one need flexibility in case of shifts and delays.