Grid Modernization and the Energy Policy Act of 2005

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
NERC Orientation Joint Guidance Committee WECC Leadership
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
DOE’s Grid Modernization Activities Potential Roles for Equipment Manufacturers March 17, 2005 National Electrical Manufacturers Association William Parks.
DOE’s Implementation of EPACT’s Electricity Title and Related Provisions Larry Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western States Energy & Environment Symposium October 27, 2009.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
DOE Interconnection Activities Presented by: Eric M
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
The Transmission Imperative November 3, 2011 Jay Caspary.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 The State of the U.S. Grid: Recalibrating Risk and Regulation Husch Blackwell Sanders LLP Hoecker Energy Law & Policy PLLC Former Chairman, Federal Energy.
“Transmission Siting and The Federal Landscape” Remarks of James J. Hoecker Husch Blackwell Sanders Former Chairman of the FERC Public Participation In.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
US Priorities for New and Renewable Energy Technologies Cary Bloyd Argonne National Laboratory APEC Expert Group on New and Renewable Energy Technologies.
United We Ride: Where are we Going? December 11, 2013 Rik Opstelten United We Ride Program Analyst.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Overview of WECC and Regulatory Structure
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Office of Electricity Transmission and Distribution September 2003 Marshall Reed U.S. Department of Energy.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
GETTING ENOUGH COAL: MORE THAN A THREE LEGGED STOOL DAY ONE KEYNOTE: NOVEMBER 2, 2006 COAL NEEDS POWER COMPETITION TO SUCCEED John E. Shelk.
Energy Efficiency Action Plan Larry Mansueti Director, State and Regional Assistance Office of Electricity Delivery and Energy Reliability U.S. Department.
1 DOE Office of Electricity Delivery and Energy Reliability David Meyer – May 2005 Developing Policy Options To Enhance Security of Energy Supply for Electricity.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
We Make Housing Affordable
REFLECTED IN JAMAICA’S ENERGY POLICY
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010
Natural Gas Infrastructure Assessment
ERCOT Technical Advisory Committee June 2, 2005
Transmission: the Critical Link
Massachusetts Electric Restructuring Roundtable
The Future of Demand Response in New England
Module 4 Smart Grid Implementation Issues
NEI Perspectives on Small Modular Reactors
NASUCA Mid Year Meeting Gas Reliability
Iowa Energy and Policy Issue Discussion
Clair Moeller Mid-Continent ISO
Transforming Scenario Narratives into Study Cases
Long Term Grid Assessment – Preparing for 2018 Studies
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Gordon van Welie, President & Chief Executive Officer
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Comments on New England Regional State Committee*
July update JANUARY 2019.
Presentation transcript:

Grid Modernization and the Energy Policy Act of 2005 PSERC Summer Planning Workshop August 1, 2005 Grid Modernization and the Energy Policy Act of 2005 David Meyer Office of Electricity Delivery and Energy Reliability U.S. Dept. of Energy

Overall Office Mission Office of Electric Delivery and Energy Reliability (OE) Overall Office Mission Lead national efforts to modernize the electric grid, enhance security and reliability of the energy infrastructure, and facilitate recovery from disruptions to energy supply.

Office of Electricity Delivery and Energy Reliability (OE) Office of the Director Resource Management Staff Permitting, Siting, & Analysis Infrastructure Security & Emergency Response Research & Development Transmission Reliability Electric Distribution Transformation Electricity Storage Superconductivity GridWorks GridWise Infrastructure Security Technology Visualization and Decision Analysis Tools Analysis and Modeling Electric Markets Technical Assistance Electricity Exports/ Presidential Permits Power Marketing Administration Liaison Energy Infrastructure Protection State/Local Gov’t Partnerships Training and Exercises Visualization Critical/Vulnerability Assessment Emergency response support Here’s how we are organized. Yada yada yada

Grid Modernization – A Presidential Priority “…We have modern interstate grids for our phone lines and our highways. It's time for America to build a modern electricity grid.” April 27, 2005 President George W. Bush

Transmission: Uncertainty Breeds Under-Investment Uncertainties Long-Term Under-Investment Public Interest at Risk Annual Average Growth Rates in U.S. Transmission Capacity and Peak Demand Economic growth, jobs creation Stability of regional wholesale power markets Consumer electricity bills Public health and safety Energy security and reliability Environmental quality Industry structure– who will build/own/operate new transmission? Financial risks and regulatory uncertainties Protracted siting and permitting processes States - “Patchwork quilt” Federal – legislative logjam Growth Rate (%/year) Transmission (GW-miles) Summer Peak (GW) Source: Hirst, E. “U.S. Transmission Capacity: Present Status and Future Prospects.” June 2004. Note: Regional circumstances vary – but all regions face transmission shortfalls and need to plan capacity expansion programs

Major Congested Grid Paths, 2002 Transmission bottlenecks are extensive. Several can be classified as “national interest” bottlenecks. Economic growth and security issues threatened unless they are addressed. Source: National Transmission Grid Study, DOE, 2002

PSA Strategy: Forge concerted efforts at regional level to modernize nation’s electric grid, using new technologies to best advantage. Show need for new grid, urgency of using current window of lead time effectively. Build partnerships with national, regional and state organizations that have key roles in electricity markets; foster regional plans. Use outstanding experts from labs, universities, other sources to provide objective technical assistance.

Energy Policy Act of 2005: Reliability Creates legal foundation for mandatory and enforceable national electric reliability standards Establishes FERC jurisdiction for reliability ERO will develop and propose technically sound standards FERC will review, approve, and enforce standards OE will provide technical support to FERC and ERO Next steps: FERC to issue rules re certification of ERO within 180 days. NERC likely to apply for certification. Regional councils likely to become “regional entities” under ERO.

Energy Policy Act of 2005: Transmission Investment DOE (OE) to do transmission congestion study and designate “National Interest Electric Transmission Corridors (NIETCs)” every 3 years FERC given backstop siting and permitting authority for facilities in corridors DOE (OE) to coordinate federal review of non-NIETC transmission projects, at applicant request

Regional Energy Planning (1) Substantial amounts of new generation will be needed in all regions over the next two decades. Much of this generation will be coal, renewable, nuclear, and Canadian imports – sited distant from load and requiring new transmission capacity. Result: Regional planning is essential. Time is short. Penalties for inaction could be severe.

Expected Capacity Additions by Region and Fuel, 2004-2015 (Gigawatts, EIA, AEO 2005)

Expected Capacity Additions by Region and Fuel, 2015-2025 (Gigawatts, EIA, AEO 2005)

Regional Energy Planning (2) OE support for institutionalization of planning in West FY03-05 multiyear grant to the Western Governors Association In-kind technical assistance by LBNL and Regulatory Assistance Projects experts to WGA coordination and planning committees Western Governors approved June 13 resolution calling for a west-wide fee on electricity to fund regional planning (nickel per customer per year) Supported initial efforts to identify Western “pre-approved energy corridors” across federal lands

Regional Energy Planning (3): Rise of Proposed Mega-Projects Frontier Line Project: ~12 GW (Wyoming coal and wind) to serve loads in Utah, Nevada, California Northern Lights: Cogeneration at Alberta tar sand sites, other generation to serve loads as far south as Phoenix Mountaineer Project: Midwestern coal to serve loads in mid-Atlantic region

Regional Energy Planning (4): Objectives An industry-based group (RTO, regional council) should be balanced by some state-based policy group (RSC, other). Industry group should develop a technically sound conceptual design for next-generation electric infrastructure. Policy group should identify the 10-15 major policy obstacles to bringing plan to reality. OE can assist these processes and solution of policy obstacles – but state-level leadership is essential.

Regional Energy Planning (5) Mega-projects, if they go forward, can become laboratories for many OE/PSERC efforts: -- Support for open, transparent planning processes; regional cost-allocation plans; regional siting protocols; consideration of non-wires alternatives -- Use of new OE-supported technologies to best advantage -- Incorporation of concepts and technologies for improving physical and cyber security of grid