CLIC Civil Engineering & Infrastructure

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Preliminary Studies of the Electric Power Distribution for CLIC
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Agenda : CLIC Civil Engineering and Services (CES) WG.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
ILC Utility Design Study for Kitakami-site
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
FCC Civil Engineering Optimisation and Design Development
SUPERB site status report for layout v12
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CLIC Civil Engineering Update
CLIC Civil Engineering & Infrastructure Working Group Meeting
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Experimental hall design in Japanese site
Innovative He cycle Francois Millet.
Americas KlyCluster Cost Analysis Overview
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
5th FCC Infrastructure & Operation meeting
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
(Potential) Site and Utilities
FCC-ee MDI Civil Engineering update
A very first look at siting issues
Civil Engineering for FCC-eh IR
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
Detector hall in mountain regions
Workshop on fire protection for physics research facilities
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

CLIC Civil Engineering & Infrastructure John Osborne – Matthew Stuart SMB-SE-FAS CLIC Project Meeting 03/10/2017 – John Osborne & Matthew Stuart

Introduction - Content Who is involved and what are the objectives of the CEIS Working Group? Updates since the CDR? Civil Engineering Cooling and Ventilation Electrical (CLIC Power Supply). Further Study for each discipline within the CEIS Working Group. CLIC Project Meeting 03/10/2017 – John Osborne & Matthew Stuart

Main CEIS study areas Discipline Civil Engineering Survey and Alignment Transport Installation Safety Systems Cooling and Ventilation Electrical General Objective: Develop the existing layouts for the project from a civil engineering and technical infrastructure point of view, and work with the various actors towards a realistic design and project planning as needed for the ‘CLIC Implementation Plan’, due late 2018. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What are the Objectives? Specific responsibilities: Develop new and/or update civil engineering layouts for 380GeV, 1.5TeV and 3TeV machine. Develop new civil engineering layout for 380GeV machine using Klystron technology. Update the tunnel design and layout to accommodate the machine (e.g. ventilation, electrical equipment, survey, controls, safety and handling equipment). Develop a layout for the interaction region. Study environmental aspects of the project and siting preparation. Work together with ILC on areas of synergy. Produce schedule and cost estimates. Consider and update transport, installation and CERN logistics issues for the project. Technical infrastructure and installation scheduling. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done – Civil Engineering Drawings 1. Civil Drawing Update All Layouts have been updated for the 380 GeV, 1.5 TeV & 3TeV Drive Beam design. New layouts and cross-sections produced for the 380 GeV Klystron design. Surface building plans updated. Preliminary 3D schematic of CLIC has been produced. Interaction region has been updated to show the new single detector layout. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done – Civil Engineering Tunnel Optimisation Tool CLIC proposals: Main Map Layer Includes different surface and subsurface constraints. Detailed information of Individual Shafts Geological cross-section User Inputs: IP co-ordinates IP Depth Angle of rotation – vertical and horizontal plane. Energy stage Outputs Shaft lengths Tunnel and Shaft geology Depth of tunnel below any watercourses Amount of clashes with geothermal boreholes. % of tunnel passing through depressions with complex geology. Comparison Overview Page showing an overview of the options Can compare up to 3 options side by side. Example of CLIC 1.5 TeV Machine Tunnel Horizontal Rotation Vertical Rotation CLIC Tunnel Optimisation Tool – The tunnel optimisation tool has been produced to provide a means of analysing the possible locations for CLIC, it allows the user to look in detail at a number of factors that need to be considered when choosing a location for the different energy stages. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done – Civil Engineering Two options for the Klystron Tunnel have been looked at: 10m wide Roadheader mined tunnel. Shape can be determined by tunnel requirements. No wasted space below the tunnel floor. Can mine through “bad rock” 10m internal Diameter TBM Bored tunnel. Considerably quicker rate of excavation through “good rock”. Cheaper per m of tunnel construction for this length of tunnel. Under floor space can be utilised for services to avoid wasted space. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done – Civil Engineering 10m Internal Diameter TBM tunnelling method is proposed for the Klystron 380 GeV design: The cost for an 11km tunnel for the TBM is 10% cheaper than a mined tunnel. The underfloor space can be utilised and therefore reduce the amount of wasted space. The excavation rate per m of tunnel is considerably quicker for a TBM and therefore construction time is reduced. The geology for the 380 GeV is expected to be majority molasse. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done - CV The cooling and ventilation is a critical aspect of the tunnel integration design as it has a large effect on the required dimensions of the tunnel cross-section. Due to changes in the heat loading dispersed to air and water new solutions have had to be looked into. Centralising cooling towers results in huge pipes and booster pump requirements. Cooling: New cooling towers proposed at points 4, 5, 8 and 9. CDR tunnel ventilation not adapted for the huge air loads in the main tunnel. Ventilation: Insulate/Encapsulate CLIC Modules – Install heat exchangers or fans inside the “box”. Increase allowable temperature in the tunnel. Install AHU machines to tackle heat load locally 48MW 40MW 21MW CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

What has been done – Electrical (CLIC Powering) Grid Design Solution: Since 2012 TE/EPC has focussed on RF powering and has made steps toward the powering grid design, this includes the proposed solution as seen here: 6 sectors for RF power distribution (3 TeV) Each sector needs a substation/location. One substation needs an indoor space of (very roughly): ~ 1500 m2 x 10m height EN/EL - Availability of Power: Power available at European grid level 200MW available at each 400kV source. Approximately 70,000m2 of outdoor surface space to be allocated for connection to the 400kV European grid. Existing European Grid Node I  III II Drive beam injector Main beam injector Experimental buildings 2140m CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

Further Study Transport: Cooling and Ventilation: Safety: An updated items list for transport is required for both the Klystron and the Drive beam design. Decision to be made on travelling crane or vehicle transport within the drive beam building. Transportation logistics need to be studied to allow a construction and installation schedule to be produced. Cooling and Ventilation: Update of heat loads from ALL users is required to allow a solution to be implemented properly. Smoke extraction and radiation protection systems need to be integrated into the requirements (to be done with safety). Finalise the solutions for both Cooling and Ventilation. Safety: Identification of hazards and mitigations that fall under standard procedure. Hazard register to be produced and populated by all disciplines. HSE meetings to be arranged for each discipline to identify associated hazards. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

Further Study Survey and Alignement: Civil Engineering Electrical: Lattice file translations required for the 1.5 TeV and 3 TeV Drive Beam design. Civil Engineering Use CLIC TOT to optimise the position of the tunnel for the different energy stages. Continue to update and integrate all disciplines into the surface and tunnel layouts and designs. Electrical: Electrical equipment requirements for both the Drive beam and the Klystron design are to be integrated into the tunnel design, including electrical alcove requirements. Power supply for CLIC from European grid level requires consultation and approval from authorities. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

Summary CEIS Working Group: Meetings for the CEIS Working Group are taking place every 5 weeks to ensure full integration of the work done by each discipline. Full Activity tracker updated at each meeting outlining the tasks for each discipline. Updates since CDR: Civil Engineering Layouts have been updated and new Klystron layouts have been produced. CLIC TOT has been produced and is available to start optimising the position of the CLIC tunnels and surface locations. HVAC has been studied in more detail, the heat loads have been updated and new cooling and ventilation systems/solutions have been proposed. CLIC Power supply requirements have been proposed with an update on the substation requirements and the connection to the European grid. Further Study: CLIC tunnel optimisation to be studied in detail. Solutions proposed for the cooling and ventilation require input from all disciplines responsible for heat loading so a more detailed design can be produced. Agreement for local authorities required for connection to the European grid. Safety to produce and populate a hazard register for the CLIC Project. Transport design and schedule to be completed – requires an updated list of items that are to be transported throughout the shafts and tunnel. Survey and Alignment to provide lattice files for the 1.5 TeV and 3 TeV energy stages. CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

Thank You For Your Attention Thank you to all contributors from the CLIC CEIS Working Group CLIC Project Meeting 03/10/2017 – Matthew Stuart & John Osborne

Accelerating structure Cooling CDR Baseline Sector 3 Accelerating structure Facilities divided into 5 cooling sectors according to: Functional and operational requirements Thermal loads Dimensions & geographical distribution - Facilities (Drive beam injector building) - HVAC and cooling plants (keep reasonable size) - Environmental impact: no cooling towers on surface points -> centralised in Prévessin Sector 4 UTRs, dumps, loops Sector 1 Sector 2 Sector 5 Detector premises

Cooling: proposed modification Cooling towers in surface points: Pt 4, 5, 8, 9 Advantages: Smaller pipe diameters in tunnel Lower electrical power requested (25%) No need for booster pumps Bypass, connection to drain: simpler if still needed Easier operation (balancing of circuit, …) Disadvantages: Stronger environmental impact (outside CERN) Bigger surface needed for installation Impact on shaft dimensions? However: manifold issue still present CLIC CEIS Working Group Meeting 25.08.17 - A. Mejica / M. Nonis