Online check lists Half Sector Test

Slides:



Advertisements
Similar presentations
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Injection test? Mike Lamont For initial discussion.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
Michael GalonskaWAO ´12, August Five years of operation at HIT Daily Performance Check & Beam Time Statistics M. Galonska, S. Scheloske, R. Cee,
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 1. Some recent views ( ) 2 Linac tunnel
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
The Stripping Foil Test Stand in the Linac4 Transfer Line
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Schedule IT General Schedule 9 th, September 09 Today.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
PSB H - injection system commissioning J.Borburgh, C.Bracco, C.Carli, E.Carlier, B.Goddard, K.Hanke, B.Mikulec, J.Hansen, C.Maglioni, A.Newborough, D.Nisbet,
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Wim Weterings Remy Noulibos
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
LCLS Commissioning & Operations High Level Software
Operations Machine Simulator.
A monitoring system for the beam-based feedbacks in the LHC
DRY RUNS 2015 Status and program of the Dry Runs in 2015
J.-L. Sanchez Alvarez(PSB-EIC)
Review of the Machine Protection System in the PS complex
Configuration Management and Layout Database ELENA Project
European Organization for Nuclear Research
LINAC4 50 MeV phase BIS STATUS
The LHC - Status Is COLD Is almost fully commissioned
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
HALF SECTOR TEST: a test for the future PSB injection
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Summary of week 7 Hardware Commissioning:
Update on Linac4 Status, Reliability Run and Modelling
LCLS Commissioning & Operations High Level Software
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Attendance Management software
ThomX – Commissioning Meeting – 25/01/2018
New page for summary of test status
LHC An LHC OP guide… under construction J. Wenninger
SPS Injection BIS - Draft requirements
Presentation transcript:

Online check lists Half Sector Test Chiara Bracco, Greta Guidoboni, Bettina Mikulec IRWG meeting #15 4 August 2016

(example in chronological order) Online check lists DEF: Online tool with list of operations to be performed in order to: Guarantee the correct machine startup. Provide an history of the results. MACHINES LHC LINAC ISOLDE GPS HRS REX SPS CPS LINAC4 HST Phase1 Operation Phase2 … 1) DISPLAYED ORDER of operations Chronological and grouped in phases. Type and grouped in categories like magnets, interlocks, beam instrumentations, … 2) DEFINITION of operations Target(s): Device (magnets, beam instrumentation…) Functionality (setup cycles for machine operations, beam setup,…) Test(s) : anything acting on the target. AREAS List of operation (example in chronological order)

2) Pre-Requisites with 160MeV beam to L4 dump Half Sector Test (HST) LINAC4 Temporary installation in the transfer line (L4T) from Linac4 to the Booster. Test of part of the new PSB injection 5 PHASES. Combination of: Hardware commissioning Operation setup of a new machine (Linac4) Beam measurements August September October November December 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 DR 160 MeV beam commissioning HW tests HST beam commissioning 2) Pre-Requisites with 160MeV beam to L4 dump 4) HST LI beam measurements 1) Pre-Requisites without beam 3) Steer LI beam to HST 5) HST HI beam measurements

Chronological sequence HST interface: Phases Link Click to open the list of operations Phases Chronological sequence

HST interface: List of Operations Click on it to see the target(s) and test(s) WAIT! do all the operations have the same type of description? List of operations Chronological sequence

HST interface: Type of Operations DEFINITION of operation Target(s): Device (magnets, beam instrumentation…) Functionality (setup cycles for machine operations, beam setup,…) Test(s) : anything acting on the target. 1) DEVICE CHECK: group of devices that undergoes the same type of tests Targets Polarity check OASIS … Bending Quadrupoles Correctors How it looks like on the interface Magnet check Target: devices Test: list of tests to be performed

1) Device check Target

HST interface: Type of Operations DEFINITION of operation Target(s): Device (magnets, beam instrumentation…) Functionality (setup cycles for machine operations, beam setup,…) Test(s) : anything acting on the target. 1) DEVICE CHECK: group of devices that undergoes the same type of tests 2)TO DO list: List of operations to be performed Pre-Requisites without beam Setup 2 new cycles: L4 dump destination HST destinations Test PPM operation Apply PSB master timing for L4 operation Targets Polarity check OASIS … Bending Quadrupoles Correctors Magnet check Target: devices Test: list of tests to be performed 2 descriptions

Des. 1 HST interface: Type of Operations DEFINITION of operation Target(s): Device (magnets, beam instrumentation…) Functionality (setup cycles for machine operations, beam setup,…) Test(s) : anything acting on the target. 1) DEVICE CHECK: group of devices that undergoes the same type of tests 2)TO DO list: List of operations to be performed Pre-Requisites without beam Setup 2 new cycles: L4 dump destination HST destinations Test PPM operation Apply PSB master timing for L4 operation Targets Polarity check OASIS … Bending Quadrupoles Correctors targets Magnet check Des. 1 Target: devices Test: list of tests to be performed Target: functionalities Tests: done/not

Des. 1 2) TO DO LIST Target Test results Click here to open the test description

Des. 1 2) TO DO LIST Use the number as a correspondence with the target Target Test results Click here to open the test description

Des. 2 HST interface: Type of Operations DEFINITION of operation Target(s): Device (magnets, beam instrumentation…) Functionality (setup cycles for machine operations, beam setup,…) Test(s) : anything acting on the target. 1) DEVICE CHECK: group of devices that undergoes the same type of tests 2)TO DO list: List of operations to be performed Pre-Requisites without beam Setup 2 new cycles: L4 dump destination HST destinations Test PPM operation Apply PSB master timing for L4 operation Targets Polarity check OASIS … Bending Quadrupoles Correctors tests Magnet check Des. 2 Target: devices Test: list of tests to be performed Target: ? Tests: action in the list

Des. 2 2) TO DO LIST Target Keep the name of the operation

Des. 2 2) TO DO LIST One description per test! Target Keep the name of the operation

Any other idea, suggestion, request, deadline? Short SUMMARY Machine checkout Definition Description: machines, areas, list of operations Half Sector Test Identification of lists of operations Definition: targets and tests. Type: Device check / To Do list (2 descriptions). Is it the same for the other machines? …discussion? Any other idea, suggestion, request, deadline?

Thanks for your attention! Next steps Import data: structure of the .csv file Add category/group/device/tests from the interface (Admin) Add results: Possibility of multiple selection Possibility to add a tag (eg: blocker) Weighted tests? Export data … HST requests: Add weight to the tests Keep element order as in the input file Remove unicity of a device Thanks for your attention! Thanks to Emanuele Matli and Przemyslaw Piotr Hardyn for the great job on the interface!

Half Sector Test: Phases August September October November December 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 DR 160 MeV beam commissioning HW tests HST beam commissioning Pre-Requisites with 160MeV beam to L4 dump Check ppm operation Vary beam current (chopper) Identify min. current for BCTs and BPMs HST LI beam measurements Aperture check BSW chicane tuning Stripping foil efficiency H0/H- sensistivity/dump calibration Vary beam current (chopper) and beam size Pre-Requisites without beam Setup 2 new cycles: L4dump and HST destinations Apply PSB master timing for L4 operation Configure YASP Plug in magnet settings for the 2 new cycles (include PSB beam size at TKSTR) Prepare table for chopper patterns Hardware commissioning (without beam) Steer LI beam to HST Check instrumentation Beam position measurement before and after HST Check BSWs functionality Send beam to L4T dump and check the dump Check beam interlocks (OPT) kick response HST HI beam measurements Same tests as for LI Optional: - tests with permanent STKR - Kick response - optics measurement in L4Z