Summary of iKAGRA Test Run Apr 11-25, 2016

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

8/13/2004 Stefan Ballmer, MIT / LIGO Hanford 1 Length and angular control loops in LIGO Stefan Ballmer Massachusetts Institute of Technology LIGO Hanford.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
LIGO- G060XXX-00-R E2E meeting, September How to design feedback filters? E2E meeting September 27, 2006 Osamu Miyakawa, Caltech.
Virgo Control Noise Reduction
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Interferometer Control Matt Evans …talk mostly taken from…
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Martin Hewitson and the GEO team Measuring gravitational waves with GEO600.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
Summary of iKAGRA Test Run Apr 11-25, 2016 Yuta Michimura Department of Physics, University of Tokyo May 9, 2016JGW-T
Daniel Sigg, Commissioning Meeting, 11/11/16
Summary of iKAGRA Test Run Mar 25-31, 2016
ALS Noise Budget and Model Status Report
ALS HIFO-X Noise Budget and Model Status Report
A study of Arm Length Stabilization in KAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of Virgo GWDAW Dec 13-16
GEO – VIRGO joint noise hunting project
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Frequency Noise in Virgo
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Advanced LIGO optical configuration investigated in 40meter prototype
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Presentation transcript:

Summary of iKAGRA Test Run Apr 11-25, 2016 JGW-T1605177 May 9, 2016 Summary of iKAGRA Test Run Apr 11-25, 2016 Yuta Michimura Department of Physics, University of Tokyo

Quick Facts 3 km Michelson, dark fringe lock input power to BS ~ 220 mW power at detection port (REFL) ~ 4 mW duration: Apr 11 9:00 JST - Apr 25 17:00 JST (from 1144368017 to 1145606417 in GPS time) duty cycle (lock): 90.4 % (IMC was 98.5 %) total locked time: 257.7 hours (from Apr 13) longest lock: 21.3 hours (typically ~ 2 hours) strain sensitivity: ~6e-16 /rtHz @ 100 Hz (~??? pc for 1.4Msun-1.4Msun NS-NS inspiral range) Thanks to inputs from K. Kokeyama, Y. Aso, A. Shoda, M. Nakano, Y. Enomoto, T. Shimoda, K. Hayama, S. Mano, Y. Shikano, etc ……

Update from March Run RF dark fringe lock instead of DC mid fringe (klog #1388), UGF servo at 94 Hz. Folded oplev for ETMs to reduce length to angle coupling (klog #1355, #1406) IMC servo topology changed; crossover frequency 30 Hz to 10 Hz, oplev DC servo turned off, dither alignment installed (klog #1386, #1449, #1484, #1507, #1508) PR2-BS duct was connected GVs close to IXA/IYA were opened (klog #1338) See JGW-T1605101 for basic configurations See ChannelList wiki for the channel list and summary of some detailed settings (Suspensions wiki for suspension configuration summary, OplevCalibration wiki for oplev summary)

Apr 12 Commissioning Break Test run was stopped during Apr 12 13:00 to Apr 12 16:10 for commissioning works Actuator gain monitor was added (klog #1506) MCi feedback was added for IMC length loop, and filter setting was modified (klog #1507, #1508) PZT loop was modified for IMC length loop Also, guardian bug was fixed on Apr 13 (klog #1506) MICH_LOCK OPERATION state is valid only from the run starting at Apr 13 10:54:30 (JST) These changes are summarized in ChannelList wiki

Calibration calibration of error signal (optical gain) 5.7(1)e10 counts/m (klog #1610; IPython NB) calibration of feedback signal (actuator efficiency) 2.6(1)e-9 m/counts @ DC (klog #1340; IPython NB) calibration lines at 80 Hz for UGF servo (UGF controlled at 94 Hz) and at 135 Hz for loop gain monitor, other independent lines for monitoring actuator efficiency change Michelson differential displacement [m] error signal K1:LSC-REFL_PDA1_RF17_Q_ERR_DQ Michelson optical gain 5.7e10 counts/m calibrated in L*h(t) [nm] K1:LSC-MICH_CTRL_CAL_OUT_DQ online calib calibration lines (80 Hz, 135 Hz) Actuator (klog #1340) ETMX: 1.6e-9 m/counts at DC, f0=0.92 Hz, Q= 5.1 ETMY: 1.0e-9 m/counts at DC, f0=0.94 Hz, Q = 4.6 combined: 2.6e-9 m/counts at DC Filter zero at 0.2,70 Hz pole at 0.02,2000,2000 Hz DC gain 500 UGF servo UGF servo signal K1:LSC-UGF_SERVO_OUT_DQ

Actuator Gain Monitor independent lines; 111 Hz for ETMX, 113 Hz for ETMY, 115 Hz for BS (klog #1506) actuator gain monitor signal is effected by Michelson optical gain change available only from Apr 12 16:10 Actuator gain monitor signal K1:LSC-ACT_DEMOD(1|2|3)_(I|Q)_OUT_DQ (1 for ETMX, 2 for ETMY, 3 for BS) Michelson differential displacement [m] error signal K1:LSC-REFL_PDA1_RF17_Q_ERR_DQ Michelson optical gain 5.7e10 counts/m calibration lines (111, 113, 115 Hz) Actuator (klog #1340) ETMX: 1.6e-9 m/counts at DC, f0=0.92 Hz, Q= 5.1 ETMY: 1.0e-9 m/counts at DC, f0=0.94 Hz, Q = 4.6 combined: 2.6e-9 m/counts at DC Filter zero at 0.2,70 Hz pole at 0.02,2000,2000 Hz DC gain 500

Duty Cycle duty cycle: 90.4 % (98.5 % for IMC) was 85.2 (94.4 % for IMC) during March Run March Run April Run data processing by S. Mano plot by Y. Michimura Plot generated using K1:GRD-IMC_LOCK_STATE_N and K1:GRD-MICH_LOCK_STATE_N. Duty cycle for MICH on Apr 11 and 12 is not plotted because there was a bug in guardian state. Kumamoto Earthquake, BS went wrong (klog #1550, #1553)

Lock Duration longest lock: 21.3 hours (23.5 hours for IMC) data processing and plot by S. Mano locks less than 10 min is not plotted (frequency was 139) locks less than 10 min is not plotted (frequency was 55) ~2 hours

Tidal Drift X arm length and Y arm length drifted by ~30 um/day, ~100 um for whole period plot by K. Hayama

Openloop Gain Drift MICH openloop gain drifted by ~20 % (likely by alignment drift) drift was ~80 % during March Run time series plot of K1:LSC-UGF_SERVO_OUT16 (openloop gain at 80 Hz) by Y. Shikano

Actuator Gain Monitor drift is mostly in common to all the suspensions  → likely to be MICH optical gain drift (actuator drift was less) more investigation, calibration needed BS ETMX ETMY calculation done using K1:LSC-ACT_DEMOD(1|2|3)_(I|Q)_OUT_DQ by Y. Shikano

Inspiral Range average: ??? pc standard deviation: ??? pc for 1.4Msun-1.4Msun NS-NS strain sensitivity fluctuated by roughly 1 order of magnitude Apr 21, 2016 (includes data when unlocked; but duty cycle was 99.1 %) plot by K. Hayama

Noise Budget limited by seismic noise below ~4 Hz, acoustic/fan noise at around 100 Hz (see also klog #1715), ADC noise above ~3 kHz (see also klog #1688) unknown noise at around 10 Hz above NoiseBudget is generated when fans were on, whitening filters were off plot generated with Simulink NoiseBudget by T. Shimoda, M. Nakano (klog #1568, #1705)

Some Issues to Remember Unknown 550 Hz LPF in MICH loop (klog #1645) also, DGS delay in 3km arm is not measured yet (?) so, phase delay in OLTF is not fully understood Unknown sensitivity improvement over 2 kHz after Apr 12 commissioning break (klog #1531) Oplev calibration for IMC mirrors might be wrong and need to be checked (OplevCalibration wiki) Why there are no 60 Hz line noise?