EDI Requirements and implementation process

Slides:



Advertisements
Similar presentations
NCOAUG Training Day Summer 2008 Presentation Approve and Send Your Purchase Order via Possible Configuration Options (11i) Presented by Al Kannan,
Advertisements

Smart Connect – Supplier Portal Training Module 3 – Creation of Advance Shipment Notification.
Global Transport Label Requirements
New Features in Oracle Purchasing Presenter: Derk Weinheimer Phone:
Demands and Introduction of EDI (Odette) Date Odette reference for simplified handling unit. Pallet with frames. S123 S124 (ARD 7304) Article.
Communicating Information: and Attachments.
Click your mouse to continue. Ways to Merge Data When you have finished editing your main document and inserting the merge fields, you have several choices.
© TRW Automotive Holdings Corp Workflow description Implementation of the Volvo Packaging.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Verification After Testing Before submitting completed answer sheets, please ensure the following: All student names are filled in, legible, and spelled.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
ECommerce EDI Toolkit Version September What is EDI? EDI stands for Electronic Data Interchange EDI is the electronic exchange of business data.
Shipments Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Part Approval / Compliance Data Submission via Jotform.com
Payments Report Verification and Request March 2017
e-invoice guide for suppliers
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
DSQR Training Reliance System
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Resolve Invoice Exceptions
P2P Module: Ariba P2P INVOICING
Message for a finished ETID that is saved.
Create a PO-Based Invoice
and Attachments Communicating Information and Attachments.
ROUTE MANAGER TRAINING
Quality Assurance System Field Service Automation
Invoice Verification Workflow
Hiring Manager onboarding
Online Matching System
Initial points: Five-year post-tenure review is stipulated by both NJ Statutes and the NJ-AFT Agreement; process is governed by MOA 99 5-year review.
Training Presentation for Supply Chain Platform: BAE Systems
<General Information>
Field Trip Software Training
Section 2 <Ordering>
Survey Supply Ordering System Overview
DrayWatch Training November 2009.
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
Texas Instruments Supplier Portal- Web Invoice Overview
Global Engine Tracking System Overview - Supplier View
Global Engine Tracking System (GETS) Application Overview
Didier HUET Group Supply Chain Director
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Quality Management Systems – Requirements
Part Approval / Compliance Data Submission via Jotform.com
CAR Phase 22 Release Notes
VNSNY CHOICE Transition to HHAeXchange System
LGC Website, Software updates, Documentation, and Videos
Reporting 25 April 2018.
Intel Web PO/Invoice Supplier Overview
To the ETS – Encumbrance Online Training Course
The Interlink Express one hour delivery window
Distributor Want aka. Dis-WAnt
Orange ASP Training Module
Quality Assurance System Field Service Automation
Guidelines for foreign system developers of ENS
Smart Connect – Supplier Portal Training
SALES RECEIPT ASSOCIATE CUSTOMER
Smart Connect – Supplier Portal Training
i2B LIMITED – i2B ERP Integration – 2019 Q1
Ariba Light Account Supplier User Guide.
To the ETS – Encumbrance Online Training Course
Using the AIM Alternative Testing Module (for Instructors)
EDT Web Portal User Guide
Supplier EDI On-boarding Overview
Template for Start and follow-up meetings Integration between two companies based on BEAst Supply Material BEAst September 2019.
Presentation transcript:

EDI Requirements and implementation process 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

EDI capability GENERAL INFORMATION Volvo Car Corporation (Volvo Cars) have a 100 % EDI requirement towards all Suppliers of production material. The Supplier must be able to use electronic communication, including sending and receiving EDI messages according to Volvo Cars standard. The Supplier must have the ability to receive both short term and long term delivery schedules. Volvo Cars is using a third party to manage the EDI implementation; VOLVO IT. EDI is ALWAYS setup towards the manufacturing site (MFG), never towards a shipping site (SHP). The supplier must be aware that even though the Simplified (S) or the Homogenous handling unit (M) has been implemented, a supplier’s system must still be able to handle the Mixed handling unit (G). VCC may request a change of handling unit at any time. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

EDI standards Delivery schedule Dispatch note (ASN) Label Odette EDI standards used by Volvo Cars EDIFACT ver. 4.0, based on D96.A (DELFOR, DELJIT and DESADV) Odette Messages ver. 3.2 (DELINS, SYNCRO and AVIEXP) Delivery schedule Dispatch note (ASN) Label Odette DELINS (DELivery INStruction) AVIEXP (AVI d’EXPédition) Odette Tranport Label (OTL) EDIFACT DELFOR (DELivery FORcast) DESADV (DESpatch ADVise) Odette Transport Label (OTL) 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

Different Volvo Cars units use Different delivery codes Different Volvo Cars units make different use of delivery and forecast codes in the DELINS/DELFOR. DELFOR: SCC+4' DELINS: DEL+010306:0000+30:::4' 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

Delfor/DELINS backorder/Transit Long lead time for deliveries can show as a backorder or in transit in delivery schedules. Example: EU supplier deliver to China or China supplier deliver o EU DELFOR QTY+83:84‘ 83 =Backorder or in transit DELINS DEL+010305:0000+60: :3:1´ 3= Backorder or in transit Please note that backlog in delivery schedules may include quantity in transit. Backorder = depending on if there is any other delayed deliveries In Transit = total sum of goods in transit for this part number 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

EDI Logistic Flow Purchasing SAL MFG SHP VCC unit SAL = Sales office Orders, shipping routine Agreements + orders SAL MFG SHP Goods / labels DESADV (ASN) DELFOR/ Call off SAL = Sales office MFG = Manufacturing site SHP = Shipping site 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

EDI Implementation process Status 0 Status 20 Status 30 Status 50 Status 60 Status 80 Status 100 Initiation Full EDI The EDI implementation is performed in a series of steps where the supplier reaches a new status when they complete such a step. The steps/status levels are described in the following slides. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

Status 0 - Initiation The supplier is contacted via email by VOLVO IT. The person contacted will be the person who has been stated as EDI contact to Volvo Cars purchasing. The supplier receives information about the implementations process as well as an EDI Data Sheet. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

Status 20 – fill out and return data sheet The supplier shall fill out the data sheet with information necessary for the EDI implementation and return this data sheet to VOLVO IT as soon as possible. Do not forget to put the logical address (UNB-address) of your choice on page 2-3. Without all parameters the EDI communication cannot be set up. If the supplier uses a VAN company, the supplier should contact them to get the correct parameters. If the supplier needs Volvo Cars approval for the connection please notify VOLVO IT. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

STATUS 30 – Set up parameters, wait for first delivery schedule When the data sheet has been filled out and returned both parties set up the parameters in their systems accordingly. When the purchase order is released in Volvo Cars system, concerned Volvo Cars unit will send a DELFOR/DELINS to the supplier according to the attached gate plan. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

STAUS 50 – First delivery schedule has been sent, waiting for first ASN When the first delivery schedule has been sent out the supplier shall send a test dispatch advice note (DESADV/AVIEXP) to Volvo IT for verification. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

STATUS 60 – ASN verification VOLVO IT will quality assure the DESADV/AVIEXP according to the EDIFACT/Odette specification and Volvo Cars requirements. If there are errors in the ASN, VOLVO IT will notify the supplier with feedback on what needs to be fixed/modified. When the ASNs have been approved by VOLVO IT the supplier shall send ASN messages for ALL deliveries. An ASN shall always be sent within one hour after the goods have been loaded. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

STATUS 80 – LABEL verification Step 1: When the ASNs have been approved, the supplier will be asked by VOLVO IT to send via email (pdf) the Odette Transport Labels, corresponding to an existing and already sent DESADV/AVIEXP to Volvo Cars Unit. This is in order to validate the text contents and to compare the given data with the corresponding test DESADV. Step 2: When the pdf version of the label has been verified the supplier will also be asked to send, by post mail, the corresponding ODETTE Transport Label printed from their original printer. This is in order to validate the quality of the bar codes and the paper. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2

Status 100 – EDI implementation finished When the DESADV/AVIEXP message and the Odette Transport Label are in accordance with Volvo Cars specifications VOLVO IT will approve the supplier‘s EDI for operational use, as from the supplier‘s next delivery. The supplier will receive an email from VOLVO IT when this occurs. From that point, incorrect files and/or labels sent for production will lead to Administrative reports/fines. This is because these files/labels will be rejected and cause disturbances in our goods reception. 20160527 EDI - requirements and implementation process, Marie Thörnkvist(mthornkv) Issue 2