Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Global design effort 2007 DOE/NSF review Global design effort Americas Slide 1 April 2007 DOE/NSF ART Review - ILC Polarized Electron Source and Positron.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Ian Bailey University of Liverpool / Cockcroft Institute Positron Source Target Development Update Collaborators STFC Daresbury Laboratory, STFC Rutherford.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute ILC Baseline Target Collaborators STFC Daresbury Laboratory, STFC Rutherforord Appleton Laboratory,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Key luminosity issues of the positron source Wei Gai.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
CONVERSION EFFICIENCY AT 250 GeV A.Mikhailichenko Cornell University, LEPP, Ithaca, NY Presented at Positron Source Meeting Daresbury Laboratory,
1 Alexander Mikhailichenko Cornell LEPP, Ithaca, NY Linear Collider Workshop of Americas ALCPG, September 30, 2009 Albuquerque NM LITHIUM LENS STUDIES.
Undulator Based ILC Positron Source Parameters Wei Gai ANL ALLCPG 2011 March 20, 2011,
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
May Global Design Effort Americas Slide 1 May 2007 ILC Positron Systems Update J. C. Sheppard and V. Bharadwaj SLAC May 7, 2007.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Axel Brachmann, John Sheppard, Vinod Bharadwaj SLAC Particle Sources Efforts Review/Status and Plans SLAC HEP Program Review June 13 th, 2007.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
November 12, 2007 J.C. Sheppard/SLAC Slide 1 Thoughts on Remote Handling (taken largely [almost entirely] from Vinod Bharadwaj) (also a RIA movie from.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Polarised Positron Source Target and Collimator
University of Liverpool / Cockcroft Institute
A Positron Target Concept for the ILC
Update on e+ Source Modeling and Simulation
Pair-Production Target
Vinod K. Bharadwaj SLAC October 8, 2007
A. Brachmann and J. C. Sheppard SLAC April 30, 2007
May 2007 ILC Positron Systems Update
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Beam Dump outline work plan (UK perspective)
ILC RDR baseline schematic (2007 IHEP meeting)
May 2007 ILC Positron Systems Update
Summary for the Sources working group
J. C. Sheppard SLAC September 29, 2006
UPDATE OF POSITRON PRODUCTION CODE KONN
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS Positron Source Meetings RDR Beijing Positron Meeting Target & Remote Handling OMD Optics FLUKA validation experiment

Positron Source Layout

Meetings Regular meetings 10.30AM (PST) Wednesdays - positrons ANL, LLNL, SLAC,Cornell Alternate between hardware issues and optics Maybe expand the invitation list 08.00 AM (PST) Thursdays - target SLAC, Daresbury, RAL, DESY-Z, ANL, LLNL Alternate between target design & hall activation 08.00 AM (PST) Wednesdays – E166

Positron RDR Update Positron RDR , in good shape Numbers need to be checked and finalized Figures are fine, one or two could be even better April 1 deadline for complete RDR draft June or so for non-draft RDR & paper version EDR plans being hatched.. E166 getting closer to publishing!!!

Positron Collaboration Meeting ILC Positron Source Collaboration Meeting Collaboration to meet three times a year 1st meeting at RAL last November 2nd meeting in Beijing before GDE meeting Main web page : http://hirune.kek.jp/mk/ilc/positron/IHEP/ Summaries: http://hirune.kek.jp/mk/ilc/positron/IHEP/summary.html 19 attendees , 6-9-4 USA-Europe-Asia , 2 from SLAC : John & Feng)

Target Summary Topic Action Items: A. Target Systems (I. Bailey/ T. Piggott) Source alternative magnet solutions for first proposed UK target prototype - Ian B to coordinate. LLNL to evaluate DL target prototype design for vibrational modes and compatibility with water-cooling design (flow rates, etc) - Tom P to coordinate. Rationalise proposed UK prototyping wrt available funding - Ian B to coordinate. Continue evaluation of alternative target materials - Chris D to coordinate. Seek further clarification from BINP on their 1ms OMD work - Vinod B to coordinate. Adopt common geometry for eddy current simulations (based on UK prototype?) - Jeff G to coordinate. Beam window issue remains unresolved? Wei + Alexander to discuss.

Target Wheel

Target Hall Summary Topic Action Items: D. Target Hall (I. Bailey on behalf of V.B.) Evaluate dose rates for short times after shutdown (1 hour, 1 day) - Andriy (DESY) Complete detailed target station geometry for FLUKA - Luis (DL) Include material absorption effects in FLUKA simulations - Andriy (DESY) Carry out benchmarking of FLUKA using Ti alloy at SLAC - John (SLAC) Get feedback on impact of 53 hour changeover on availability - Vinod (SLAC) Evaluate need to include photon collimator in remote-handling module - Lei (Liverpool) Evaluate activation of water in water-cooled systems - Andriy (DESY) Evaluate shielding requirements compatible with 53 hour remote-handling schedule - Andriy (DESY) Evaluate achievable vacuum. Assess need to evolve pillow seal design. - Ian (Liverpool) Does ILC plan to have a central hot cell facility? - Vinod (SLAC) Develop detailed remote-handling scenarios - Mike W (RAL) Assess need for remote-handling for KAS - Vinod (SLAC)

Target Remote Handling Estimated 53 hour replacement time

Optical Matching Device (OMD) factor of 2 in positron yield (3 if immersed target) DC solenoid before target or pulsed flux concentrator after target Pulsed device is the baseline design Target spins in the magnetic field of the OMD Eddy currents in the target – need to calculate power Magnetic field is modified by the eddy currents – effect on yield?? Eddy current mitigation Reduce amount of spinning metal Do experiment to validate eddy current calculations Look for low electrical / high thermal conductivity Ti-alloys Other materials such as ceramics No OMD Use focusing solenoidal lens (1/4 wave) – lower fields OMD is upgrade to polarization!!!!!

Eddy Current Experiment Proposed experiment Layout at Cockcroft Institute/Daresbury (this summer) Eddy current calculation mesh - S. Antipov, W. Liu, W. Gai - ANL

Calculated Eddy Current Power Nominal RPMs

OMD Progress Baseline target Alternative target RAL, ANL and Cornell have done Eddy current simulation which produce consistent results with multiple codes. Estimates for power dissipation in the target are >100kW for a constant field and are considered excessive. Evaluation of ceramic target material is on-going. No conclusions. Radiation damage of the superconducting coil is still TBD but may not be worthwhile unless a solution can be found for the eddy currents. ANL simulation of beam heating in windows shows that an upstream window is feasible but a downstream window is not. Alternative target Capture efficiency for the lithium lens target and ¼ wave solenoid is still TBD Thermal heating and stress for the lithium lens is still on-going. Thermal stress calculation for the liquid metal target is still on-going

OMD Plans and Actions (baseline target): ANL will simulate eddy currents in the pulsed magnet configuration. UK will evaluate suitability of non-conducting materials for the target Daresbury/Cockroft/RAL will spin a one meter target wheel in a constant magnetic field and will measure the forces. Eddy simulations will be calculated and benchmarked against this configuration Plans and Actions (alternative targets): ANL will determine the capture efficiency for ¼ wave focusing optics and lithium lens. LLNL will evaluate the survivability of lithium lens to beam stress Cornell will specify an initial design of a liquid metal target. LLNL will calculate the Stress-strain behavior of the outgoing beam window.

Candidate Ceramics Titanium Alloy Ti-6Al-4V Grade 5 Annealed Isotropic Graphite IG-43 “Macor” Machinable Glass-ceramic “Shapal-M” Machinable Aluminium Nitride AlN Aluminium Nitride Si3N4 Silicon Nitride (Hot Pressed) “Sialon”Solid Solution BN Boron Nitride B4C Boron Carbide (Hot Pressed) SiC Silicon Carbide (Reaction Bonded) SiC Silicon Carbide (Hot Pressed) WC 94 / Co 6 Tungsten Carbide / Cobalt BeO 99.5% Beryllia Al2O3 99.9% Alumina ZrO2 / MgO Zirconia(Magnesia stabilised) YO99.9% Yttrium Oxide Carbon-Carbon

Optics Source optics laid out. Need to look at details Beam loss and collimation Component interferences (target halls, DR injection) Refine and document optics and beam physics

FLUKA Validation Experiment

FLUKA Validation Experiment SLAC/CERN Collaboration (RP groups) Validation of FLUKA activation calculations 100 W 30 GeV electron beam in ESA at SLAC Cylindrical copper dump Samples around the dump (including a Ti-4V-6Al) Look mr/hour and gamma spectrum from irradiated samples Run at the beginning of April …

Experiment Setup