UPPER FLOORS TIMBER AND CONCRETE.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Dr. Ruth Collins TrinityHaus
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
CEILING FRAMES Created by Michael Martin March 2004 / Revised Feb 2007.
CEILING FRAMES Created by Michael Martin March 2004
2.2 STRUCTURAL ELEMENT BEAM
Gable Roof BCGCA3007B.
Competency: Draw Wall Sections
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Gable Roof BCGCA3007B.
Walls Ron Gatepain constructionsite.
Unit 44 Ceiling Framing Ceiling Joists • Laying Out Ceiling Frames • Constructing Ceiling Frames • Attic Scuttles • Constructing Flat Roof Ceilings.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Skilled Trades 1201 Floor Framing
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
After the foundations have been completed the walls are set out and construction commences. wall structures.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
CONSTRUCTION AND DETAILING 1
Topic C1 Superstructures - walls
Prefabricated Timber Frame Construction
Plain & Reinforced Concrete-1 CE-313
Wall and Ceiling Construction
Structural Components
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Gable Roof BCGCA3007B.
Light Wood Frame Construction
Wall Framing Grimsby Secondary School Technology Dept.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
Lecture 15 - Timber Wall Framing Example
Residential Construction
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Floor Framing.
Learning Outcome Lesson Objective
Pitched Roof By PATEL ANKITKUMAR H.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
Structural Components
Floor System Sizes and Materials
COLLEGE OF AGRIL. ENGINEERING & TECHNOLOGY
CONCRETE AND SUSPENDED TIMBER
Prefabricated Timber Frame Construction
Do Now #7 What are the dimensions of the footing?
Competency: Draw Wall Sections
Types of ground floors.
Gable Roof BCGCA3007B.
Floors.
BUILDING CONSTRUCTION 1
Drafting 2 – Honors Architecture Ardrey Kell High School
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Competency: Draw wall sections and details.
•Connecting to the Foundation & Bearing
SECTION 4 FLOOR FRAMING.
Wood structures Topic 3 Floor Framing
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Components of Construction
Arch205 building construction floor & Roof systems
Unit 8 Floor Framing.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Competency: Draw Wall Sections
ROOFS.
Chapter 13 Concrete Form Design.
Presentation transcript:

UPPER FLOORS TIMBER AND CONCRETE

FUNCTIONS OF AN UPPER FLOOR Support imposed loads Not deflect under load Strength and stability Provide restraint for external walls Fire resistance (30 minutes) Limit sound transmission Principle Large timbers known as joists span from wall to wall on which a decking is placed to form a level floor

PLACEMENT OF JOISTS Span of joist in mm + 50mm 24 Joists are normally placed in position when blockwork has reached the required level Joists are spaced at 400mm c/c Rule of thumb calculation for depth of joists Span of joist in mm + 50mm 24 Example 4m span 4000/24 + 50 = 217mm use a 225 joist

CROSS SECTION: GROUND & UPPER FLOORS

CONSTRUCTION DETAILS Secured to wall at ends Built in 90mm min. Bearing End grain treated with preservative Mortar packed solidly around joist Note end of joist is tapered

JOIST BUILT INTO WALL

CONSTRUCTION DETAILS Secured to wall Galvanised steel joist hanger built into wall

JOIST HANGERS

CONSTRUCTION DETAILS Secured to parallel walls Bridging to prevent twist

INTERNAL WALLS The ends of the joists may be rested on a wall plate on top of an internal partition although in practice the wall plate is often omitted This provides a sound, uniform bearing with maximum distribution of the loads. Where joists from either side meet on a load bearing wall, they are usually placed side by side and nailed to each other with laps of at least 150 mm

BRIDGING / STRUTTING As the span of the joists increases ( above 3 m ) there is a tendency for the joists to twist which could cause damage to the ceiling below. To prevent this twisting, strutting is usually included if the span of the floor exceeds 2.5 m. There are two forms of strutting, HERRINGBONE STRUTTING SOLID STRUTTING

SOILD BRIDGING / STRUTTING Used to to tie joists together so that: The load is distributed over a number joists To prevent joists from twisting Lines of bridging should be positioned no greater than 1350mm apart Bridging should be in a straight line

BRIDGING

HERRINGBONE BRIDGING / STRUTTING Herringbone strutting is made up of approx 35 x 35 mm timbers with their ends cut at an angle and nailed together where they intersect and to the top of one joist and the bottom of the next. The space between the first and last joist and the adjoining wall is wedged with folding wedges to take the thrust of the strutting.

OPENINGS IN UPPER FLOORS stairwell ope Doubled or thicker joists joist hanger internal load bearing wall

STAIR OPENING IN UPPER FLOOR

OPENINGS IN UPPER FLOORS The trimming joist and the trimmer joist are increased in thickness by 25 mm from 225 x 50 mm to 225x 75 mm because of the extra weight they have to carry. The trimmed joist has no extra weight to bear so its dimensions are unaltered at 225 x 50 mm.

OPENINGS IN UPPER FLOORS Floor joists around openings such as stair wells and fire hearths must be self supporting. In order to achieve this the sections of timber around the opening must be bigger to cope with the extra stresses. In having to maintain a level floor and ceiling the increases must be in the width of the joists and is usually 25 mm. There are a number of jointing methods that can be used between the TRIMMING, the TRIMMER and the TRIMMED joists. Strong and soundly constructed joints are required between the trimming members, and the tusk tennon joint is often advocated for its strength.

TUSK TENON JOINT Used to join a trimmer joist to a trimming joist

COMMON JOINTS USED IN FLOOR JOISTS Joints used between trimmed joists and trimmer joist Housed joint and dovetailed notch while very good would be very labour intensive thus costly

COMMON JOINTS USED IN FLOOR JOISTS Two most commonly used methods of forming the joint between the trimmed joists and the trimmer Note the larger section of timber used for the trimming joist and the trimmer joist

TYING FLOORS TO EXTERNAL WALLS It necessary to strap floor joist to external walls for stability L Straps to be 30X5mm galvanised steel Straps to be located at 2m c/c max Straps to tie in at least 3 joists with bridging between joists under strap Straps are placed as work is in progress

JOISTS RUNNING PERPENDICULAR TO PARTY WALL Where possible joists should always run parallel to party wall Joists should never be set into party wall

JOIST RUNNING PERPENDICULAR TO PARTY WALL Joist hangers may be used as an alternative to setting the ends of joists into a party wall

SERVICES IN JOISTS

SERVICES IN JOISTS

SOUNDPROOFING UPPER FLOORS Sound travels in two ways AIR BORNE SOUND IMPACT SOUND In order to reduce the transmission of sound between upper and ground floors a FLOATING FLOOR must be provided.

SOUNDPROOFING UPPER FLOORS To reduce the transmission of Air-borne sound the density of the floor will need to be increased. This can be achieved by including 50-75 mm of sand pugging between the joists. The weight of the sand should be carried on the joists ( and not on the ceiling slab ) by fixing a 44 x 20 mm batten to the bottom of the joist. A strip of 12 mm ply can be fitted between the joists on top of which the sand is placed. The floating floor gets its name from the actual construction of the floor. A 50 mm resilient quilt is laid over the top of the joists. 50 x 50 mm battens are laid on top of the quilt directly over the joists and the floor boards are nailed to the battens. The battens are not nailed to the joists. This in effect isolates the floor surface from the ceiling below - thus reducing the transmission of Impact sound.

SOUNDPROOFING UPPER FLOORS

CONCRETE UPPER FLOORS Two methods; BOTH METHODS WILL REQUIRE A FINISH SCREED BOTH METHODS REQUIRE EXTRA SUPPORT I.E. BLOCK ON FLAT AT GROUND FLOOR LEVEL Pre-cast / hollow core concrete slabs Easy to use Relatively lightweight ( compared to solid) Very fast to install May require drilling to accommodate services Solid poured floor Slow to install A lot of support required Easier to accommodate services Better thermal and sound insulation

PRE-CAST SLABS

PRE-CAST SLABS

PRE-CAST SLABS

PRE-CAST SLABS Concrete screed to be poured over slabs incorporating all services

POURED FLOOR

POURED FLOOR

POURED FLOOR

POURED FLOOR

FLOOR FINISHES Functions: Appearance / colour / texture Durability / resistance Hygiene / ease of cleaning Vinyls Carpets Tiles Timber