FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress http://cern.ch/fcc Frank Zimmermann BE/ABP 22 May 2014 thanks.

Slides:



Advertisements
Similar presentations
1 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 FCC Kick-Off “Wrap Up” Michael Benedikt, Frank Zimmermann.
Advertisements

Future Circular Collider (FCC) Study
1 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 Future Circular Collider (FCC) Study - Status Michael Benedikt.
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 XBEAM Steering Meeting.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Future Circular Collider
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
General news LCD monthly meeting Oct 28 th 2013 L. Linssen, CLICdp/LCD monthly meeting, 28 Oct
Patrick Janot Physics Studies: Status on 31/08/15  Outline u The international context u The FCC-ee at Summer Conferences u The second year of the design.
Future Accelerators at the High Energy Frontier
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
Alain Blondel TLEP VC TLEP Design Study News.
SPPC General Status 唐靖宇 第二次 CEPC-SPPC 合作研究全体会议 2015 年 09 月 日, 高能所.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
FCC kick-off meeting a summary for magnets L. Bottura
Status of QUACO project
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
1 H2020 FCC DS proposal Michael Benedikt ESGARD Meeting 24 March 2014 Future Circular Collider (FCC) study H2020 DS proposal PRELIMINARY Michael Benedikt.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
CERN openlab Overview CERN openlab Introduction Alberto Di Meglio.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
EuCARD-2 WP5 XBEAM & WP1 EuCAN Frank Zimmermann EuCARD-2 Steering Committee Meeting 19 March 2014 with kind input from Kurt Aulenbacher, Marica Biagini,
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
Alain Blondel TLEP VC TLEP study news.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
CERN Report R-D Heuer ECFA, November Scientific Strategy Implementation of all four European Strategy high priority items Implementation of a diverse.
Future Circular Colliders (FCC) (and other relevant one) FCC study page :
From Local to Global Weiren Chou For the CEPC-SPPC Study Group Beijing-Chicago Workshop Sept 14–15, 2015, Beijing, China 1 W. ChouBeijing-Chicago Workshop,
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
FCC-ee Interaction Region design
LHeC Coordination Meeting, 9 June 2017
CLIC work program and milestones
1st FCC Infrastructure & Operation meeting
Oct 22 Group Leaders Planning meeting
FCC summary report March 2015 Washington.
Future Circular Collider
UK Feedback Feedback from Prof John Womersley, Chief Executive of Science and Technology Facilities Council (STFC), UK at the Cockcroft Institute Board.
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Future Collider Projects at CERN
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
HEHIHB - WP1 Accelerator Magnet Technology
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
SPPC General Progress Tang Jingyu 4th CEPC-SPPC Collaboration Meeting
AMICI WP1 – Management, coordination and dissemination
EuCARD-2 WP5 XBEAM & WP1 EuCAN
A High Intensity Neutrino Oscillation Facility in Europe
Summary of Washington DOE Review
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress http://cern.ch/fcc Frank Zimmermann BE/ABP 22 May 2014 thanks to Michael Benedikt & Frédérick Bordry

Future Circular Collider Study - SCOPE CDR and cost review for the next ESU (2018) International collaboration to study: pp-collider (FCC-hh)  defining infrastructure requirements e+e- collider (FCC-ee) as potential intermediate step p-e (FCC-he) option 100 km infrastructure in Geneva area ~16 T  100 TeV pp in 100 km ~20 T  100 TeV pp in 80 km

FCC Kick-off Meeting University of Geneva 12-15 February http://indico.cern.ch/e/fcc-kickoff

FCC Kick-Off & Study Preparation Team Future Circular Colliders - Conceptual Design Study Study coordination, M. Benedikt, F. Zimmermann Hadron collider D. Schulte Hadron injectors B. Goddard e+ e- collider and injectors J. Wenninger Infrastructure, cost estimates P. Lebrun Technology High Field Magnets L. Bottura Supercon-ducting RF E. Jensen Cryogenics L. Tavian Specific Technologies J.M. Jimenez Physics and experiments Hadrons A. Ball, F. Gianotti, M. Mangano e+ e- A. Blondel J. Ellis, P. Janot e- p M. Klein e- p option Integration aspects O. Brüning Operation aspects, energy efficiency, safety, environment P. Collier Planning (Implementation roadmap, financial planning, reporting) F. Sonnemann, J. Gutleber

Kick-Off meeting for Future Circular Collider study (FCC) U Kick-Off meeting for Future Circular Collider study (FCC) U. Geneva, 12-15 February 2014 341 registered participants (Americas: 37, Asia: 19, Africa: 1. CERN: 140, Europe: 144) all FCC aspects refined study scope schedule, WBS, milestones path towards international collaboration

“Bière de l'amitié"

"Vin de l'amitié"

FCC Kick-Off Parallel Sessions (Friday afternoon) # Participants Technical infrastructure and civil engineering 47 Hadron collider design (+ SC magnets + injectors) 75 Lepton collider design (+ SC RF + injectors) 62 Hadron Physics, Experiments, Detectors 93 Lepton Physics, Experiments, Detectors 54 e-p Option 18 Overall physics and phenomenology 63

FCC Study Time Line 2014 2015 2016 2017 2018 Q1 Q2 Q3 Q4 Prepare Kick-off, collaboration forming, study plan and organisation Ph 1: Explore options “weak interaction” Workshop & Review identification of baseline Ph 2: Conceptual study of baseline “strong interact.” Workshop & Review, cost model, LHC results  study re-scoping? Ph 3: Study consolidation Workshop & Review  contents of CDR 4 large FCC Workshops distributed over participating regions Report Release CDR & Workshop on next steps

establishing international collaboration M. Benedikt following very positive reactions : invitations to institutes to join collaboration expressions of interest by end May ’14 enlargement of study preparation team first international collaboration board meeting 9-10 September at CERN March April May June July August September 2014 kick-off event expressions of interest (EOI) proposed 1st ICB meeting discussions iterations

FCC EU DS Status – DRAFT WP1: Luminosity optimisation FCC-hh (JAI, CEA, Cockcroft, DESY, INFN, EPFL, KEK, CERN) IR and final focus design MDI Shielding and FF quad protection Beam parameters Collimation requirements Beam-beam WP2: Cost optimisation FCC-hh (CEA, Cockcroft, TU Darmstadt, KEK, CERN) Arc lattice design Dynamic aperture evaluation Impedance calculations and instabilities SR: photo-electrons and e-cloud effect Aperture and field quality specifications WP4: Magnet field quality evaluation FCC-hh (CERN, CEA, CIEMAT, KIT, INFN) Magnet design Field quality evaluation and comparison Field optimisation for DA maximum WP3: Beam-magnet interface FCC-hh (INFN, CIEMAT, Cockcr./ASTEC, ALBA, CERN) Vacuum design Beam screen optimisation Beam screen coating Cryogenics integration Prototype production Performance measurements WP5: IR&beam-beam FCC-ee (BINP,KEK)  WP6: Management (CERN) Coordination & Outreach Realization aspects italics: optional inclusion in H2020 WP 4 - ESGARD review of FCC EU DS proposal on 22nd May (today)   Horizon2020 call – design study, deadline 02.09.2014

FCC Collaboration Status (i) FCC SNSF proposal - funding request submitted Beam-beam effects for FCC-hh - EPFL Polarization & energy calibration for FCC-ee - U. Geneva FCC-hh & HL-LHC German “Verbundforschung” - call in preparation Impedance, instabilities, transverse feedback TU Darmstadt, U. Rostock, U. Dortmund Novel cryogenics schemes TU Dresden, TU Darmstadt? KIT? Novel SRF coating techniques TU Berlin? U. Bochum?, U. Wuppertal?, U. Frankfurt?, KIT? Magnet quenches TU Darmstadt

FCC Collaboration Status (ii) BINP FCC proposal for FCC-ee - collaboration agreement in preparation Final focus & IR design Beam-beam effects Polarization BINP, CERN, U. Geneva ILC-CLIC-FCC ANR proposal (FCC-ee) - funding request prepared Final focus & IR design Beam-beam effects Stabilization Beam loss diagnostics LAPP Annecy, LAL Orsay, IFIC Valencia, IHEP, KEK, KNU, Oxford, CERN

FCC - US Status DOE had limited FCC kick-off participation to 1 representative/laboratory Still 33 US participants (many institutes!) attended DOE request not to interfere with US “P5 process” has been fully respected by FCC study coordination; next HEPAP sub-panel till 2015! Designated US-DOE contact for FCC: William Barletta, MIT US has relevant expertise: SSC, VLHC, HL-LHC, RHIC, Tevatron, CEBAF, SNS, ... US could make significant contributions to high-field magnets and SRF, e.g. through structure like LARP US holding FCC physics workshops at SLAC, FNAL, Aspen, …. FCC study proposal to include two US representatives in global study steering group (which could play a role in this critical formation phase)

FCC - China Status IHEP/CAS project of CepC/SppC similar to FCC-ee/FCC-hh Numerous CepC workshops and events in China; Invited visits by many international accelerator experts (SLAC, KEK, Cornell, FNAL, BINP, ANL, Korea, …) More aggressive time schedule: CepC CDR end of 2014; first e+e- collisions in 2028; first pp collisions in 2042 Attractive location (1 h from Beijing by TGV, “Chinese Toscana”, “best beach of China”) Present project proposal based on 54 km circumference (2x LHC) Optimized for Higgs factory mode (240 GeV c.m.) Fruitful collaboration & competition with FCC (joint meetings)

CepC/SppC design study by CAS/IHEP ex. China Qinhuangdao (秦皇岛) CepC, SppC 50 km easy access 300 km from Beijing 3 h by car 1 h by train 70 km Yifang Wang

Summary FCC kick-off meeting well attended, with balanced international participation constructive and encouraging atmosphere timeline and collaboration process defined good progress since kick-off in preparation of international collaboration and H2020 DS proposal great worldwide echo

great interest & fascination around the world!

BE-ABP expertise & contributions essential! design for success! J. Womersley BE-ABP expertise & contributions essential!

back-up slides

FCC Kick-off participants 341 registered participants - geographical distribution Americas (37) Canada: 1 Mexico: 2 US: 34 Asia (19) China: 9 Japan: 9 Republic of Korea: 1 Africa (1) South Africa: 1 Europe (284) Austria: 1 CERN: 140 Czech Republic: 2 Denmark: 1 France: 30 Germany: 14 Greece: 1 Hungary: 2 Italy: 20 Poland: 6 Portugal: 2 Russia: 8 Serbia: 1 Spain: 11 Sweden: 1 Switzerland: 19 (w/o CERN) UK: 25 Well-balanced world-wide attendance

International Organization Structure Rolf Heuer Opening talk CERN DG Collaboration Board 1 person/inst. Steering Committee 2-3 persons/region Advisory Committee 1-2 experts/field FCC Study Coordination Hadron Collider Physics Experiments Lepton Collider Physics Experiments e-p Physics Experiments Accelerators Hadron Injectors Hadron Collider Lepton Injectors Lepton Collider Accelerator R&D Technologies Infra-structures Operation Costing Planning

>1 big event per month last month alone: contributions and/or few-week visits by A. Apyan (NWU), Y. Cai (SLAC), W. Chou (FNAL), Y. Funakoshi (KEK), E. Keil (CERN ret.), K. Ohmi (KEK), D. Shatilov (BINP), R. Talman (Cornell), Y. Zhang (JLAB), ….

FCC EU Design Study (DS) Proposal Horizon2020 call – design study, deadline 02.09.2014 Prepare proposal parallel to FCC collaboration setup Goals fo EU DS: conceptual design, prototypes, cost estimates, … From FP7 HiLumi LHC DS  positive experience: 5-6 work packages as sub-set of FCC study ~10-15 beneficiaries (signatories of the contract with EC) kick-off event input from interested partners, end of May submission of EU FCC DS proposal, 2 Sept. discussions iteration, agreements, signatures March April May June July August September 2014 complete draft proposal, end of June Time line Non-EU partners can join as beneficiary – signatory with or w/o EC contribution (contractual commitment) or as associated partner – non-signatory (in-kind contribution with own funding, no contractual commitment)