Use of a Diamond BLM System in the LHC Ring

Slides:



Advertisements
Similar presentations
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
Advertisements

LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
DANIELE MIRARCHI CERN FOR UA9 COLLABORATION Data reduction and analysis of SPS data.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
LHC Collimation Working Group – 20 February 2012 Collimator Setup Software in 2012 G. Valentino R. W. Assmann, S. Redaelli and N. Sammut.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
LHC Collimation Working Group – 02 April 2012 Results from Beam-Based Collimator Alignment G. Valentino, R. W. Assmann, R. Bruce, F. Burkart, M. Cauchi,
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
Summary of MKI UFO MD 7/17/20121MKI UFO MD LSWG Meeting Maria Hempel T. Baer, M. Barnes, S. Bart Pedersen, S. Cettour Cave, B. Dehning, E. Effinger,
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Overview of LHC Beam Loss Measurements
Results of the 2007 BLM hardware tests in LSS5
Use of a Diamond BLM System in the LHC Ring
RF acceleration and transverse damper systems
Data providers Volume & Type of Analysis Kickers
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Introduction: FCC beam dumping system
Ewald Effinger, Bernd Dehning
MD #453 Effect of low frequency noise
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
dBLM Hardware and Signal
MD2036: UFO dynamics studies and UFO fast detection
Fast BLM acquisition system
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Fast losses at collimators during 16L2 dumps
Halo scraping and loss rates at collimators
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
BEAM LOSS MONITORING SYSTEM
Thursday morning – optics correction
Remote setting of LHC BLM thresholds?
Beam loss monitoring requirements and system description
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Yesterday morning Held 1647 for a while – SPS kicker problem
Chamonix Workshop XIV CERN - 17th-21st January 2005
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
Machine protection and closed orbit
Operational Results of LHC Collimator Alignment using Machine Learning
Powering scheme for Hollow Electron Lens
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

Use of a Diamond BLM System in the LHC Ring Chen Xu CERN BI-BL Thanks to: E. Griesmayer (CIVIDEC), B. Dehning, C. Zamantzas, E. Effinger F.S. Domingues Sousa (CERN) F. Burkart, M. Valette, O. Stein, G. Valentino (CERN) 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona Outline dBLM@LHC LHC beam operation experience (2016) Beam injection Multi-purpose measurements at the LHC primary collimator (TCP) Beam dump Summary and outlook 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona Acknowledgement The diamond BLM (dBLM), amplifiers and ROSY® System are provided by CIVIDEC Instrumentation GmbH, Vienna, Austria. Some of the results and plots presented are kindly provided by F. Burkart, M. Valette, O. Stein, G. Valentino 9/16/2016 oPAC Topical Workshop - Barcelona

The BLM System in the LHC Machine protection system component (3520 IC blms connected to beam interlock system) Integrated current signal (minimum integration window 40 us) Free running with 1 Hz data logging (maximum values) Higher data rate (continues data buffer) are provided for dedicated purpose (injection, collimation alignment, UFO, PM) Diamond BLMs are currently complementary devices to provide ns range time resolution data. 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona Diamond BLM @ LHC Point 6 Beam extraction Point 7 Primary collimators Point 2 Beam1 injection Point 8 Beam2 injection 9/16/2016 oPAC Topical Workshop - Barcelona

dBLM with ROSY® Readout Time-Loss-Histogram: precise beam loss timing counts Time +1 1.6ns 9/16/2016 oPAC Topical Workshop - Barcelona

Time-loss-histogram with ROSY® B1 TCP LHC full machine with 2076 bunches 12b injection gap 48b 96b abort gap b2 crosstalk 88.9 us 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona dBLM waveform Configurations: Edge triggered with ROSY ® High sampling rate with large data buffer (4 channels shared 5Gs/s & 1e9 samples) Edge trigger or smart triggered with Lecroy scope DAQ Using LHC event triggers Qualitative analysis at the moment Calibration with IC BLM or beam on going 9/16/2016 oPAC Topical Workshop - Barcelona

dBLM data from 2016 LHC beams LHC injection loss Unidentified falling object (UFO) event TCP beam scraping (beam halo population study) LHC beam extraction 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona LHC injection loss SPS LHC Extraction Kicker Injection Kicker Transfer line Collimator 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona LHC injection loss SPS LHC Extraction Kicker Injection Kicker Transfer line Collimator 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona LHC injection loss Unbunched beam 96b Courtesy of F. Burkart 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona LHC injection loss 12b Injection Histogram after injection finished (Accumulated losses) 96b Injection 9/16/2016 oPAC Topical Workshop - Barcelona

dBLM data from 2016 LHC beams LHC injection loss Unidentified falling object (UFO) event TCP beam scraping (beam halo population study) LHC beam extraction 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona Beam UFO event study Dust particles falling on to the beam creating fast beam loss (~ms) A few events with beam loss large enough to induce magnet quench Sometimes too fast to be dumped UFO buster app An UFO event seen by local IC BLM shown in the post mortem BLM data Waveform data of dBLM @B2 TCP during an UFO event Data courtesy of O. Stein 9/16/2016 oPAC Topical Workshop - Barcelona

dBLM data from 2016 LHC beams LHC injection loss Unidentified falling object (UFO) event TCP beam scraping (beam halo population study) LHC beam extraction 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona TCP scraping The time evolution of losses during a collimator scan gives information on halo diffusion and population. Courtesy of G. Valentino IC BLM 100 Hz data Collimator jaw position 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona TCP scraping 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona TCP scraping 1second/88.9us ~ 1.1e4 counts/seconds Analysis of the waveform data is on going Courtesy of G. Valentino 9/16/2016 oPAC Topical Workshop - Barcelona

dBLM data from 2016 LHC beams LHC injection loss Unidentified falling object (UFO) event TCP beam scraping (beam halo population study) LHC beam extraction 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona LHC Beam Extraction TCDQ TCDQ LHC Beam dump Beam dump kicker Estimate number of nominal bunches hitting the dump collimator in case of asynchronous beam dump Preliminary results from a MD experiment (courtesy of M. Valette): Pilot (7e9) Nominal (~3e10) 9/16/2016 oPAC Topical Workshop - Barcelona

oPAC Topical Workshop - Barcelona Summary and Outlook dBLM can help resolving single bunch level beam loss signal Good complementary to the LHC BLM system for beam loss diagnose Work in progress for quantitative analysis (signal calibration & data processing tools) Application-specific data acquisition and data logging Thank you for your attentions ! 9/16/2016 oPAC Topical Workshop - Barcelona