RAPID INFILTRATION BASIN Design and Permitting Services

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

Orange County Board of County Commissioners Water Conserv II Operations Contract Renewal Utilities Department August 23, 2011 Utilities Department August.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts.
Prepared by: Earth Data N.E., Inc. August 19, 2008.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
The Rationale In the past two decades, we have seen a shift in the employment opportunities for recent geoscience graduates, especially at the Bachelors’
General Services. About Chastain-Skillman, Inc. Founded in 1950 Headquarters in Lakeland, FL with offices in: Tampa Tallahassee Sebring Winter Haven Majority.
Golf Course Water Resources Best Management Practices TOOLBOX  Project Overview  Your Role in the Project April 2009.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Community Development Department Old Brick Township Development of Regional Impact – Development Order (DRI-DO)
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
Environmental Toolbox. Technical Module Introduction.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
STORM WATER STORAGE AND TREATMENT
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
SB 536 Study and Report WateReuse Florida November 9, 2015 Janet G. Llewellyn Office of Water Policy Florida Department of Environmental Protection.
Project Update MARC Maintenance & Layover Facility September 18, 2012.
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
NHDOT/ACEC-NH 2016 Technical Transfer Conference April 7, 2016 Management of Mildly Contaminated Soil.
Leap-frogging towards water resilience in Dar es Salaam and Addis Ababa Lise Herslund and Antje Backhaus Institute for Geosciences and Natural Resource.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
NESKOWIN SECOND ACCESS August 6, 2016 CAC Meeting 1 Liane Welch, P.E. Director
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Duval County LID Design Manual
Sources, Transport, Fate Treatment Methodologies BMP Case Studies
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
USDA -Natural Resources Conservation Service
Upland Landfill Waste Discharge Application 7295 Gold River Highway
CITY OF HALLANDALE BEACH
Treasure Coast Regional Planning Council
Delivering Water Reuse Solutions
Biosolids Public Workshop March 22, 2016
Cudworth Professor of Urban Water Systems
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Design and Permitting Services RFQ No August 1, 2016
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Water Reclamation Plant Feasibility Study Update May 28, 2014
Rapid Infiltration Basin
Davie Green Water Project
Local, Regional, State, and Multistate Water Management Agencies
Storm Water Storage and Treatment
Mountain Avenue West Recharge Basin Project
Florida and Reclaimed Water
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
How to Build a Great Team
Water Cycle and Watersheds
Reclaimed Water Funding
Reuse and Wastewater Disposal
Citizens’ Academy Overview
Navigating MyFloridaMarketPlace (MFMP)
Controlling Project Cost and Schedule
The Islamic University of Gaza- Civil Engineering Department
Big Sky Wastewater Facility Plan Update
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Water Supply Planning for the Twin Cities Metropolitan Area
the path less traveled Termination of Post Closure Care
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

RAPID INFILTRATION BASIN Design and Permitting Services Haines City, Florida RAPID INFILTRATION BASIN Design and Permitting Services RFQ #160504 August 1, 2016

TEAM PENNONI Winter Haven Office (formerly Envisors) Overview 40 Years Local Service Pennoni merger November 2014 Overview Multi-disciplined services Founded 1966 1000+ employees, 28 offices, 10 States 100’s municipalities & wastewater departments Project Team Winter Haven Office (26 staff) Pennoni (1000+ staff) Geotechnical (Universal and SMW Geosciences)

Local Presence We are 20 minutes away Local Office Haines City We are 20 minutes away and have been part of community for 40 years

Pennoni Experience Project Type Local Office Pennoni Team Total Env. Resource permitting/wetland Mitigation (sites) 200+ 400+ Stormwater Design/Permitting (sites) 1,000+ 1,400+ Surveys (Topo, Boundary, Wetland, etc.) 5,000+ 15,000+ 20,000+ Roads Designed 300+ 8,150+ 8,450+ Pumping Systems   1,100+ 1,300+ Wastewater Treatment 30+ 3,600+ 3,630+ Master Plans 40+ 500+ 540+ Geotechnical Investigations/Designs 2,200+ 2,600+ Hydrogeological Investigation/Designs 80+ 280+ Contamination Evaluation/Remediation  70+ 20,070+

Environmental Experience 40 years of local knowledge and expertise Project area is within environmental habitat for protected species (Gopher Tortoise and Skinks) Fish & Wildlife (FWS) and the Department of Environmental Protection (DEP) coordination.

City Project Design and permitting of new rapid infiltration basin (RIB) in the vicinity of the Southern Dunes golf course to: Provide additional effluent disposal capacity Supplement existing reclaimed water system Provide expanded wet weather disposal options

Site Considerations Geotechnical Setbacks Site Size Field and Lab Soil Testing Percolation Rate (typically 3”-9” per day) Mounding Analysis Environmental Benefit (Aquifer Recharge) Setbacks Property Lines, Wells, Rights-of-Way Reduce due to Public Access Reuse Quality Effluent Site Size Berm Slope (4:1), Freeboard (3’), Depth to Water Table Basin Configuration, Site Slope, Bottom Area ±17 acres per MGD of Capacity at 3” per day ±7 acres per MGD of Capacity at 9” per day

Project Approach - Management Key Personnel Steven Elias, P.E., Project Manager Roger Homann, Project Engineer Communications Single point of contact Schedule control Budget Control Not to exceed (NTE) contract Document Control City Standards QA/QC

Organization Chart & Management Plan Randy Austin Nathan Chambers  Haines City, FL Design & Permitting Project Manager Steven Elias, PE Principal-in-Charge/ QA/QC Manager Nelson Shaffer Steven Shealey, PE Roger Homann Jeffrey McKinney Robert DuBois, PSM Sarah Whitaker , PG*   R. Kenneth Derick, MS, PE Aravind Rangaswany, MS, PE Geotechnical Universal Engineering Sciences, Inc. Environmental Austin Environmental Consultants, Inc. *SMW Geosciences Resource Capacity Local Office 26 staff Pennoni 1000+ staff Universal Engineering 500+ Staff

Project Approach - Technical Preliminary Engineering Study Environmental Study (i.e. Skinks, Gopher Tortoise) Geotechnical Study (Screening, Full Evaluation) Topographic, Boundary, and Wetland Survey Preliminary RIB Capacity Analysis Preliminary Engineering Report SWFWMD Grant Application Environmental Benefit Final Design and Permitting Agency Coordination RIB Capacity Analysis – Groundwater Modeling 60% / 90% / 100% Design Plans Permitting Construction Services

Community Involvement Haines City EDC Haines City Chamber Various Sponsorships (Fireworks, Ribs on the Ridge)

Why Pennoni? Strong Pennoni Team Geotechnical - Universal Engineering Sciences Environmental – Austin Environmental Consultants Hydrogeological – SMW Geosciences Local & National Resources & Expertise Dozens of local wastewater / reuse / RIB projects Local Office – 40 Years in Polk County Innovative and Specialty Expertise Commitment to Quality & Resources We want to continue to work with the City!

Questions?