ELECTRIC POWER GRID INTERDICITION

Slides:



Advertisements
Similar presentations
METHODOLOGY FOR IDENTIFYING NEAR-OPTIMAL INTERDICTION STRATEGIES FOR A POWER TRANSMISSION SYSTEM Vicki M. Bier, Eli Robert Gratz, Naraphorn J. Haphuriwat,
Advertisements

1 ELECTRIC POWER GRID INTERDICITION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored by.
1 ELECTRIC POWER GRID INTERDICTION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored in part.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Javad Lavaei Department of Electrical Engineering Columbia University Joint work with Somayeh Sojoudi Convexification of Optimal Power Flow Problem by.
ELECTRICAL CRITICAL INFRASTRUCTURE SECURITY Charles Hookham, P.E., M.ASCE, VP, Utility Projects HDR Engineering 1.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
KEEPING THE LIGHTS ON: STRATEGIES FOR COMPATIBILITY AND INTEROPERABILITY IN ELECTRIC POWER NETWORKS SURVIVABILITY OF COMPLEX NETWORKS October 27, 2011.
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.
Phoenix Convention Center Phoenix, Arizona When Prevention and Preparation May Not be Enough: Resilience and Recovery for the Electricity Sub-Sector Operational.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
North American Energy Infrastructure Policy Philip Gonda Steven Mays Robert Floyd Josh Kapp.
Grid Defense Against Malicious Cascading Failure Paulo Shakarian, Hansheng Lei Dept. Electrical Engineering and Computer Science, Network Science Center,
Fiscal Year 2007 Urban Area Security Initiative Nonprofit Security Grant Program Investment Justification Questions, Criteria, and Prioritization Methodology.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Security and Resilience Pat Looney Brookhaven National Laboratory April 2016.
Sensing and Measurements Tom King Oak Ridge National Laboratory April 2016.
Resiliency and Reliability
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
SCE Energy Storage Perspective
Sub Station.
Black Start Study Report
RENEWABLES AND RELIABILITY
ELECTRIC POWER GRID INTERDICTION
SUB-STATIONS.
Electricity is produced at the power station.
STANDARDS AND THE FUTURE OF DISTRIBUTED ELECTRICITY
Cyber Physical Attack Detection
Risk Assessment and Probabilistic Transmission Planning Methods
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Demand Control Field Trials
ECEN 460 Power System Operation and Control
ISO New England System R&D Needs
ECEN 460 Power System Operation and Control
Project WECC-0100 Update Load Modeling Task Force
Electricity Distribution Network Design Training & Courses
Applications of Optimization
Developing Resilient Freight Systems
Characteristics of Regional Power Markets
Secure Control Systems - A Quantitative Risk Management Approach
Pacific Power Seismic Preparedness Update
Role for Electric Sector in Critical Infrastructure Protection R&D
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Factors to Consider when Designing a Reliable Power Grid
ECEN 460 Power System Operation and Control
Vicki M. Bier, Eli Robert Gratz, Naraphorn J
A Model of Power Transmission Disturbances in Simple Systems
ECEN 460 Power System Operation and Control
Alison Silverstein Contributor to DOE 2017.
Factors to Consider when Designing a Reliable Power Grid
Security assessment: decision support tools for power system operators
SURVIVABILITY OF COMPLEX NETWORKS Kohlberg Associates, Inc.
Special MRC – Fuel Security
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Project WECC-0100 Update Load Modeling Task Force
Keeping the Lights on in a Dangerous World
Long-Term Power Outage
Supplemental Project Planning Process Under Order 890 Within PJM
Deborah Housen-Couriel, ADV.
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

ELECTRIC POWER GRID INTERDICITION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored by DoJ, Office of Domestic Preparedness

Purpose In this presentation we will... Show the importance of analyzing vulnerabilities of electric power systems to terrorist attacks Present our models, and exact and heuristic algorithms to carry out this analysis Present results on standard IEEE Reliability Test Networks

A Long-Recognized Issue (I) “One can hardly imagine a target more ideal than the U.S. domestic energy” (A.B. and L.H. Lovins, 1983) “Any U.S. region could suffer lasting and widespread blackouts if three or more substations were targeted.” (OTA, 1990) “The U.S. is at, or is fast approaching, a crisis stage with respect to reliability of transmission grids.” (NERC, 2001) “The U.S. electric power systems must clearly be made more resilient to terrorist attack.” (Committee on Science and Technology for Countering Terrorism, NRC, 2002)

A Long-Recognized Issue (II) (On Ahmed Ressam) “They were specifically trained to attack critical infrastructure, including electric power plants.” (CNN, 2002) “And the threat isn't simply academic. U.S. occupation forces in Afghanistan discovered Al Qaeda documentation about the facility that controls power distribution for the eastern U.S., fueling fears that an attack on the power grid may one day become a reality.” (Energy Pulse, 2003) “Blue Cascades” project (simulated terrorist attack on the Pacific Northwest's power grid). The study showed that such an attack, if successful, could wreak havoc on the nation's economy, shutting down power and productivity in a domino effect that would last weeks. (Energy Pulse, 2003)

Terrorist Threat Potential targets: Generating plants Transmission and distribution lines Substations Easy disruption + Widespread damage + Difficult recovery

Our Approach Assumes Information Transparency: Same information is available to both sides Uses optimization to assess worst-case disruptions Goal: To provide insight on physical vulnerabilities and protective plans that proactively hedge against disruption caused by terrorist attacks

Mathematical Analysis of the Problem In order to better defend the electric grid it is valuable to understand how to attack it! Optimal power flow model (minimizing load shedding) Interdiction model (maximize disruption) Additional features of the problem are: Time scale: Very short-, short-, medium- and long-term Customer types; ability to “share the pain” Uncertainty about terrorist resources Assumptions on protection resources

Power Flow Model (DC Approx.) DC-OPF: s.t. i: bus, l: line, g: generator, c: customer sector PLine, PGen: power (MW) S: power shed  : bus phase

Interdiction Model I-DC-OPF: Where: Etc... DC-OPF after interdiction s.t. Etc...

Heuristic Solve the DC-OPF Power Flow Model given the current grid configuration Based on the current and previous flow patterns, assign a “Value” (V) to each interdictable asset Interdict the assets that maximize “Total Value”

Exact Linearization of the Model

IEEE Reliability Test System 96-99 Total load: 2,850 MW Load shedding: 1,258 MW Load shedding: 1,373 MW Interdiction resource: 6 terrorists Line x1 Single transformer x2 Bus or substation x3 Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems

IEEE Reliability Test System 96-99 Load: 5,700 MW 12 terrorists Shedding: 2,516 MW Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems

Resources M (no. of terrorists) System Restoration Trafos with spares Lines MW shedding One to several days No repair Days to one week Weeks Slow repair >1 months t (Attack) 768 3 YES Substations N/A NO Generators 360 Buses 2 Transformers Lines (underground) 72 1 Lines (overhead) Outage Duration (h) Resources M (no. of terrorists) Interdictable Grid Component E.g.:

IEEE Reliability Test System 96-99 Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems Total Load: 2,850 MW 2 t MW +72h Attack 3 +768h Substation Protected 4 +360h

Directly Interdicted Components Results for the Linearized MIP Case/Algorithm Directly Interdicted Components Time Period Power Shed (MW) Energy Shed (MWh) RTS-Two-Areas (M=12) HEURISTIC Substations: Sub-A1, Sub-A2, Sub-B1, Sub-B2 0-768 1,416 1,087,488 Total: 1,087,488 MIP Lines: A23, B23 Transformers: A7, B7 Substations: Sub-A2, Sub-B2 0-72 h 1,804 129,888 72-768 h 985,536 Total: 1,115,424 Case/Algorithm Directly Interdicted Components Time Period Power Shed (MW) Energy Shed (MWh) RTS-Two-Areas (M=24) HEURISTIC Buses: 116, 118, 215, 218 Substations: Sub-A1, Sub-A2, Sub-B1, Sub-B2 0-360 h 2,693 969,480 360-768 h 1,416 577,728 Total: 1,547,208 MIP Lines: A30, A33-2 Transformers: A7, B7 Buses: 115, 118, 215, 218 Substations: Sub-A2, Sub-B2 0-72 h 3,164 227,808 72-360 h 2,716 782,208 360-720 h Total: 1,587,744