Integrated DECOM A specialist team to deliver Decommissioning Programmes.

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

GRO Project Management Handbook
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Planning for Program Delivery Presented By: Michael A. Haithcock, P.E. Assistant State Program Delivery Engineer October 27, 2009.
ITIL: Service Transition
Formulating requirements for training systems engineers in terms of a competency model STATE ATOMIC ENERGY CORPORATION “ROSATOM” June 28, 2013 St. Petersburg.
Risk Assessment – An Essential Standard
Internal Auditing and Outsourcing
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
WORKING WITH ASIAN DEVLOPMENT BANK  BOARD OF TRADE OF METROPOLITAN MONTREAL September 22 nd 2015.
Service Transition & Planning Service Validation & Testing
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
National Programs. Local Solutions. The Best of Both Worlds.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Independent, integrated thinking.
1 1 Presenter / date if required Independent, integrated thinking.
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
YOUR RELIABLE PARTNER BINTANG SUBSEA.
Practical IT Research that Drives Measurable Results Vendor Landscape Plus: Enterprise Content Management Suite ECM: A vendor marketing concept, not an.
Experience from H2020 Proposals (a personal assessment)
Technical Clarification CORP 3315 Eskom OT-IT integration and convergence strategy.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ITIL: Service Transition
Rapid Launch Workshop ©CC BY-SA.
NSF INTERNATIONAL OUR SERVICES.
Subtitle Statement of Capabilities.
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Maintaining Safety Standards
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
Chapter 10 Software Quality Assurance& Test Plan Software Testing
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
Maintaining Safety Standards
Software Requirements
Decommissioning Scope and Practice Southern North Sea (SNS): Subsea
Program Control Services – Overview
HSE Case: Risk Based Approach.
GDPR - New Data Protection Regulation
Software Quality Engineering
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Communication and Consultation with Interested Parties by the RB
Contracts and Procurement
Infra program Project outline Jouko Kankainen
Michelle Papayannakos
Projects and procurement
Change Assurance Update
Controlling Project Cost and Schedule
Study of Adjustment Orders in Projects K-LEAD LEARNING EXPERIENCE
ESF Evaluation Plan England
MER and Decommissioning
ISO management systems
Projects and procurement
Project delivery RIBA stages Define design deliver Key Objectives 1 2
High Level Operations Transition Timeline
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Data Governance & Management Skills and Experience
Introduction to Project Management
CEng progression through the IOM3
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Frank Power Ergonomist (Inspector) Health and Safety Authority
Delivering cost reduction through multi-client campaigns
Presentation transcript:

Integrated DECOM A specialist team to deliver Decommissioning Programmes

Introduction Integrated DECOM

Objectives ~500 UKCS structures Only ~10% decommissioned Consortium to provide independent UKCS decommissioning support ~500 UKCS structures Only ~10% decommissioned Industry looking for ‘one-stop-shop’ Own entire decommissioning programme (DP) workscope Utilise existing UKCS expertise, relationships and knowledge Capacity to take on large and/or multiple projects Deliver efficient, cost effective and innovative services

Shared History Endeavour ConocoPhillips Renee/Rubie Viking/LOGGS PEMEX QRA ETI CCS Nexen Rig Review Perenco Welland/ Thames Shell Brent Premier Shelley ConocoPhillips Viking/LOGGS Endeavour Renee/Rubie

Consortium Capability

DP Workflow Safety and societal Reuse/Recycle/Dispose Items for decom MER / COP Well abandonment programme Environmental Impact Assessment Pipeline decom Removal and disposal options Schedule Costs Drill cuttings removal Data storage and management (CTE initiative) Safety and societal

Integrated Delivery OGA Consultation and Approval Process Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Preliminary discussions with OGA Detailed discussions and submission of draft plan Consultations with other interested parties and public Formal submission and program approval Commence main works and site surveys Monitoring of site Operator COP and Gate Decom Process Concept Selection Gate CoP & Decom Approval Gate Decommission Contractor Management Risk Management Project Control & Reporting Compliance Management Select Comparative Assessment Verification of Strategy Costs Studies and Planning Strategy Planning Define FEED Scopes of Work & ITTs Decom. Programme Sanction Budget

Consortium Strengths Industry recognised discipline specialists Knowledge Industry recognised discipline specialists Extensive UKCS experience including lessons learned Innovation Consortium companies have proven record of delivering high quality, fit-for-purpose technical and business solutions Integration Shared workflows, project management, communication Common data infrastructure Value Streamlined, efficient, low risk project delivery Cost effective

Total service - single source Individually the Consortium companies have already successfully delivered on the major UKCS decommissioning projects Also extensive experience delivering international decommissioning projects Integrated DECOM builds on proven track record delivering high quality, specialist decom services Capability and capacity to deliver entire Decommissioning Programme workscope Offers an efficient, low risk, decom single point solution BP COP Endeavour ETI CCS Fairfield Hess Maersk Perenco Premier Talisman Shell Axis BMTCordah Costain DNVGL

Case Study - Hess Safety and societal Reuse/Recycle/Dispose Items for decom MER / COP Well abandonment programme Environmental Impact Assessment Pipeline decom Removal and disposal options Schedule Costs Drill cuttings removal Data storage and management (CTE initiative) Safety and societal Well P&A costs COP: 3D modelling, pressure recharge assessment Well integrity review, Well DP prep, Wellsite supervision

Case Study – Premier Safety and societal Reuse/Recycle/Dispose Items for decom MER / COP Well abandonment programme Environmental Impact Assessment Pipeline decom Removal and disposal options Schedule Costs Drill cuttings removal Data storage and management (CTE initiative) Safety and societal ES & EIA Develop budget, AFE control, supplier monitoring Well integrity review, well DP prep, wellsite supervision FPSO, mattress protection, umbilical option studies Cleaning, cutting, protection, survey studies Decom options study DP preparation & delivery, removal mgmt Risk assessment, safety mgmt

Case Study - BG Safety and societal Reuse/Recycle/Dispose Items for decom MER / COP Well abandonment programme Environmental Impact Assessment Pipeline decom Removal and disposal options Schedule Costs Drill cuttings removal Data storage and management (CTE initiative) Safety and societal Well integrity review, Well DP prep Topsides and jacket lift structural assessment

Holistic Approach to Decommissioning Consideration of the whole project scope from planning to execution Highlighting points of interface between disciplines Identifying activities or operations that may be adversely impacted by each other or be affected by compliance issues. At the early stages of project planning, involve both engineering and environmental disciplines to ensure methods considered are environmentally sound and would pose minimal concern to stakeholders and regulator. Minimises risk profile of project Minimises potential schedule delays Minimises scope for unforeseen cost increases either through project delays, additional survey requirements or additional monitoring requirements Reduces risk of project design changes late in the project lifespan What do we mean? Added value

Thank you Contact Details Alastair Dodds: adodds@axis-wt.com Gareth Jones: gareth.jones@bmtcordah.com Eamonn McGennis: eamonn.mcgennis@costain.com Graeme Lamont: graeme.lamont@dnvgl.com Thank you