LHC-RF activities in LHC PT 4 TS2 YETS LS2

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

RF Safety Discussion Derun Li/Bob Rimmer Center for Beam Physics Lawrence Berkeley National Laboratory SRF Institute, JLab.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
CRYOGENICS AND POWERING
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Anders Sunesson RF Group ESS Accelerator Division
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
TE-CRG Activities D. Delikaris, TE-CRG.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
CERN LHC RF Power Systems
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
YETS & LS2 Works EN-EL / Power distribution
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Controls & software Andy Butterworth.
High Energy Proton Synchrotrons
YETS & LS2 Works EN-El on LHC / Power distribution
Injectors BLM system: PS Ring installation at EYETS
RF interlocks for higher intensities (LMC 15 June)
on behalf of the RF group
Preparation of the activities for the LHC Long Shutdown 2
J. Uythoven for the MPE-MI & MS Teams
352MHz Klystron Control for the 3MeV Linac test stand
CV maintenance works during YETS
Linac4 RF System Operation for the Reliability Run in 2017
Test plan of ESS HB elliptical cavity
YETS & LS2 Works EN-EL / Power distribution
RF cables calibration Matteo Volpi Thomas Geoffry Lucas
K. Foraz on behalf of OSS members
ACS news Circulator TCU: control tests in progress All cavity racks
Technical Stop #4 29th August - 2nd September 2011
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
The spoke CM tests at FREIA
RF introduction Anders Sunesson RF group leader
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

LHC-RF activities in LHC PT 4 TS2 YETS 2017-2018 LS2 6/8/2018 LHC-RF activities in LHC PT 4 TS2 YETS 2017-2018 LS2 G. Cipolla and K. Turaj On behalf of the BE-RF group Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF Zones and Constrains 6/8/2018 Sector 11: For work on HV: HV consignation For RF Tests: HV ON (+ Short Waveguide circuits) Sector 8: For work: Module empty, ADT and Cryo consignation For conditioning Zone closed (any access causes INTLK and delays) G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF TS2 6/8/2018 LLRF – firmware upgrade (ALLLoopsDSP, module beam control) If possible – check of new ACS Inspector panel for conditioning Replacement of two ADT spare amplifiers G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF YETS 2017 – 2018 6/8/2018 Shut – Down Warm up of the ACS modules – opportunity to degas the RF surface Cryo-consignation Inspection - securing the instrumentation and equipment Klystrons OFF with access, 18kV EMD801 cell open (EIS chain) G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF YETS 2017 – 2018 6/8/2018 ACS High Power RF System Inspection and maintenance of klystron components Maintenance of Power Supplies, Signal Calibration, settings check etc Inspection and Test of Modulator tanks, Crowbars HV bunker cooling annual maintenance Klystron tests on Short Circuits – 2 weeks G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF YETS 2017 – 2018 6/8/2018 ACS Modules Arc Detector Inspection Temperature Sensor Testing RF antenna investigation Software upgrades Migration of FESA 2.10 to FESA 3.0 including the PLC firmware Debugging - extra time during RF conditioning and LLRF loop setup (1 week) G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF YETS 2017 – 2018 6/8/2018 Start up of ACS RF Modules Prerequisites, done before week 8 READY: HV, Demineralized Water, Vacuum, Cryo, Control CLOSED: RF Zone 8 (patrolled) RF Conditioning – 2.5 weeks Setting up of the LLRF loops – 2.5 weeks Maintenance 3 weeks HV test 2 weeks (access to the klystrons area needed) Conditioning LLRF (debugging) 5 weeks (RF zone 8 closed) G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

G. Cipolla and K. Turaj, BE-RF LS2 6/8/2018 Same as above, plus ACS system Replacement of obsolete components (processors, PS, cards, etc.) Restructure of communication Radiation monitoring system update Klystron area reorganization Tuner system maintenance Klystron replacement ? Maintenance of all FPC systems ADT system Maintenance of all amplifiers and kickers G. Cipolla and K. Turaj, BE-RF Gino Cipolla BE-RF-PM

Thank you for your attention G. Cipolla and K. Turaj, BE-RF