Proposal TDIS-TZM WP14 TDIS jaw validation testing

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
HRM28-TCDI Updates June 24 th, 2015 Fausto Lorenzo Maciariello, F-X Nuiry, R. Ferriere, K. Karagiannis, M. Butcher, G. Vorraro, S. Le Fouest.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
HRMT "RodTarg“ Technical Board – Feb. 2 nd 2015 Claudio Torregrosa Martin, Marco Calviani, Antonio Perillo-Marcone, Mark Butcher (EN/STI), Luca.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Engineering Department ENEN Collimator Robustness Studies with BCMS Beams Collimation Working Group F. Carra, A. Bertarelli, R. Bruce, P. Gradassi,
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
HRMT14 – Post Irradiation F. Carra on behalf of the HRMT14 team 189 th Collimation Working Group – 20 April, 2015.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Energy deposition as function of intensity and emittance  The damage potential of a beam does not only depend on the total intensity Energy deposition.
1 CAN WE KEEP THE CURRENT SYSTEM FOR LIU BEAMS ? Francesco Cerutti, Alessio Mereghetti, Joao Saraiva LIU-SPS Beam Scraping System Review 2013 Jan 22 contributions.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
SPS High Energy LSS5 Thermal contact & cooling aspects
ENERGY DEPOSITION AND TAS DIAMETER
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Registered participants participants from outside Cern.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
on behalf of the Phase II Collimation Design team
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
Motivations and Introduction to MultiMat Experiment in HiRadMat
S. Roesler (on behalf of DGS-RP)
n_TOF Target HiRadMat Experiment Proposal (1704)
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
TDI Coating test at HiRadMat Proposal 1605 HRMT-35 HiRadMat Technical Board Meeting 15th September 2016 EDMS I. Lamas Garcia, M. Butcher,
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
Mechanical Measurement Lab, EDMS no
Thermo-mechanical analysis of the D3 dump in the TT2 line (PS)
FRESCA2 Update on the dipole design and new calculations
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Thermo-mechanical simulations jaws + tank
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
Federico Carra – EN-MME
XFEL Collimation and Beam Switchyard Vacuum Issues
Damage Levels V. Kain AB/Co
Phase II Collimators : design status
HiRadMat Test Facility
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Updates on TDIS design C. Bracco, A. Perillo Marcone, D. Carbajo Perez, L. Gentini, A. Lechner, M.I. Frankl.
n_TOF Target #3 Baseline Design
Presentation transcript:

Proposal 1703 - TDIS-TZM WP14 TDIS jaw validation testing HiRadMat 2018 David Carbajo Perez (STI-TCD), Mark Butcher (STI-ECE), Marco Calviani (STI-TCD), Matthias Immanuel Frankl (STI-FDA), Luca Gentini (MME-EDS), Inigo Lamas (STI-TCD), Anton Lechner (STI-FDA), Antonio Perillo-Marcone (STI-TCD), Regis Seidenbinder (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background - Motivation Object of study Testing aim Experiment details Instrumentation to be installed Post Irradiation Examination Conclusions 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background – Motivation The upgrade of the LHC aiming at a 10 times higher integrated luminosity brings new challenges also for the whole injection system. 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background – Motivation The upgrade of the LHC aiming at a 10 times higher integrated luminosity brings new challenges also for the whole injection system. As part of the injection protection equipment, the current TDI must be upgraded to a higher energy absorption capacity. 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background – Motivation The upgrade of the LHC aiming at a 10 times higher integrated luminosity brings new challenges also for the whole injection system. As part of the injection protection equipment, the current TDI must be upgraded to a higher energy absorption capacity. FEA simulations reveal high thermomechanical loads on certain components of the jaw in case of beam impact  empirical validation of the design needed! 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background – Present TDI Active length 4.2 m (including tapering) Jaw SS support beam Ion pump Injected beam 2.8 m Graphite R7550 (6 blocks) 0.6 m Al. 5083 0.7 m CuCr1Zr Total length 6.5 m (including transitions) TDI longitudinal cross-section view 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Background – TDIS Injected beam Low Z jaws (2 blocks of graphite R7550 per jaw) 0.9 m Ti-6Al-4V 0.7 m CuCr1Zr Active length 4.7 m (3 x 1565 mm) Ion pump 3 modules (3 tanks) Segmented design with 3 modules-chambers New collimator-like jaw concept TDIS longitudinal cross-section view 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Object of study: complete TDIS jaws with special focus on the back-stiffener Table 1 - Main elements of TDIS jaw Component Name Material Spring support plate Stainless steel 304L EN 1.4306 Compression spring Stainless steel EN 1.4310 Cooling pipes support plate Cooling circuit Copper Alloy CW008A Back-stiffener Molybdenum Alloy TZM Clamp Titanium Alloy Ti6Al4V Absorbing block Graphite R7550 TDIS Jaw cross-section view 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Object of study: complete TDIS jaws with special focus on the back-stiffener Component Name Material Back-stiffener Molybdenum Alloy TZM 1565mm Additionally a solution made out of aluminum alloy 2219 T6 will be tested. This option brings some advantages: Less weight (4,3 kg vs 15,3 kg ) Lower cost (around 60% cheaper) 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Object of study Jaws will be installed inside one TDIS module to be mounted onto HRMT interface table. Mechanical table Jaw RF screen Vacuum vessel Support Ion pumps / NEG cartridges Not required for the experiment 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Object of study Mechanical table Jaw RF screen Vacuum vessel Support Ion pumps / NEG cartridges Not required for the experiment 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Object of study Mechanical table Jaw RF screen Vacuum vessel Support Ion pumps / NEG cartridges TZM Aluminum alloy 2219 Not required for the experiment 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Testing aim Ultimate goal: To reproduce a state of temperature/stresses in the back-stiffener comparable to that induced by the worst-case potential impact of the HL-LHC beam: Real failure scenario (worst-case) HL-LHC beam Impact parameter: 38 mm Intensity: 2.3E11 ppb (320 bunches) Impact parameter 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Testing aim Ultimate goal: To reproduce a state of temperature/stresses in the back-stiffener comparable to that induced by the worst-case potential impact of the HL-LHC beam: Real failure scenario (worst-case) HL-LHC beam Impact parameter: 38 mm Intensity: 2.3E11 ppb (320 bunches) Testing scenario HRMT beam Impact parameter: 52 mm Intensity: 1.2E11 ppb (288 bunches) Impact parameter 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Testing scenario Real failure scenario (worst-case) Testing aim Several Fluka simulation loops were conducted to find out the right parameters to achieve in the experiment a comparable energy deposition in the stiffener than in the real case: 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Testing aim According to FEA simulations the defined test settings should lead to reasonably similar peak temperatures/stresses at the back-stiffener than in the real case: Real Case Max. T: 215 °C HRMT settings Max. T: 235 °C Beam Map of thermomechanical loads on this face of the back-stiffener 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Testing aim According to FEA simulations the defined test settings should lead to reasonably similar peak temperatures/stresses at the back-stiffener than in the real case: Real Case Max. stress: 443 MPa ( < Rp0.2 = 515 MPa) HRMT settings Max. stress: 461 MPa (< Rp0.2 = 515 MPa) Beam Map of thermomechanical loads on this face of the back-stiffener 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Experiment details Desired timeslot for the experiment: end of summer 2018 Beam parameters Particle type protons Pulse intensity (range) 3.5x1013 No. bunches 288 Intensity/bunch 1.2x1011 Spot size sigma_x = sigma_y = 1000 um Number of pulses < 10 (5 per jaw) + single bunch nominal intensity shots for alignment Experimental Setup Measurement/observation tools Supply needs Cooling water (Flow: < 0.5 m3/h, Pressure: < 15 bar) Power supply for mechanical tables Primary vacuum Safety and radiation protection aspects General Safety Tank under primary vacuum to prevent any risk of oxidation during high-intensity beam impact on the absorber blocks (graphite). Radiological risk Residual dose rates not expected to be very much different from the estimations done for HRMT28. Contamination risk No contamination expected either during radiation or during handling No risk of contamination outside of the tank, nor inside the tank, since the graphite has been already validated at these beam parameters. 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Instrumentation to be installed Rosette strain gauges / Fiber optic strain gauges* PT100 / Fiber optic temperature sensors* Radiation resistant cameras for online visual inspection of the jaws Beam loss / position monitoring * Measurement based on the Fiber Bragg Grating principle: https://www.hbm.com/en/4596/what-is-a-fiber-bragg-grating/ 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Post Irradiation Examination Two main investigations initially foreseen to be conducted on the back-stiffener and other main components of the jaw : Metrology analysis Ultrasounds inspection 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 Conclusions TDIS key equipment of the HL-LHC injection system Equipment core (jaws) to be validated from the thermomechanical point of view HRMT experiment results expected to confirm the robustness of the jaw vs beam impact Test with low radiological / contamination risk Proposed date for the experiment: end of summer 2018 2017/09/15 David Carbajo Perez (STI-TCD)

WP14 TDIS jaw validation testing HiRadMat 2018 THANKS FOR YOUR ATTENTION