Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/2010 - NATF 1 Texas Nodal.

Slides:



Advertisements
Similar presentations
Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
Advertisements

1 Distributed Generation Task Force November 5, 2007.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Load Distribution Factor Calculation Update for Market Applications and studies a Presentation for NATF 11/2/ NATF1Texas Nodal.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Approval of Important Station Voltages for State Estimator Reporting Review of SE and Telemetry Standards Alex Sills Advanced Network Applications 10/13/11.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
Texas Nodal Electrical Buses and Outage Scheduling.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Nodal Planning Go Live Austin, TX February 3, 2011
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
Market Trials Update NATF March 2,
2017 Seasonal Adjustment Factors
Texas Nodal Market Go-Live Procedure
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Resource Cost Working Group
John Dumas Director, Wholesale Market Operations
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Profiling Working Group
Ancillary Service Trades and Ancillary Service Settlement
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
September Protocol Transition Plan
Commercial Operations Sub-Committee Update to TAC
Technical Advisory Committee
Resource Adequacy Demand Forecast Coincidence Adjustments
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/2010 - NATF 1 Texas Nodal

Load Distribution Factors Nodal Protocols state in section 4.5 – Dam Execution and Results (5) ERCOT shall determine the appropriate Load distributions to allocate offers, bids, and source and sink of CRRs at a Load Zone across the Electrical Buses that are modeled with Load in that Load Zone. The default distribution is the State Estimator hourly distribution for the seven days before the Operating Day. If ERCOT decides, in its sole discretion, to change this distribution for reasons such as anticipated weather events or holidays, ERCOT shall select a State Estimator distribution from a proxy day reasonably reflecting the anticipated distribution in the Operating Day. ERCOT may also modify this distribution to account for predicted differences in network topology between the proxy day and Operating Day. ERCOT shall develop a methodology, subject to Technical Advisory Committee (TAC) approval to describe the modification of the proxy day bus-load distribution for this purpose. 2 Texas Nodal

ERCOTs Proposal ERCOT has concluded from the results of the market trials, that it is advisable to open the nodal DAM market using a stable set of bus-load distribution factors in place of the state estimator hourly distribution from 7 days prior to the operating day. Use of filtered load distribution factors from 7 days previous allows telemetry errors to propagate into the DAM model Through capture and testing of LDF’s for a proxy day, ERCOT can reduce or eliminate unexpected DAM results caused by load distribution factors. ERCOT intents to open the market using a set of static, tested Load distribution factors. ERCOT will capture state estimator results from a “proxy” day, and test these LDF’s with sample DAM executions in the lab with “typical” bid information. ERCOT will examine the results, and iterate with adjusted distributions where unreasonable load distributions result. ERCOT will utilize these “proxy” distributions for each day of the target month, or until revisions are required. 3 Texas Nodal