E-beam scanner experience at FNAL

Slides:



Advertisements
Similar presentations
Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
Advertisements

FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
Low energy electron beam as a nondestructive diagnostic tool for high power beams. P. Logachev, D. Malutin, A. Starostenko, BINP, RUPAC’2006, Novosibirsk.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
F AD-Instrumentation Electron Beam Profiler for the Main Injector Randy Thurman-Keup Instrumentation Department APT Seminar 17 June 2014.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Proposed injection of polarized He3+ ions into EBIS trap with slanted electrostatic mirror* A.Pikin, A. Zelenski, A. Kponou, J. Alessi, E. Beebe, K. Prelec,
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
9/25/031 First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL September 25, 2003 Vic Scarpine.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
Status of Profile Fermilab 11 June 2013 Jim Zagel & Randy Thurman-Keup.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
F AD-Instrumentation Electron Beam Profiler for the Main Injector 26 March 2015 Randy Thurman-Keup FNAL / AD / Instrumentation Department.
IPM Simulations at Fermilab 3-4 March 2016 Randy Thurman-Keup.
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
W. Blokland*, R. Potts#, S. Cousineau#
ELECTRONIC DEVICES AND CIRCUITS
Sara Thorin, MAX IV Laboratory
A.Lachaize CNRS/IN2P3 IPN Orsay
Summary of experience with Tevatron synchrotron light diagnostics
Adriana Rossi, Sergey Sadovich
FCC-hh injection group 7
Thermal emittance measurement Gun Spectrometer
Proposals of new electron cloud monitor in the PS
High resolution profile measurements
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
Transverse emittance measurements
Beam size diagnostics using diffraction radiation
Linac/BC1 Commissioning P
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
Injection design of CEPC
Injector Physics C.Limborg-Deprey Feb.8th 2006
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

E-beam scanner experience at FNAL 9th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators 15-18 April 2013 Randy Thurman-Keup… Déjà vu? Fermilab

9th DITANET Topical Workshop -- R. Thurman-Keup State of the Lab Fermilab currently involved in a mostly labwide shutdown Tevatron and associated antiproton facilities turned off 1.5 years ago Main Injector and Recycler are being modified to support combined operation where Recycler accumulates protons from the Booster Protons are transferred to the Main Injector Recycler accumulates more protons while simultaneously the Main Injector ramps the energy from 8 to 120 GeV and sends them to the Nova neutrino experiment in Minnesota This parallel running will reduce the cycle time by a factor of two Main Injector parameters 588 buckets; 500 filled; 1 abort gap 1-2 ns longitudinal sigma 3 mm horizontal x 1 mm vertical sigma (at the proposed location of e beam scanner) 1 x 1011 particles per bunch 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Main Injector Increasing beam power in MI/RR implies the need for non-invasive instrumentation Electron beam deflection technique is one choice (working implementation at SNS, see W. Blokland’s talk) Electron beam is deflected by electric and magnetic fields of the protons Deflection Angle Electron beam Proton beam out of page Deflection vs. Angle provides information about the proton beam transverse profile 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Techniques for Main Injector Various techniques for measuring deflection Fast scan through peak of bunch (see W. Blokland’s SNS talk) Requires fast deflector (< 1 ns sweep time) Slow scan, akin to flying wires (most likely solution in short time frame of Nova) Position the beam and record the maximum deflection as the beam passes by Leave the electron beam stationary Sweep the beam along the proton direction Obtain longitudinal distribution Collaborating with Wim Blokland at SNS who is doing simulations of the various techniques 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Electron Deflection Slow electron sweep Position the electron beam Record the deflection of a bunch Move the electron beam and repeat Plots courtesy of Wim Blokland 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Electron Deflection Simulation Step the electron beam through the proton beam and record maximum deflections Derivative of deflection vs. position is nominally beam profile Derivative Plots courtesy of Wim Blokland 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Alternative Deflection Scheme Electron Sweep Sweep the electron beam along the proton bunch Sweep duration coincides with the duration of the proton bunch Beam Sim. Transverse s = 3 mm Meas. Sim. Transverse s = 3.5 mm Beam Sim. Longitudinal s = 2 ns Meas. Sim. Longitudinal s = 2.3 ns 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Simulated Camera Image Camera frames are ~30 ms Main Injector cycle is ~1 s Need to step many times per frame to accumulate data fast enough for measurement Complicated to extract each step 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Electron Beam Device Ion Gauge Optical Breadboard ~ 60 cm x 150 cm Ion Pump 60 KeV Electron Gun Kimball Physics Beam Valve Electrostatic Deflector Elliptical Main Injector beampipe Ion Gauge Pneumatic Insertion Device with OTR Stainless Steel Mirror Optic components box Phosphor Screen P47, 400 nm, 60 ns decay(?) 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Optics Two optical paths: OTR screen and Phosphor screen with some shared elements SS Mirror Phosphor screen 45 Degree Mirror 45 Degree Mirror Lens on moving stage Lens on moving stage Filters and polarizers 45 Degree Mirror on moving stage Image Intensifier (Hamamatsu) CID Camera Megarad version Camera Objective 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Devices Kimball Physics up to 60 KeV (we will use up to 15 KeV) 6 mA, pulsed, 1 ms to DC LaB6 cathode, 100 mm spot size 15 cm long ‘circular’ plates ~2.5 cm diameter Electrostatic Deflector Thermionic Electron Gun Plates Solenoid and steering magnets Cathode 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Test Stand Optical Transition Radiation Screens Electron Gun Faraday Cup Lens / Digital Camera Imaging Systems 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Gun Tests Gun has internal solenoid Scanned beam through waist at first screen Scanned beam sizes from Ce:YAG screens (1 A beam) Scanned beam sizes from OTR screens (1 mA beam) 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Optical Transition Radiation Electron energy low Broad angular distribution Mirror should be 15 instead of 45 Light yield over the 2 ms electron pulse (E. Bravin, private communication) Initial beam images determined to be blackbody No polarization Intensity increased nonlinearly with duration Damage to stainless steel mirror observed 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Wire Tests Wire to simulate proton beam e Beam pulsed on for 40 ms Wire pulsed for 20 ms Half the time the beam is deflected 0V 50V 100V 150V 200V 250V 300V 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Test of Electrostatic Deflector ~120 V Deflecting Voltage vs. Deflector Length Deflector Pulse 80 ns 500 V Deflector Pulse 15 cm long plates ~190 V 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Electrostatic Deflector Test Longer sweep Bright part off screen Beam size not uniform Possibly due to poor pulse quality Short sweep Effect is similar proton bunch passing by 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Magnetic Fields in Tunnel Need to shield beamline First attempt will be mu metal Electron beam Quad busses 3500 A 5 gauss Bx 0 g By Dipole busses 9000 A 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

Electron Beam Profiler 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Optics Phosphor screen Image Intensifier 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup

9th DITANET Topical Workshop -- R. Thurman-Keup Conclusions Plan to install in Main Injector this shutdown But… Fermilab shutdown is Running out of time Running out of people Electron Beam Profiler is Behind schedule Not an officially supported project, i.e. no priority 16 April 2013 9th DITANET Topical Workshop -- R. Thurman-Keup