National Grid Rhode Island: Piloting Wireless Alternatives

Slides:



Advertisements
Similar presentations
1 Case Study of Demand Response: Con Edison Business Program by Eileen Egan-Annechino Consolidated Edison Company of New York, Inc.
Advertisements

SmartPOWER Critical Peak Pricing (CPP) June 3, 2008.
Recent Successes in Demand Response
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Aggregating Small Loads to provide Ancillary Services
Time-of-Use and Critical Peak Pricing
Save Energy and Money PNM Energy Efficiency Programs
AEP Texas Energy Efficiency / Demand Response Programs Russell G. Bego, EE/DR Coordinator AEP Texas September 24, 2014.
PECO Smart Ideas Energy Efficiency Programs
1 SMUD’s Small Business Summer Solutions Pilot: Behavioral response of small commercial customers to DR programs (with PCTs) Karen Herter, Ph.D. Associate.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
Over 3,300 Megawatts and Counting Growing and Transforming One of Nation’s Largest DSM Portfolios.
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
Energy Efficiency – it makes sense! Ken Curry Energy Efficiency Manager
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Demand Response and the California Information Display Pilot 2005 AEIC Load Research Conference Myrtle Beach, South Carolina July 11, 2005 Mark S. Martinez,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEET Work Group 6 Update: BPA Demand Response April 21 st Karen Meadows Pam Sporborg.
Leading the Way in Electricity TM Tariff Programs & Services Customer Services Business Unit Overview of Demand Response At Southern California Edison.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Task XI Time of Use Pricing and Energy Use for Demand Management Delivery Task Status Report April 2006 Richard Formby.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Demand Response as a Distributed Energy Resource presented by: Mark S. Martinez Manager, Program Development PLMA Fall Conference September 2004.
Overview Review results Statewide Pricing Pilot Review results Anaheim Rebate Pilot Compare performance of models used to estimate demand response peak.
EmPower MD Act overview and Demand Response Training EmPower Maryland.
Demand Response 2010 and Beyond April 28, 2011 Pete Pengilly.
Statewide Marketing, Education, and Outreach ALJ Steve Roscow CPUC April 14,
DRMEC Spring 2016 Load Impacts Evaluation Workshop San Francisco, California May 10, SDG&E Summer Saver Load Impact Evaluation.
Communicating Thermostats for Residential Time-of-Use Rates: They Do Make a Difference Presented at ACEEE Summer Study 2008.
1 City of Palo Alto Utilities Large Commercial Customer Pilot Demand Response Program Customer Meeting March 8, 2012.
1 Pepco and Delmarva Power Demand Side Management Programs Stakeholders Meeting February 20, 2009.
1 BGE Smart Energy Pricing Program: Update to Maryland Public Service Commission April 23, 2008 Wayne Harbaugh VP – Pricing & Regulatory Services.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
BLACK HILLS ENERGY 2016 Energy Efficiency Portfolio Annual Results Overview December 8, :00am – 12:00pm MST Mark James – Energy Efficiency Program.
Commercial Customer Demand Response Program Pilot
SMECO Demand Response filing
Introducing Smart Energy Pricing Cheryl Hindes
Potomac Edison Preliminary Energy Efficiency and Conservation Programs
NW Demand Response Symposium
Potomac Edison Preliminary Energy Efficiency and Conservation Programs
Time of Use Rates: A Practical Option – If Done Well
Home Energy Savings Program Wyoming
Proposed FY18 Program Changes
Mass Market Demand Solutions in PJM
Allegheny Power Residential Demand Response Program
Northwest Demand Response Symposium
Restructuring Roundtable March 24, 2017 Boston, MA
NWA Suitability Criteria
Low Income Initiatives
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Demand Response in the 7th Power Plan
Arun Vedhathiri, Director, Project Delivery, National Grid
DECARBONIZATION & GRID MODERNIZATION
Can DER Defer Traditional Distribution Capital Investments?
Air-conditioning as part of a demand response strategy: A bigger picture Ozone Secretariat workshop on energy efficiency opportunities while phasing-down.
The Need for Compensatory Standby Rates
Low Income Programs - Hydro One Experience
Forging Sustainable Solar (and Storage) Incentives for New England
Tom Clark Vice President, Customer Service & Service Area Development
Presentation transcript:

National Grid Rhode Island: Piloting Wireless Alternatives Forging a Successful Program in Difficult Circumstances April 4th, 2017 Presented by: Courtney Lane Antje Flanders

Overview of Pilot Two Feeders out of Tiverton substation serving Tiverton & Little Compton, RI 5,200 customers (80% residential) Summer afternoon/evening peak Forecasted to be overloaded during peak hours starting in 2014 Wires solution (substation upgrade): Would have cost $2.9 million in 2014 Least Cost Procurement Law (System Reliability Procurement) allows for NWAs Non-wires goal: Load relief starting in 2014, up to 1 MW by 2017; defer upgrade to 2018 Plan for NWA filed and approved in 2012 Pilot scheduled to run through 2017

Pilot design and program offerings Energy Efficiency Targeted marketing to increase volume of existing EE programs Enhanced incentives for statewide EE programs Residential and Small-Business energy assessments with direct install measures Unlimited LEDs Heat pump water heaters Pilot specific measures Window ACs Window AC Recycling Demand Response No-cost WiFi tstats (CAC) No-cost WiFi tstats and plug load devices (WAC) *discontinued in 2016 Opt-in program with annual bill credit

Evaluation of Pilot Program Opinion Dynamics conducting annual evaluations First evaluation of 2012 pilot; currently finishing up 2016 evaluation Focus on: Marketing strategies and effectiveness Pilot impacts

Where Do Savings Come From?

Marketing Efforts

Marketing Evaluation: EW Online Survey Pilot Recall Annual Online Survey with EnergyWise Participants Recall of pilot marketing Importance in participation decision Used to assess participation lift Statewide Recall

Marketing Evaluation: General Population Survey Online survey with focus on 2016 marketing efforts Direct mail Email Phone call

DR Event Analysis Event impacts based on regression modeling Central AC Events: 3-7 pm Strategy: Set-point increases by 1-3 °F Window AC Events: 4-6 pm Strategy: Units shut off for the duration of the event Event impacts based on regression modeling

DR Event Analysis – Findings CAC: 13.3% runtime reduction and 0.5 kW savings/thermostat WAC: 0.04 kW savings per thermostat + Connectivity issues = Lower Than Expected Savings Potential solutions Real-time connectivity assessment Pre-cooling season outreach

Outlook for pilot Pilot on track to meet goals 2017 Enhancements Create 1MW of load relief by end of 2017 Defer substation upgrade by 4 years Projections show deferral until 2018 2017 Enhancements 2017 Plan includes an RFP for 250 kW of load relief. Results expected in 2017 on coordinated effort with with RI Solarize initiative Pilot starts WAC rebates, recycling, plugs   LEDs, DR Events HPWH RFP

Questions or Comments? Courtney Lane Antje Flanders 781-907-1876 Courtney.Lane@nationalgrid.com Antje Flanders 617-301-4643 aflanders@opiniondynamics.com