Accelerator Operations Department Readiness (Part 2)

Slides:



Advertisements
Similar presentations
Accel Computerized Maintenance Management System.
Advertisements

Contractor Safety Management
U.S. Department of Agriculture eGovernment Program February 2004 eAuthentication Integration Status eGovernment Program.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
E. M. Saleski FAC 11/11/08 Configuration Control of PPS FAC Review November 2008 E. Michael Saleski Controls Dept Safety.
Safety Oversight for SLAC Accelerator Department Operations
Operations Section.
Accelerator Operations and Efficiency Presentation by Roger Erickson SLAC Operations Review SLAC, June 15-16, 2004.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
The Maintenance and Engineering Organization
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
PEP-II Operational Safety and Management Presentation by Roger Erickson B-Factory Operations Review SLAC, April 26, 2006.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Division of Forestry Incident Management Teams John Nielsen WDNR, Division of Forestry Regional Forestry Leader-SOR.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety Configuration Management Process at JLab
Planning for Succession
Accelerator Readiness Review October 31, 2006
ONLINE INTEGRATION OF RADIATION SAFETY WORK CONTROL FORMS
Software Project Configuration Management
Shielding Design for LCLS Injector Operation – Phase one
Software Configuration Management
Planning a Successful School Event
Incident Command System (ICS)
Hot Checkout System for LERF Resuscitation
Our Change Management Approach
Management of Change Report Errors to Management.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Safety is part of our culture at Halliburton
County HIPAA Review All Rights Reserved 2002.
Safety and Accident Prevention
LINAC OPS Budget Review
Control Access into High Radiation Areas and Locked High Radiation Areas STE RP and 03.05, Rev #0.
LERF Readiness Review: Charge
Conventional & Experimental Facilities Dept.
Electron Beam Systems ETC and Methodology
Operations/Control room organization during commissioning
Ian Evans SSRL Safety Office
Elements of an Effective Safety and Health Program
Integrated Safety and Environmental Management
PSS verification and validation
Elements of an Effective Safety and Health Program
LCLS Personnel Protection System and Beam Containment System
LCLS Operation in 2009 Roger A. Erickson
Installation Status & Operational Readiness Process
SLAC Radiation Safety Work Control Form Process:
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Safety Program for LCLS Experiments
Treasury of Russia INTERACTION BETWEEN INFORMATION SYSTEMS USED IN PUBLIC PROCUREMENT AND PUBLIC FINANCE MANAGEMENT – THE CASE OF RUSSIA. Alexandr.
Presentation transcript:

Accelerator Operations Department Readiness (Part 2) Mike Stanek Accelerator Systems Division, Deputy Operations Department head 14-Mar-2007

Operations is ready for LCLS Injector Commissioning… Operations Documentation and Training systems are mature, established, and proven. Required LCLS documention and training have been identified. Development of new required documents is complete (and continues to evolve.) For LCLS Injector Commissioning, we have integrated new documents into an existing system. Same approach was used for commissioning PEPII

Roles and Responsibilities of Ops personnel are established. Ops manpower is committed to support LCLS Injector Commissioning plan.

Operations Dept “owns” the required documents. Documentation Operations Dept “owns” the required documents. Developed with input from LCLS system designers and engineers Approvals: Ops managers and Accelerator Division Safety Officer (also co-author for some documents)

Status of Required Documents LCLS Required Documents List has been generated by OPS, AD Safety Officer. Completed, verified, and released

Example: LCLS Search Procedure:

Operator Training to the LCLS Documents Safety systems – Training must be in place prior to operation! (as with any SLAC PPS) PPS Certification Workbooks 1. Reading the Applicable Documents 2. Operating the PPS Controls 3. Searching the PPS Zone 4. Performing a Safety Inspection 5. Checking the PPS Interlocks 6. Trainer & Supervisor signoff Incident and Alarm response Beam Containment System Procedures

Example LCLS PPS Certification Workbook:

Specific Operations Dept. Training Administrative Operations Directives – revised for LCLS – “Required Reading” sheet (complete). Technical system operation Primarily “On-the-Job”, will be learning along with the commissioning physicists. Accelerator systems that do NOT impact personnel safety are incorporated into the Ops training workbooks over time– with less formal treatment.

Training Record for PPS Operation

Operations Support of the Commissioning Plan Roles and Responsibilities are defined in AD Operations Directives Engineering Operator in Charge Responsible for safe execution of the scheduled program (PEPII and LCLS) Supervises and directs Operators on shift Operators (3-4 per shift) One per shift assigned to assist LCLS Commissioning Safety responsibilities (Search, PPS Operation, alarm response, etc.) Technical support (pre-run checkout, assist Commissioning team with measurements, tuning) Accelerator Dept Safety Officer

Beam Authorization Sheet Establishes Radiation protection conditions required to allow beam operation for each part of the accelerator. Includes Pre-run checks, Running conditions, Initial checkout (surveys and calibration) Radiation Physicist and AD Safety Office are co-authors EOIC is responsible for insuring conditions are met. Review and sign every shift LCLS Injector will have a BAS for commissioning Draft under review. It will be released to the EOIC when approval signatures are obtained from Radiation Physics, ADSO, and Head of Operations.

BAS - DRAFT

Work Control and Authorization Configuration control of required safety envelope devices. Work authorization is by Area Manager Reports to Accelerator Division management. Supports EOIC in controlling maintenance and repair work. Initiates Work Control forms, which triggers safety review, mitigation requirements, approvals eg. Radiation Safety Work Control Form (ADSO, Rad Physics)

Work Control (cont) Maintenance and repair work is tracked through a computer-based system (ARTEMIS). This system has built in “work control”, ISMS, and approval features. It has been modified for LCLS Injector system problem entries. Work on all SLAC Accelerator systems is subject to these controls. LCLS Injector fits in to the existing systems.

Questions?