Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
Training for Participants Date, Location, Venue 1 Welcome! Welcome to PEM 2 Module!
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Monitoring & Evaluation in World Bank Agriculture and Rural Development Operations SASAR Monitoring & Evaluation Workshop New Delhi; June 20, 2006.
Consultancy.
Quality assurance in IVET in Romania Lucian Voinea Mihai Iacob Otilia Apostu 4 th Project Meeting Prague, 21 st -22 nd October 2010.
NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Spanish-Portuguese Meteorological Information System for Trans-Boundary Operations in Forest Fires Agreement number ECHO/SUB/2014/
National Hydrology Project Central Ground Water Board WB Mission: 1-15 September
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
National Hydrology Project Framework for Monitoring and Evaluation (M&E)
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
National Hydrology Project Dr
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY
Monitoring Forest Resources for SFM in the UNECE Region
SPMU Details Sl. No. Post under NHP Name Designation 1.
WEL COME 1st World Bank Mission under the National Hydrology Project
NATIONAL HYDROLOGY PROJECT An Overview
Geo-spatial Products, Services and Applications
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
NHP National Hydrology Project Surface Water CHHATTISGARH.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
strengthening the elements of governance in Tajikistan
Concept Proposal for RA-III Regional WIGOS Centre
NATIONAL QUALIFICATIONS FRAMEWORK IN SERBIA
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
GEF Familiarization Seminar
National Hydrology Project
Implementation of the IPS MDTF
Implementation Arrangement under National Hydrology Project
National Hydrology Project
National Hydrology Project
National Hydrology Project
National Hydrology Project
Implementation Support
National Hydrology Project
Regional Stream flow monitoring and forecasting
Details of SPMU (in position), Staff Strength etc
1st World Bank Mission under the National Hydrology Project
Roadmap to Enhanced Technical Regulations of WMO
Status of Odisha Surface Water under NATIONAL HYDROLOGY PROJECT
National Watershed Management Project – “Neeranchal”
Role of external contractors - Assistance, monitoring and evaluation
Chemical Monitoring mandate
Status and Plan of Regional WIGOS Center (West Asia) in
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Comprehensive M&E Systems
Africa Centers of Excellence Project Financial Management
Roles and Responsibilities
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Commission on Instruments and Methods of Observation
Technical Guidelines for the Development of International Standards for Small Hydropower Plants   DONG Guofeng ICSHP  7 November, 2018.
Presentation transcript:

Ministry of Water Resources, River Development and Ganga Rejuvenation NATIONAL HYDROLOGY PROJECT TECHNICAL ASSISTANCE AND MANAGEMENT CONSULTANCY (TAMC) Ministry of Water Resources, River Development and Ganga Rejuvenation 23.05.2017, New Delhi

Objective of TAMC To provide high-level support for the implementing agencies to achieve high quality project implementation and to support project implementation activities

Role of TAMC : To support the National Project Monitoring Unit (NPMU) of the MOWR, RD & GR in the implementation of the project To assist all implementing agencies with project planning, procurement, technical developments, training and capacity building To support for project reporting to the World Bank, and monitoring project progress

Scope for TAMC : Technical advice and support for all the activities envisaged in the NHP identification and deployment of hydro-meteorological equipment IT hardware and software SCADA systems for irrigation IWRM Hydrological Modeling Reservoir Management Surface Water and Ground Water interaction & assessment Procurement and Financial Management Support ---continued

Scope for TAMC : --continued Development of management and financial reporting systems for internal and external reporting Development of software for web-based data entry for an MIS Monitoring and Evaluation (M&E) of project implementation Financial Monitoring and Reporting using MIS Technical & Management support for Establishment of National Water Informatics Center (NWIC) and its ISO certification Awareness raising Support for Capacity Building of all IAs Assisting IAs in understanding of MIS through Real Time Support Reporting

Technical Advice and Support: Provide international and national expertise to the project’s implementing agencies on a wide range of technical issues to improve delivery of the project, and to improve the technical quality of the project outputs Key Technical Issues: River Basin Planning Streamflow forecasting and reservoir operation Water quality assessment

Technical Advice and Support: Modelling of water resources, including groundwater modelling Irrigation management and operation Application of remote sensing technology in water resources management Assessment of climate change implication on water resources management Formulation of PDS proposal

Project Management Support: Project Planning including compilation of Annual Work Plan Identification of gaps/ bottleneck in the overall implementation of the project and provision of advice for improving management of the project Support for routine reporting of information required by NPMU, World Bank and DEA. Quarterly report Mid-term review report Annual procurement planning Develop effective communication of project outcome/ achievements to general public Developing project monitoring and reporting systems Implementation of an effective monitoring and evaluation (M&E) Carry out Gap Analysis on the existing IAs & plan for effective collaboration between the SW, GW, and WQ agencies.

Monitoring Equipment and Data Processing: Assistance in rationalization and standardization of monitoring networks for Surface Water Ground Water & Water Quality Observations Provide advice on water quality laboratory equipment, water quality parameters, field / laboratory equipment Review established practices of HIS and seek to identify improvements and revisions to Hydrology Project Guidance Manuals

Procurement Support: Analysing Existing Procurement system of IAs and suggest/ devise efficient Procurement system Development of standardized procurement documents, bid opening and bid evaluation procedures and guidelines Coordination of project standard technical specifications for key equipment Review of bidding documents, bid evaluation reports for major procurement Support for quality of installation of hydromet equipment – field verification of installations and test measurements Support to IAs in development of specific bidding documents Coordination of preparation of AWP & PP Advice on contract management as required by IA

Information Technology, Hardware and Software: Selection of IT and communication equipment hardware and software for data management, data use and data dissemination Contribution to review of major project software development, including the data management software for surface water information (eSWIS), groundwater data (eGEMS) and water quality data (e-WQIS). Implementation of uniform guidelines, standard methodologies and compliance of protocols for observation, entry and processing of data for SW, GW and WQ and general resource assessment, and revise them if necessary

Deliverables of TAMC: Inception Report (end of month 3) Brief quarterly reports on TAMC activities Annual progress report for TAMC activities Needs-based Technical Reports Mid-term report on end of Year 2 & 4 Draft withdrawal plan at the end of Year 7 and final withdrawal plan in the 2nd Quarter of Year 8. Process Documentation Report for the whole project Final report

Suggestive Person-months Consultant Team: S No. Position Suggestive Person-months   International Experience 1 Team Leader 78 2 River Basin Modeling Expert 72 3 Hydro-met Instrumentation Expert 36 4 Hydrogeologist and Ground Water Modeling Expert National Experience 5 Deputy Team Leader 6 Sr. Procurement Expert 7 MIS & IT Expert 8 Hydrologist and Hydrological Modeling Expert 9 Remote Sensing Expert 48 10 Capacity Building Expert Total person months 612

TAMC – key features: TAMC Location - New Delhi Regional Office - 4 Key Expert - 10 nos. With 612 man months Non- Key expert - 25 nos. with 975 man months Support Staff - 720 man months Advisor - 10 nos. with 46 man months