Bultfontein Road - Kimberley Slope Stability Evaluation

Slides:



Advertisements
Similar presentations
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Advertisements

Observations and predictions of the behaviour of large, slow-moving landslides in schist, Clyde Dam reservoir, New Zealand D.F. Macfarlane, Observations.
Corps & Cognition team meeting, 2014/12/02 A (new) non supervised neural learning algorithm for equilibrium (and homeostasis) Claude Touzet & Michel Dumitrescu.
Ripple Tank Summary.
GEOTECHNICAL ENGINEERING Session 07 Subject: S0012 / Introduction to Civil Engineering Year: 2007.
Design Parameters.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
SCADA-Based Condition Monitoring Joining advanced analytic techniques with turbine engineering Michael Wilkinson EWEA 2013, Vienna.
Soil Mapping and Erosion
By Andrew Burke, James Ferguson and Chris Silins.
1 Laser Scanning at Mogalakwena Platinum Mine-South Africa Presented by David van Rensburg Geotechnical Department Mogalakwena Platinum Mine AngloAmerican.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
Section Two Collapsing slopes. What is a landslide? soil layer rock layer wet soil Landslide takes place when large masses of loose rocks and soil move.
REALTIME FORECASTING OF SHALLOW LANDSLIDES USING RADAR-DERIVED RAINFALL Ryohei Misumi, Masayuki Maki, Koyuru Iwanami, Ken-ichi Maruyama and Sang-Goon Park.
Vegetative Treatment Area Performance and Design Recommendations Joshua W. Faulkner Biological and Environmental Engineering Cornell University.
Computer Engineering 203 R Smith Risk Management 7/ Risk Management The future can never be predicted with 100% accuracy. Failure to plan for risks.
Bearing Capacity Theory
SCT Operations Investigation into Abnormal Subsidence above a Longwall Panel in the Southern Coalfield, Australia Winton Gale Managing Director SCT Operations.
Understanding Geology and Its Engineering Properties… From A Civil Engineer’s Point of View… Dr.ÖZGÜR YILMAZER Geotechnical Engineer MSc. Geological Engineering.
SLOPE STABILITY IN OPENCAST MINES
Slope Stability in Jointed Rock Masses
PRM 702 Project Risk Management Lecture #28
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Surveillance and Proof M7 Slide 1. Definitions  Service Life: The overall life span  Storage Life: The life in specified storage conditions (part of.
Evaluating the Effectiveness of the 1750 Tonne Shields at Moranbah North Mine Kelly Martin Mehmet Kizil Ismet Canbulat.
Earthquake Hazards.
Problems How do surfaces of a ramp with differing frictions affect the amount of work required to move an object up the ramp? Which surface will require.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
EPSRC Grant: EP/FP202511/1 WP4.2 – Performance based inspection of flood defence infrastructure: Integrating visual inspection and.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
TRENCHING & EXCAVATION
Brittle Deformation Remember that  is the angle between  3 and a plane.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
SAFE & EFFECTIVE STAFFING The New Zealand Experience SAFE & EFFECTIVE STAFFING The New Zealand Experience.
Mass Wasting Week 6.
Going Forward: What Can We Do? Limit Equilibrium Analysis of Slopes.
E&Y Top-down, Risk-based Approach to assessing Key Control Summary of the E&Y’s Framework Materiality Controls SAP Control Risk Heat Map Yue Yong Carolyn.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Decision Tree Analysis. Definition A Decision Tree is a graphical presentation of a decision-making process within a business which aims to highlight.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Lecture 5: Hemispherical Projection & Slopes
Additional site investigations Study on long-term behavior of rock PhD project at Technische Universität München Chair of Engineering Geology Carola Wieser,
GEOTECHNICAL ENGINEERING Session 07
Andrzej Kotyrba Central Mining Institute Katowice, Poland
Organisation Control KPI’s & an industry Review
Luke Palmer, Academic Background
Geographic Distribution of Earthquakes
RISK ANALYSIS AND REMEDIAL WORKS AT KAAIMANS PASS
Hodograph Analysis Thermal Advection Stability
What is water Erosion..
CHAPTER11 Project Risk Management
Geotechnical Engineering II
UGRC 144 Science and Technology in Our Lives/Geohazards
Regression Computer Print Out
مادة الدرس : مقدمة في علم الإحصاء
ANALYSIS AND DESIGN CONSEPT OF GRE PF RETAINING WALL
بسم الله الرحمن الرحیم.
Working Procedure Second meeting Drafting groups 1. March Deliver final group papers 8. March Synthesis Paper prepared by COM by 15. March Cases by case.
Slope Hazards in the Built and Natural Environment
7 Things You Can Do To Better Understand What You Read
PAT GEOTECHNIC INTRODUCTION TO GEOTECHNICAL ENGINEERING.
Historian as a Discipline
Use of Joint Trace Plots to Evaluate Stability of Mining Excavations
Internal Assessment.
Risk Analysis in Slope Stability Analysis Landslide risk in Sweden
Hydroelectric Cavern’s Stability evaluation and rockbolts failure investigation using induced seismicity Sivakumar Cherukuri.
Chapter 12 Vocabulary.
DESIGN PROCEDURE FOR UNDERGROUND QUARRIES
Bearing Capacity of Layered Soils.
Presentation transcript:

Bultfontein Road - Kimberley Slope Stability Evaluation

content Input Data for Kimberley Pit Slope Analysis Results of Slope Stability Analysis Break-Back Process Analysis Conclusions

INPUT DATA FOR KIMBERLEY SLOPE ANALYSIS

Kimberley Pit East Slope

Boreholes and Sections

Idealization of Slope

Rock Mass Properties

Results of Slope Stability Analysis

Deep and Shallow Seated Failures

Summary Results Limit Equilibrium Stability Analysis

Break-Back Process Analysis

Historic Rate of Break-Back

Rate of Break-Back and Slope Angle

Risk Zones as Function of Slope Angle

Interpretation of Risk Zones

Conclusions

Conclusions The results of the geotechnical analysis indicate that: The occurrence of shallow failures in the more disturbed material close to the slope face is more likely due to the natural degradation of rock mass conditions with time. Time is a factor that has an effect on the stability conditions of the slope, but it is also a factor difficult to account for in engineering models at the present time. Current risk to the Bultfontein Road has been defined in a qualitative manner in terms of overall slope angle as low risk (<30º), moderate risk (30º to 33º), high risk (33º to 36º) and very high risk (>36º). These angles define corresponding zones of risk around the pit with levels of risk increasing towards the slope crest. The Bultfontein Road is currently located within the low risk zone. Slope break-back and surface deterioration will continue, and periodic shallow failures will be experienced from time to time, though it is difficult to predict the rate of occurrence of these events. Continuous slope inspections and monitoring are the available strategies to anticipate the occurrence of failure events. The likelihood of a deep seated failure (in the geology underpinning the pit) affecting the Bultfontein Road is very small.