Alarms in relation to PM

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Advertisements

What’s up? (Delete this slide.) 1.What follows is the required skeleton for your presentation. 2.Do not change the organization or number of slides. Make.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
130 October 2009 PIC - WIC - LHC_CIRCUIT UNICOS PVSS.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
Tutorial 1: Getting Started with Adobe Dreamweaver CS4.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
Middle-tier servers for CMW Bartek Paszkowski AB-CO-FC.
CERN LASER Alarm System Katarina Sigerud, CERN ACS workshop, 9 October 2005.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
Jan Hatje, DESY CSS ITER March 2009: Technology and Interfaces XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 CSS – Control.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
UNICOS LHCLoggingDB Josef Hofer EN/ICE/SCD. Agenda The LHC Logging Database Purpose of the LHCLogging component Basic concepts Advanced concepts Logging.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
ESS Integrated Control System Software Core Components S.Gysin
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
LabVIEW Core I with RADE introduction EN/ICE/MTA.
Roberto Saban TS/HDO HCWG Post Mortem Systems Binary data sent over CMW PM server Binary files ASCII files PM analysis tools CMW QPS BrowserOther.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
- My application works like a dream…does it. -No prob, MOON is here. F
Architecture Review 10/11/2004
Data providers Volume & Type of Analysis Kickers
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Performance monitoring framework for the technical infrastructure
R. Denz, A. Gomez Alonso, AT-MEL-PM
Summary of first LHC logging DB meeting
How do we tackle the extended requirements?
Computing infrastructure for accelerator controls and security-related aspects BE/CO Day – 22.June.2010 The first part of this talk gives an overview of.
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
TriggerDB copy in TriggerTool
Monitoring of the infrastructure from the VO perspective
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Wavestore Integrates…
Interlocking of CNGS (and other high intensity beams) at the SPS
E. Manola-Poggioli 05 December 2001 EDMS doc
The LHC Beam Interlock System
Operation of Target Safety System (TSS)
Presentation transcript:

Alarms in relation to PM Katarina Sigerud LHC Post Mortem Workshop 16-17 January 2007

LHC PM workshop - Alarms in relation to PM K.Sigerud Content What are alarms? What is LASER? LASER – PM integration Open issues 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud What are alarms? Abnormal situations Range from severe alarms to warning states Reported by surveillance programs Provided by application writers and equipment specialists Collected, distributed and archived by an alarm reporting tool The LHC alarm service - LASER 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud What is LASER? Delivers an alarm service for the operation of the CERN accelerator chain and technical services A distributed, ‘layered’ system A dispersed set of surveillance programs detecting alarms An alarm server that collects, analyses, distributes and archives alarms Dedicated consoles and software clients displaying alarms 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud LASER alarm console Main tool for alarm display Provide facilities to Configure and manage alarms displayed Search archive and alarm definitions Export alarm lists in different formats to email or file 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud Alarms for PM analysis Where no internal PM buffer exists E.g. machine protection (PIC), vacuum Provide information about the surrounding physical environment E.g. radiation protection, electricity outages 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud LASER – PM integration Extract from alarm archive provided in SDDS format All alarms for the time range (10 minutes before – 5 minutes after) Triggered by PM system 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

Alarm archive SDDS file !generated by Laser Alarm Console &description contents="Laser Console ACTIVE list report (Thu Jan 11 09:43:50 CET 2007)" &end &column name=Timespec.seconds, type=long &end &column name=Timespec.nanoseconds, type=long &end &column name=AlarmId, type=string &end &column name=Status, type=character &end &column name=System, type=string &end &column name=Identifier, type=string &end &column name=Description, type=string &end &data mode=ascii &end 40 1158044583 0 "COMM_TIMPROC_LHC:E_OPC_GTCCHILLSUX5:4163" "N" "COMM TIM LHC" "SUX5 3582-R - E_OPC_GTCCHILLSUX5" "DEFAUT FONCTIONNEMENT EQUIPEMENT TIM" 1161609655 200000000 "EAU_DEMI_LHC:FDED-00101:20" "N" "EAU DEMI LHC" "UA67 2639- - FDED-00101" "DEFAUT GENERAL" 1163500884 380000000 "CNGSAUX:XG.REFL-CNGS:1" "N" "CNGS AUX" "XG.REFL-CNGS" "COOLING FAILURE" 1163513041 680000000 "CNGSAUX:XG.HORN-CNGS:1" "N" "CNGS AUX" "XG.HORN-CNGS" "COOLING FAILURE" 1164210543 110000000 "CMWALARMMONITOR:XG.HORN-CNGS:2" "N" "SURVEILLANCE" "XG.HORN-CNGS" "Disconnected from CMW Alarm Monitor due to connection breakdown or server failure" 1164210543 127000000 "CMWALARMMONITOR:XG.REFL-CNGS:2" "N" "SURVEILLANCE" "XG.REFL-CNGS" "Disconnected from CMW Alarm Monitor due to connection breakdown or server failure" 1164719349 982000000 "CRYO_EXPERIMENT_LHC:QUR1H:9841" "N" "CRYO EXPERIMENT LHC" "USC55 3524- - QUR1H" "[A] DEFAUT REFRIGERATEUR CMS" 1164807001 0 "EAU_BRUTE_LHC:CIRC_EP_SUX5:8264" "N" "EAU BRUTE LHC" "SF5 3565-SS- CIRC_EP_SUX5" "DEFAUT CIRCUIT EAU PRIMAIRE SUX5" 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud Open issues How will the triggering be done? Via timing? Only? Should manual triggering be possible? Should the trigger be parameterized? Different time ranges Different alarm configuration 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud

LHC PM workshop - Alarms in relation to PM K.Sigerud Open issues cont. What should be extracted from the alarm archive? All alarms or a subset? Which timestamp to use? Provided by surveillance program or LASER? Or both? Possibility to access alarm archive outside of PM trigger? Available tools appropriate or different interface required? Who will store the additional data? What are the lifetime requirements? 16-Jan-07 LHC PM workshop - Alarms in relation to PM K.Sigerud