Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
EU Developments Transmission Workgroup 3rd November 2011.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
EU Developments Transmission Workgroup 6th October 2011.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
RWE Transportnetz Gas 04/28/2009PAGE 1 ERGEG Gas Regional Initiative NW Short-term Capacity Project (C1) Comments by TSOs regarding different models discussed.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
European Developments Transmission Workgroup 3 rd May 2012.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Gas Regional Initiative South South-East
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Public Consultation : main conclusions (1/2)
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Conclusions STC Core Group 8 September 2009 The Hague
19th GRI Coordination Group meeting
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
New transparency guidelines
EU Tariffs Code Update Based on Refined Draft as of 30th October
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
EU Implementation Programme
Allocation of Capacity in Portugal Under the New Regulation
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
Transparency Project GRI NW Region.
European Transparency Requirements
Gas balancing – where next
Gas Regional Investment Plan project
37th IG Meeting South Gas Regional Initiative
NTS Entry Charging Review Update
Gas Regional Initiative Update on progress and latest developments
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative South South-East
Ofgem presentation to Gas Transmission Workstream
Gas Regional Initiative South South-East
Presentation transcript:

Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity through examination of how unused capacity could be released day-ahead and investigating into how TSOs could be incentivised Aim: make available firm primary capacity on day-ahead market

Discussed Models Day-Ahead Oversubscription TSO has good knowledge on how much capacity will be used TSO slightly oversubscribes the system‘s capacity In (rare) cases where flows exceed the system‘s capability TSO buys back the usage rights from shippers Short-Term Calculation TSOs calculate available firm capacity based on long term assumptions and scenarios In the period running up to real time TSOs have more certainty about network conditions, e.g. Can release additional firm capacity to the market day-ahead

Incentivisation TSOs: Incentive mechanism that compensates the additional financial risks coming along with providing additional capacity is needed If not fulfilled, how does it impact the project? The alternative of an ex-ante cost recovery guarantee requires a high level of detailing (no quick-win) An agreed methodology will probably prove to be sub-optimal for each IP No incentive for the TSO to do more than absolutely required/covered TSOs see incentive mechanism as prerequisite for further steps

Status Quo – according to TSOs France: Regulatory system incorporates an incentive to oversell capacity as long as regulator does not increase its sales forecast each year Belgium: Regulatory system not specific to additional revenues generated from extra sales of capacity. No ex-ante guarantee that TSO would be allowed to retain extra revenues Germany: Additional costs for establishing short-term capacity market are not covered in revenue cap and will in practice lead to lower earnings of the TSO Netherlands: revenues resulting from capacity sold above this estimated quantity can be kept by the TSO

Status Quo – The Wider Picture European Process coincides with GRI NW STC process Framework Guidelines Capacity Allocation contain proposals to strengthen short term markets Aims at harmonised standards on certain capacity related issues Potentially impacts STC pilot Finalised Document to be expected in May 2010 ENTSOG to draft network codes Incentivisation is closely linked to national regulators practices National processes e.g. in Germany

Proposed Way Forward April to August 2010 September 2010 October 2010 Workshop on incentives for TSOs to maximise available short-term capacity September 2010 Re-evaluate and if needed adapt project in light of recent developments on European and national levels October 2010 Core Group to propose detailed project Update Programme Board November 2010 Stakeholder Workshop Draft implementation plan to be prepared by Core Group

Thank You!