WP-X XFEL Project Progress Report (2016-3)

Slides:



Advertisements
Similar presentations
European Students of Industrial Engineering and Management European Students of Industrial Engineering and Management Using.
Advertisements

DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
[Presentation Title] – Edit this footer by clicking on “View” tab,  “Slide Master” button  this slide’s layout [Date] Changing... Leading... Learning...
Strategy and Status of Reference Cavities for European XFEL
First operation of the XFEL linac with the 2K cryogenic system
Bernd Steffen, DESY
Power Couplers, HOM Couplers and Tuners for the XFEL
First and Last Name Title of Presentation Place, Date
TESLA Type Cavity HOM Coupler Multipacting
(Selected) Project Management Processes at the XFEL
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Presentation Title Here
E-XFEL Status and First Beam Results
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
WP-X XFEL Project Progress Report (2014-3)
[Project Name] [Presenter Name]
WP02 PRR: Master Oscillator and RF Reference Distribution
Racks Coordination 09 September 2011 E. Negodin
WP02 PRR: Master Oscillator and RF Reference Distribution
Conducting the performance appraisal
Racks Coordination 16 September 2011 E. Negodin
09 Juni 2015 L1 Inbetriebnahme Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
High speed LWL connections for WP02
for X-ray Optics and Beam Transport
Findings in RF Power Couplers after operation on cavities in PXFEL2
Commissioning and First Cooldown of XFEL Linac
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Functionality Stefan Simrock How to edit the title slide
MS Project Web Access to WP Plan
WP Coordinaten XFEL RF Operation
WP02 PRR: Master Oscillator and RF Reference Distribution
Markus Hüning 3rd XFEL Collaboration Meeting
Link Diagnostic Electronics
Conducting the performance appraisal
Yuhui Li How to edit the title slide
Executive Summary Project Name: Period :.
presented by Elmar Vogel
ADD TITLE HERE Add subtitle here.
[Project Name] [Presenter Name]
How to edit the title slide
[Project Name] [Presenter Name]
SSI Toolbox Status Workbook Overview
Presentation Title Subtitle or Date.
Hard X-ray self-seeding for XFELs: towards coherent FEL pulses
[Project Name] [Presenter Name]
[Team Name] Monthly Technical Report [Safe Genes Program]
Presentation Title Subtitle or Date.
INSERT TITLE HERE.
Title Slide Subtitle.
TITLE PAGE.
Denis Kostin, MHF-SL, DESY.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
Cryomodule Performance in FLASH and XFEL
ADD TITLE IN CAPS ADD SUBTITLE IN CAPS Type presentation author here
Modified Beam Parameter Range
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TTC Meeting, July , Saclay, France.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
Schedule (Major Deliverables and Milestones)
Presenting Project Status
Hans Weise, DESY February 5th, 2019
Title of presentation Subtitle Name, job title DD Month YEAR.
A brief guide to this template
A brief guide to this template
A brief guide to this template
A brief guide to this template
Title of presentation Subtitle Name, job title DD Month YEAR.
[Project name] [Presenter name]
Presenter Details Date
Presentation transcript:

WP-X XFEL Project Progress Report (2016-3) How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row. presented by

Comparison of forecast and achieved progress: August 16  November 16 please use this slide to list the WP activities, which have been scheduled for the period above provide information to which extent these activities are completed this refers to block C) and F) of your Status Report you can use copy&paste! Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View

Reasons and Impact for schedule deviations August 16  November 16 Only for activities that have been completed much in advance or which are not yet completed: Please use this slide to provide briefly your assessment, why activities have been completed in advance, resp. why activities got delayed. (e.g. due to sufficient or missing manpower, problems with deliveries, organizational issues etc.) make sure you list the impact possible delays have this refers to comments to block C) of your Status Report you can use copy&paste!

Activities and milestones scheduled for the next half year Please use this slide for a brief overview, which activities and milestones are scheduled for the 6 month period Remember that you can extract this info from you project plan using the Show Reporting Milestone view see http://xfel.desy.de/xpo/mspe4xfel/howtos/ and select Howto: extract reporting milestones for presentation this refers to block C) and G) of your Status Report you can use copy&paste!

WP Schedule: Ready for Beam Given below are the current assumptions ready for beam time of the facility. If applicable indicate if deliverables of your WP is to meet these dates. You can remove entries not applying to your WP! XS1 ready for Beam 12/2016 North Branch ready to accept electron beam: 28.02.2017

this refers to block H) and I) of your Status Report Open Issues List issues which are important or urgent for your WP and need to be resolved pending decisions, organizational issues, missing requirements, missing input from other WPs / Project Board If possible give due dates for the resolution and consequences (in schedule, cost, functionality/scope) if the issue is not resolved indicate if you think, this point should be followed up by the XFEL Project Board this refers to block H) and I) of your Status Report you can find all listed issues on the most recent issue list discussed during the TC Meeting: http://indico.desy.de/categoryDisplay.py?categId=66 or the Top-Level Milestones section of the Global Schedule comment if these issues are still open, closed etc.