EO Applications Parallel Session

Slides:



Advertisements
Similar presentations
ESA Data Integration Application Open Grid Services for Earth Observation Luigi Fusco, Pedro Gonçalves.
Advertisements

Data Management Expert Panel - WP2. WP2 Overview.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
The CrossGrid project Juha Alatalo Timo Koivusalo.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
EU 2nd Year Review – Jan – WP9 WP9 Earth Observation Applications Demonstration Pedro Goncalves :
DataGrid is a project funded by the European Commission under contract IST Earth Observation applications in EU DataGrid (EDG) and follow on.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
WP9 – Earth Observation Applications – n° 1 Experiences with Testbed1, plans and objectives for Testbed 2 Testbed retreat th August 2002
KNMI Applications on Testbed 1 …and other activities.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
WP8 Status – Stephen Burke – 30th January 2003 WP8 Status Stephen Burke (RAL) (with thanks to Frank Harris)
WP9 – Earth Observation Applications – n° 1 WP9 report to Plenary ESA, KNMI, IPSL Presented by M. Petitdidier, IPSL DataGrid Plenary Session 5 th Project.
EU 2nd Year Review – Jan – WP9 WP9 Earth Observation Applications
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
WP9 – Earth Observation Applications – n° 1 Planning for EO Application Deployment DataGrid WP9 EO Applications Parallel Session 5 th Project Conference.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Project Status Fabrizio Gagliardi.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
INFSO-RI JRA 1 Testbed Management Technologies Alain Roy (University of Wisconsin-Madison, USA) ETICS 2 Final Review Brussels - 11 May 2010.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
WP3 Information and Monitoring Rob Byrom / WP3
5b. ESA & WP9: effort and recovery plan ESA DataGrid Review Frascati, 10 June Welcome and introduction (15m) 2.WP9 – Earth Observation Applications.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
Open Grid Services for Earth Observation Pedro Gonçalves.
ESA DataGrid Review – 10 June 2002 – n° 1 Summary item 3  ESA and WP9 part 1 (45m)  DataGrid Frascati infrastructure (AT, 7.5m)  ESA GOME application.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
WP10 Goals and accomplishments from WP10 point of view J. Montagnat, CNRS, CREATIS V. Breton, CNRS/IN2P3 DataGrid Biomedical Work Package.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 WP9 Earth Observation applications.
Earth Observation inputs to ATF Annalisa Terracina EU-DataGrid Project Work Package 9 – EO Applications April 2003 CERN.
DataGrid France 12 Feb – WP9 – n° 1 WP9 Earth Observation Applications.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
5a. ESA & WP9: scale up study ESA DataGrid Review Frascati, 10 June Welcome and introduction (15m) 2.WP9 – Earth Observation Applications (50m)
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Enabling Grids for E-sciencE University of Perugia Computational Chemistry status report EGAAP Meeting – 21 rst April 2005 Athens, Greece.
Bob Jones EGEE Technical Director
WP 9.4 Use Case (ESA-ESRIN, IPSL, KNMI)
Work Package 9 – EO Applications
Gavin McCance University of Glasgow GridPP2 Workshop, UCL
EGEE Middleware Activities Overview
DataGrid Quality Assurance
JRA3 Introduction Åke Edlund EGEE Security Head
OGC TB13 EO Cloud Thread Cristiano Lopes 03/04/2017.
Grid related projects CERN openlab LCG EDG F.Fluckiger
StratusLab Project Status
Introduction to Grid Technology
Elisabetta Ronchieri WP3
Advancements in Availability and Reliability computation Introduction and current status of the Comp Reports mini project C. Kanellopoulos GRNET.
WP1 activity, achievements and plans
Earth Observation and Climate Applications for EGEE
Job workflow Pre production operations:
Leigh Grundhoefer Indiana University
Report on GLUE activities 5th EU-DataGRID Conference
Future EU Grid Projects
Wide Area Workload Management Work Package DATAGRID project
Building and running HPC apps in Windows Azure
gLite The EGEE Middleware Distribution
Site availability Dec. 19 th 2006
Presentation transcript:

EO Applications Parallel Session DataGrid WP9 6th Project Conference – May 12-15, Barcelona

Overview of Objectives & Achievements Work plan for May-Dec 2002 Outline Status Report Overview of Objectives & Achievements Work plan for May-Dec 2002 EDG Follow-on plans Specific Issues

Status Report - Tasks Task 9.1 EO requirements definition Completed Task 9.2 EO related middleware components (pm1 - pm18) Task 9.3 EO Platform Interface Development (pm7 - pm30) Nearly done D9.4 (Report) due July Task 9.4 EO Ozone/Climate application (pm13 - pm36) D9.3 completed Web Portal version 1 completed D9.5 (Demonstration & Report) due December Task 9.5 Full scale Earth Science application (pm7 - pm18)

Status Report - Deliverables Delivered to EU D9.1 EO Requirements Specification D9.2 Report on Grid Testbeds State-of-art D9.6 Report on the EO application scaling study D9.3 Demonstration /report of second software components release In Work D9.4 Report on EO application platform interface Not started D9.5 EO application processing test-bed (Demonstration and report)

Status Report – Effort (pm) From QR9 Report (simplified) Estimated Spent Remaining Deviation KNMI 24 22 8 +6 IPSL 36 40 5 +9 ESA 94 131 11 +48 ENEA 3 +3 Total effort remaining est. 24 pm (reported) Total effort available to completion est. 64 pm (actual) ESA : 5 (40) IPSL : 2 (16) KNMI : 1 (8)

Overview of Objectives & Achievements EO Application environment and components Deployment of GOME (proc. & val. algorithms), EO Grid Portal EO Grid Engine Low-level interfacing components, scripts, etc. EO infrastructure deployment UI, CE, SE at partners sites Campus Grid, Local Grid Increasing GRID awareness in EO many new applications being discussed under way : GREASE, GOMOS, Participation to EDG ATF, AWG, QAG, Project conf, etc. EDG TestBed evaluation Next evaluations : May-Aug & Sep-Dec Next demo ?

Work plan May-Dec : Tasks & Deliverables Common application layer specification, design, prototyping Grid-Engine & Portal prototype EDG sites deployment D9.4 : EO Platform Interface (Report) Task 9.4 GOME processing / validation deployment GOMOS deployment ? Further development of EO Use Cases / Requirements (AWG / ATF / QAG) D9.5 : Final Evaluation (Prototype demonstration and report )

Workplan May-Dec : Evaluation of EDG 2.0 New features available to be evaluated information system (R-GMA) improved JSS capacity RLS (WP2 new rollout of RC/RM) new metadata capabilities SE space reservation MPI other features ? Re-run EO GOME data challenge process 1,2,3,4,5 years ? OPERA GOMOS

Workplan May-Dec : EDG Activities Meetings planned, key topics, documents, inputs etc. AWG Pritority list Use Cases ... ATF EO Requirements QAG Quality metrics

Workplan May-Dec : Next demonstrations EO Grid Portal deployment on new Grid Engine + infrastructure processing multiple orbits submit & monitor multiple processing/validation jobs on multiple grids data transfer from (to ?) AMS metadata handling by RLS ? interfacing to new EDG security OPERA ... GOMOS Other ?

Workplan May-Dec : Application development GOME Data challenge – more GOME data processing required ? GOMOS operational requirements Other ?

Workplan May-Dec : EO Platform Interface Several parallel tasks Requirements & design Code development & testing of basic functionality select target Grid authenticate browse Information System list available applications execute jobs (on the different available Grids) retrieve results of SOAP interface Integration of client and sever (via SOAP) new Grid Portal roll-out Write-up of D9.3

EDG Follow-on plans Future presence of EO community in the leading-edge pan-European Grid ? Continuation of EO VO ? From June EDG app testbed will be transfered under LCG EO applications will be supported until end of EDG project Future participation of EO Sites Resources & Services ?

Specific Issues