Status of material tests

Slides:



Advertisements
Similar presentations
Manufacturing Processes
Advertisements

Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LiH Absorber for MICE Alan Bross May 31, LiH Absorber in Cooling Channel  LiH absorbers are now the “baseline” for the initial 4D cooling u Replaced.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Milano A. Basti, INFN-Pisa 1 T4CM Design and R&D Status at Pisa A.Basti INFN-PISA.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
Status of Activities at CERN
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
Lithium Hydride Absorber Program Update Alan Bross.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Mechanical design and tests of the new X-band flange
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Presented by: Joshua Bush Michael Goetz Michel McCluskey
on behalf of the Phase II Collimation Design team
EuCARD Status: September 2010.
Total quantity (spare parts)
Status of GASPARD mechanics
LARP Phase II Secondary Collimator RC1
Manufacturing of the first FCC-hh beam screen prototype for ANKA
ob-fpc: Flexible printed circuits for the alice tracker
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Dump Core Studied Design Solutions
LARP Phase II Secondary Collimator RC-1
Analytical Cost Model (16 T dipole)
Diamond based Composites for Collimators Contribution to EuCard
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
LARP Phase II Secondary Collimator RC1
Current Design and Short Status
Phase II Collimators : design status
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Production Cryo HL-LHC BPMs
Presentation transcript:

Status of material tests G. Arnau Izquierdo LHC Collimators Phase II, CDM2 17.07.08

Molybdenum plates, for the Rib Framework Need according to last design version of the Rib:15 x 50 x 1100 mm³ Standard dimensions at Plansee: 10 x 500 x 600 , 12.7 x 400 x 600 and 20 x 400 x 600 Special fabrication 15 (±5%) x 50 (±2) x 1100 (+5/-0) possible Guaranteed flatness 1.5 mm Dull surface (hot rolled and pickled) Minimum order 11 units, price 195.3 €/kg Delivery time 8 weeks a.r.o. Order placed for a plate 20x50x400 mm³ for tests 262 €/kg, 1048 € Delivery 23.7.2008 ex works Tests foreseen Machining: hippodrome holes for shafts, surfacing, threaded holes? Welding? Dimensional stability. What machining?, what thermal cycle ? Outgassing after machining + standard cleaning. What cleaning ? Other? Mechanical tests of pin and screw assemblies, … LHC Collimators Phase II, CDM2 17.07.08

Mo screws LHC Collimators Phase II, CDM2 17.07.08

Molybdenum tube, for the Cooling Coil Framework Need according to last design version OD10 x 1 x 3750 mm Tight bending Rmin = 1.8 x OD Standard dimension at Plansee Max length ~3000 mm  a weld is needed to get 3750 mm Impossible to bend to requirement Order placed for tube in stock Two tubes 1260 mm + 1800 mm 2460 €/kg, 2079 € Delivery expected from 4.08.2008 Tests foreseen bending welding If successful, Cu-coating and casting of Cu-diamond LHC Collimators Phase II, CDM2 17.07.08

Diamond composites, for the Jaw Preliminary tests of UHV coampatibility Two samples of Cu-D and Al-D proposed by L. Weber. Ready available, irregular shape Outgassing tests made by I. Wevers Cu-D: 2x10-12 torr·l·s-1·cm-2 Al-D: 10-11 torr·l·s-1·cm-2 Preliminary results compatible with standard UHV use Further steps Functionally interesting? Study feasibility of required dimensions Tests foreseen Thick coating for machining Brazing to ceramics and to copper Radiation effect on properties Other… 5mm LHC Collimators Phase II, CDM2 17.07.08