A Midsummer Night’s DREAM

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Market Operations Presentation Board of Director’s Meeting November 18, 2003.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Loads Acting as a Resource Relationships with QSEs and LSEs
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Demand Response in Midwest ISO Markets February 17, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
1 Cutover Market Call December 01, :30 AM.
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,
Protocol Revision Subcommittee Tom Burke June 7, 2012.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
INTRODUCTION ERCOT’s Technical Advisory Committee (TAC) chartered a Task force to investigate the current regulatory and market framework for distributed.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
Wind Management at MISO
Appeal of PRS Rejection of NPRR 667
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
August 25, 2016 TAC Update to COPS
RTDF Overview of Data Analysis & Status of “Consesus Items”
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Alternative Approach for Loads in SCED v.2
Interpreting DREAM NPRR 777.
Settlements Analysis due to SFT Deration Issue
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
30 Minute Reserves EPFSTF January 4,
The Network Model Management System
Presentation transcript:

A Midsummer Night’s DREAM Vision for NPRR 777

Goal: SENA developed NPRR 777 with the intent to implement the findings of the DREAM task force, with a focus on integrating price responsive resources connected to the distribution system. SENA also elected to: Create a new resource type Enable a load-zone dispatch Leverage existing settlements, RUC practices, price discovery, and performance metrics associated with traditional resources Such that distribution-connected resources that behave like traditional resources may opt-in to participate in a SCED dispatch

Goal: Efficient price formation, where deployment of price-responsive distribution connected resources is reflected as a resource serving load, rather than a reduction in demand. Increased market efficiency and reliability, through transparency and ISO awareness of price-responsive distribution connected resources. Incremental resources available to ERCOT for Assessment of transmission needs / studies RMR alternatives

Exclusions 777 focused on protocol revisions that enable existing distribution connected resources that cannot currently participate in SCED. The current NPRR excludes distributed resource participation in Nodal Dispatch Ancillary Service Markets Day-Ahead Markets Congestion Revenue Rights Markets* *Note: This exclusion prohibits development of a resource node / settlement point for a distribution-connected resource. All market participants may participate in CRR markets, subject to meeting requirements defined in ERCOT Protocols

Exclusions / Rationale: Nodal Dispatch SENA supports an efficient dispatch of all resources. Resources that can monetize their locational value to alleviate constraints through a SCED dispatch should have the ability to do so. However, NPRR 777 was authored acknowledging the challenges associated with a nodal dispatch, including: The potential for registering as an MDR (for nodal payment) when nodal prices favor the resource, and de-registering as an MDR (for zonal payment) when nodal prices do not favor the resource. Incentives to create a mobile generation fleet.

Exclusions / Rationale: Ancillary Services NPRR 777, as written excludes MDRs from providing ancillary services. SENA is supportive of a competitive market structure where any resource can provide Ancillary Services, provided that they have the technical capabilities to provide that service. Existing market structures permit (and do not change by virtue of 777) opportunities for MDRs to provide certain Ancillary (or comparable services)

Exclusions / Rationale : Ancillary Services Non Spin (10/30 Min Response) ERS (10/30 Min Response) Responsive Reserve (10 min / Governor Response) Load Resource participation by high-set UF Relay Regulation No comparable product Protocol revisions need to include storage when deployment is commercial and material Regulation provided by Natural Gas and Diesel fired Resources would likely be uneconomic compared to other lower-cost alternatives.

Exclusions / Rationale: Day-Ahead Market: Market Participants may participate in the DAM, however no new settlement points will be created for each MDR. Load Zone dispatch and Payment allows each MDR to be perfectly hedged to the Load Zone, and can participate in DAM activities. Congestion Revenue Rights: Development of a Settlement Point for each MDR may burden existing infrastructure Load-zone dispatch of MDRs allows Market Participants to Hedge from the Load Zone to any existing point on the system, enabling a perfect hedge if desired. Load Zone payment also guarantees each MDR is perfectly hedged to the Load Zone, without procuring any CRR instrument.

Path Forward SENA proposes that WMS host monthly discussions to build consensus on the following topics: Settlement: Does the current MDR treatment as a resource align with current resource settlement practices? RUC: Does the current MDR treatment make a MDR eligible for RUC? Inclusion in transmission studies? Telemetry: Is telemetry adequate for ERCOT and achievable by MDRs? Performance Metrics: Are existing resource performance metrics appropriate and achievable for MDRs? Other?