JOHN J. CARROLL INSTITUTE ON CHURCH AND SOCIAL ISSUES

Slides:



Advertisements
Similar presentations
UPA Package 3, Module 2 SQUATTER RESETTLEMENT IN THE METROPOLITAN FRINGE: A CASE STUDY OF THE SAPANG PALAY RESETTLEMENT PROJECT IN.
Advertisements

Yolanda Recovery and Rehabilitation Plan Immediate Interventions 1 November 27, 2013.
Identifying Failing Septic Systems and Straight Pipe Discharges.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Denver Federal Center Calibration Silo Removal Project What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Project Financing & Meeting International Social & Environmental Standards in Africa John Miragliotta, Sustainability Pty Ltd
UNIT III BUILDING TYPES Syllabus: Residential, institutional, commercial and Industrial – Application of anthropometry and space standards-Inter relationships.
What is GMA Jobs Center? Greater Modular Access (GMA) Jobs Center is an information portal that aims to provide information on employment and livelihood.
What do urban problems refer to?
Independent Living Centers The Gateway to Community Living Resources.
Feedback and Improvement Bizarre Accident of the Week Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
BEYOND THE GREAT RECESSION: SAVING CITIES AND SCHOOLS South Central Assembly Summit June 13, 2012.
May 30, 2008 Community Integration Commission 1 DRPT Initiatives on Transportation Services For Older Adults, People With Disabilities.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
 Strategic Objective K.2: Integrate gender concerns and perspectives in policies and programmes for sustainable development.
Urban, Suburban & Rural. Urban People often define urban areas, or cities, as land occupied by buildings and other structures used for residences and.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
COMMUNITY MORTGAGE PROGRAM (CMP) Foundation for the Development of the Urban Poor FDUP August 17, 2005.
URBAN DEVELOPMENT PLANNING
AFGHANISTAN A view from the ground Presentation at the Conference of International Broadcast Audience Researchers, November 2003, by Independent Media.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Bathrooms & Kitchens Water, Grey Water & Waste-Water.
The position of EFFAT concerning seasonal work. Sectoral seasonal work Agriculture 6.8 Million workers –4 Million of them are seasonal workers Tourism.
South Sudan Emergency Response 2014 Robust Shelter Construction.
Diamond Island The Diamond Island By: Cheyenne & Alex Smith.
DevelopmentEconomics. Development Economics Poverty & Unemployment in LDCs Remedial Measures Manpower Planning Poverty & Unemployment in LDCs Remedial.
The Victoria-Taiama School Project In Taiama, Sierra Leone.
11/28/12 1 CALIFORNIA FOSTERING CONNECTIONS TO SUCCESS ACT Version 2.0 Assembly Bill 12.
Family and Medical Leave Act The law providing eligible employees who work for covered employers the right to job protected, unpaid leave for absences.
Urban WASH project in Philippines Project Two (Toilet, Water and Oresol) Tondo Slum (Manila), near Smokey Mountain Landfill. Budget: EUR (funded.
An Evaluation Of The Resettlement Program In The Philippines: The Case Of Towerville Resettlement Project A Country Report On New Town Development And.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
MORE OR LESS EQUAL? Maths slideshow B. MATHS 4 In-country gaps 2.
Transition Collaborators. Team Models Multidisciplinary Interdisciplinary Transdisciplinary.
The Cities A l l i a n c e A G LOBAL P ARTNERSHIP W ITH C ITIES TO M EET THE C HALLENGE OF P RO -P OOR P OLICIES AND P ROSPEROUS.
Enterprise Zones – Status & Local Incentives Discussion City of Woodburn March 8, 2010.
Involvement in Global Health as a Family Physician
Permanent Supportive Housing: When It Is Time to Move On?
PRE-SEPARATION COUNSELOR TRAINING: GENERAL MONEY MANAGEMENT & PERSONAL SAVINGS AND INVESTMENT Elements
Best Management Practices for Used Oil Collection Programs
Foundations of Technology Construction
CHILIMANZI PRIMARY SCHOOL
Find the one that’s right for you!
Self-Study Instrument for Early Childhood Centers EDITION
Montana Emergency Shelters Workshop
East Timor, 1.5 years on: environmental and occupational health. Impressions from working there with the NZDF and the Timorese health service.
Analysis and Calibration of Sewer Flow Tenant Type Factors
Involvement in Global Health as a Family Physician
Banner Project Update for Division Deans
HAB/NQC Cross-Part Collaborative An Overview
Emergency Preparedness
City:- Corporation of City of Panaji
Mortgage Information for Ontario, Canada
The Illinois Plumbing Licensing Law 225ILCS 320/35.5 and
Flood alert or flood warning?
Involuntary Resettlement 0P 4.12: Planning Instruments
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
What can the urban audit contribute?
Bridges: Supporting Ohio’s Young Adults Emancipating from Foster Care Chynna Kelly, Ohio Department of Job and Family Services Geoff Hollenbach, Child.
Sewer Infrastructure Watuppa Plantations Development
Division of Long-Term Services and Supports
Foundations of Technology Construction
Sacred Heart Church Owatonna, Minnesota
John & Jayne Doe: ESTONIA
BEYOND THE GREAT RECESSION: SAVING CITIES AND SCHOOLS
Terry Mason, HH Group Operations Director
Understanding the Replacement Reserve
Nam Theun 2 Public Consultation
MAPPING THE PATH TO COMPLETION
Presentation transcript:

JOHN J. CARROLL INSTITUTE ON CHURCH AND SOCIAL ISSUES MINIMUM STANDARDS FOR OFF-CITY RESETTLEMENT Urban Poor Alliance NCR General Assembly 30 June 2007 JOHN J. CARROLL INSTITUTE ON CHURCH AND SOCIAL ISSUES

SOCIAL PREPARATION General assemblies should be organized at the barangay level with representatives from concerned agencies (LGU, NHA, barangay) present Enough time should be given between the scheduled demolition/relocation and the consultation with families Ideal: 6 months preparation & during summer Options for livelihood & employment in & near the resettlement site should also be discussed Affected families must be represented in committees formed

SOCIAL PREPARATION Receiving LGUs should be included in the planning & initial stages of the resettlement process Sending LGUs should give financial support to families moving out of their jurisdiction “Trippings” should be continued

HOUSING & SITE DEVELOPMENT Ideal: ready-to-occupy housing unit (4 walls, roof, door, functioning toilet with septic tank) is available upon transfer Families must be allowed to stay in their place of origin if they will build their own houses; making people live in tents should be avoided Roads to & within the resettlement site must be passable Drainage must be functioning Solid waste/garbage in the site must be regularly collected

BASIC SERVICES: Water & Electricity Clear timeframe must be given to families to meet the requirements to have the service connected; this must be indicated in a MOA with service providers (Meralco, Manila Water/MWSS) Electricity connection should come first as most water connections need electricity to function (i.e., water pumps) It is preferred that the NHA includes this in their budget & should be included in the computation of the families’ monthly amortization

BASIC SERVICES: Water & Electricity It is suggested that 70% of the cost of having the electricity connected be shouldered by the developer Meralco posts with transformers should be installed & “ready for use” in the relocation sites Water should be potable

BASIC SERVICES: Education New school buildings/classrooms should have been built & ready to accommodate additional students from the relocated families at the time of relocation Aim for the ideal teacher-student ratio of 1: 40

BASIC SERVICES: Health One (1) health center for each relocation site with at least one (1) doctor, one (1) midwife, and trained health workers

BASIC SERVICES: Livelihood Plans for livelihood should be supported by corresponding budgets Livelihood programs must go beyond training & must be able to supply credit A livelihood credit facility, ready to be accessed by qualified families; rules for accessing the facility must be made known prior to relocation Tap & contact MFIs committed to extending credit to the poor