1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Overview of GRETINA I-Yang Lee Lawrence Berkeley National Laboratory GRETINA Auxiliary Detector Workshop Washington University January 2006.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
STEREO SWG May PLASTIC Status Report to the STEREO SWG 2 May 2005 Hamburg Planetarium UNH: A.B. Galvin (PI), E. Moebius (Lead CoI), L. Kistler, M.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
ELENA installation progress F. Butin / ELENA collaboration.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
GLAST Large Area Telescope:
SPP/FIELDS Quarterly UMN 27 September 2016
Chris Booth Sheffield 29th March 2006
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
SWEA sensor FM model work remaining before delivery
Bill Raynor Naval Research Lab
Wide-Field Imager for Solar PRobe Plus (WISPR)
GLAST Large Area Telescope:
SPF MAG Quarterly Report – Feb 2015
Brief Status SPS Prototype PSB Prototype Installed in LS1
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
LIU Wire Scanner Milestones June 2017
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Working plan for 2017 Acquisition and Control Electronics
Beam Pipe and Service Support Structure Production Progress
PHI Status Report SO Cleanliness Working Group #24
10/month is the present production rate 2 FTE + sporadic contributions
0.0 Instrument Suite Name Presenter’s name
Preparations for test of
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
GLAST Large Area Telescope
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
GLAST Large Area Telescope
Integration and Test Organization Chart
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
A Beam telescope for the EMC testbeam
Presentation transcript:

Dave McComas on behalf of the ISʘIS Team introduction SPP Science Working Group in D.C. at the Smithsonian

Outline ISʘIS Team Hardware Status Calibration Results Summary

ISʘIS Team

Hardware Status – EPI-Lo

EPI-Lo Status – FM Event Board Flight FPGA burned and installed Completed FM acceptance testing Ready for integration into the top assembly

EPI-Lo Status – FM Power Board Completed FM acceptance testing Removing excess parylene coating

EPI-Lo Status – Anode & Energy Bds Four FM Anode Boards complete, acceptance tested, and ready for next assembly Two FM Spare Anodes built Fifteen FM Energy Board / SSD Assemblies complete, acceptance tested, and ready for next assembly (8 FM and 7 FM Spare) EPI-Lo FM Anode Board, back side EPI-Lo FM Energy Boards, back side

EPI-Lo Status – FM Sensor Wedges 2 FM Spare Wedges Assembled and Calibrated at LBNL 3 FM Wedges Assembled and vacuum-tested with sources 11 upper wedge subassemblies complete 9 MCP assemblies complete and tested

EPI-Lo Calibration at LBNL Completed Calibration of 2 FM Spare Sensor Wedges at LBNL in March 2016

Hardware Status – EPI-Hi

EPI-Hi Status – Electronics Boards Ebox assembled with all FM boards LVPS, Bias Supply, DPU, LET1, LET2, and HET Boards All FM boards populated with FM parts (except FPGA) FM Flex-Circuits to Telescopes

EPI-Hi – FM Telescopes All FM Telescopes fabricated Minor mechanical updates incorporated into LET1 & LET2 and being completed on HET telescope bodies Progress made on improved screening to find detector wire-bonds issues (breakage on one extreme, sagging on the other) EMI closeout of cabling to telescopes is behind schedule but parts should be complete mid-October

EPI-Hi Team – TAMU Calibration Performed Calibration at Texas A&M Test Dates: June 14-18, 2016 K500 Cyclotron: N14, Ne20, Ar40 and Kr78 beams 56 hours beam time LET1 A, HET A and LET2 tested K150 Cyclotron: Proton beam 13 hours beam time HET A and LET1 A tested 14 ISʘIS team members supported the test at TAMU over a 13 day period. Many other involved with pre-test preparations. 24/7 coverage June 13-18

EPI-Hi Team – MSU Calibration Performed Calibration at Michigan State University Test Dates: July 19-21, 2016 K1200 Cyclotron S2 Vault – SEE line Ni58 beam, 160 MeV/nucleon 44 hours beam time LET1 A, LET1 B, HET A and LET2 tested 14 ISʘIS team members supported the test at MSU over an 8-day period Many others involved with pre-test preparations. 24/7 coverage July 19-21

Summary Almost all ISʘIS FM hardware is complete Integration and Testing has gone well Extensive calibrations performed on FM hardware to ensure performance requirements are met Full FM Integration and Testing expected to complete in October 2016 Pre Environmental Reviews being scheduled for October 2016 Projected delivery to spacecraft in January 2017