R.U.M.S. (Right of Way and Utilities Management System) Overview

Slides:



Advertisements
Similar presentations
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Advertisements

NetPay provides best and effective solution for company Managers to maintain their employee scheduling task (including staff in/out details, overtime,
Module 1: Introduction to SQL Server Reporting Services.
IDMS Conversion Certification Presentation 10/28/09 Project Certification Committee.
17th February, 2000 by Maciej Korzeniowski (CERN-IT-IA-MI) 1 Oracle Discoverer Product Presentation  This is an ad hoc query and analysis tool for.
ONE STOP THE TOTAL SERVICE SOLUTION FOR REMOTE DEVICE MANAGMENT.
OnContact CRM Customer Relationship Management. CRM 7 Benefits Rich "client" experience, completely web-based Access data anytime, anywhere. Ease of navigation.
SysLogix Inc. eProducerPortal.com by. Introduction "'Onboarding” - the process of contracting and appointing new agents. It is used to refer to the administrative.
Web Visualization Technology Horner APG Ver 1.0.
Managing Where’s My Stuff Why an enterprise-wide, inter-operable, geospatially-enabled Information Management System for Transportation Agency Right-of-Way.
Nu Project Management Office A web based tool to Manage Projects.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
© InLoox ® InLoox PM Web App product presentation The Online Project Software.
2010 Practice Management Annual Conference PCLaw® Office Efficiency Tools – Calendaring, Phone Call & Document Management Presented by: Deborah Schaefer.
Project Implementation for COSC 5050 Distributed Database Applications Lab1.
FreightSupplyChain Trinity Business Solutions Limited International Freight Consolidators March 2001 Trinity Business Solutions Limited International Freight.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
“This presentation is for informational purposes only and may not be incorporated into a contract or agreement.”
Time Matters ® A Practice Management, Client Relationship Management, and Document Management System Presented by Alana Seibert.
6/1/2001 Supplementing Aleph Reports Using The Crystal Reports Web Component Server Presented by Bob Gerrity Head.
AFISS, ◊ Tel: (519) ◊ ◊ ◊ Web: ◊
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Presentation on Facilities / Assets Management by Satyam Computers Services Ltd.
what is contacts? In-contacts is an online contacts database designed from the ground up to be compatible with modern business needs.
Miami International Airport’s Integrated Airport Management System
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Facilimanage Dynamics aka “Facilies” CS 499 Final Presentation Curtis McKay Manneet Singh Brad Vonder Haar.
MIS3300_Team8 Service Aron Allen Angela Chong Cameron Sutherland Edment Thai Nakyung Kim.
Who is ROH Incorporated? Founded in 1971 Service oriented company built on client “partnering” Florida State Contract # Provide advanced.
CHAPTER TEN AUTHORING.
6/1/2001 Supplementing Aleph Reports Using The Crystal Reports Web Component Server Presented by Bob Gerrity Head.
DPW Works Automated System to Improve Route Performance andEfficiency and Efficiency District of Columbia Solid Waste Management Administration.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Module 1: Overview of Microsoft Office SharePoint Server 2007.
Module 1: Introduction to Microsoft SQL Server Reporting Services
1 Intended use of this Presentation This presentation is for the client Executive contact to use with their internal Enterprise eTIME Project Team. The.
A brief introduction to the SIGNZ Billboard Management System
Architecture Review 10/11/2004
John Philbrick PE, CCP, PMP
Right of Way Data Management System (RWDMS)
InGenius Connector Enterprise Microsoft Dynamics CRM
Netscape Application Server
Project Center Use Cases
Facility Portal and Work Order Manager
Visio.
AMRDEC Test Facility Improvement Project
Visio.
MICROSOFT OUTLOOK and Outlook service Provider
Database Systems: Design, Implementation, and Management Tenth Edition
Appendix A: Guide to Using Microsoft Project 2002
OnContact CRM Customer Relationship Management
ICT Database Lesson 1 What is a Database?.
Migrating Oracle Forms Using Oracle Application Express
Database Management Systems
PSC Group, LLc Office 365/SharePoint Online Migration traps and tricks
InLoox PM Web App product presentation
CEOS DB API and Waveband Improvements
Weapons/Gear Accountability Utilizing Radio Waves (RFID)
Business Register Redesign Technology Strategy Plan
Enterprise Program Management Office
Chapter 17: Client/Server Computing
Final Design Authorization
Proteus Product Demo.
CAD DESK PRIMAVERA PRESENTATION.
Appendix A: Guide to Using Microsoft Project 2002
Web-Based Information Management Program
Sending data to EUROSTAT using STATEL and STADIUM web client
Project Certification Planning Phase August 27, 2014
Presentation transcript:

R.U.M.S. (Right of Way and Utilities Management System) Overview

Right of Way Functions Incorporated into RUMS Right-of-Way Management (appraisal, acquisition, improvement removal, relocation, legal, donation, grave relocation) Utility Management (design, easements, facility adjustments) Assignment Tracking (assignee, due and complete dates, units of production) Contract Management (contracts, task orders, subcontractors, assignment-based security) Property Management (sale, lease, property grouping, historical tracking)

Problems Faced Before RUMS Legacy System did not focus users on critical dates, allowing milestones to be missed without warning Inaccessibility of right-of-way data for management analysis Legacy System made searching and updating information difficult Legacy System did not collect all important information forcing users to enter such information in comments or not at all Correspondence formats used throughout the state were not standardized Completion of correspondence and internal documentation laborious

Accomplishments of RUMS Addresses needs at all levels - from data entry through management Emphasizes management focus on advertisement date and project status Organizes all important RW&U information Provides intuitive navigation for novice and advanced users (increased productivity) Eliminates redundant data entry in completing forms used internally and those used externally to communicate with citizens Enables inquiry users to access information through browser Contains extensive online help and tutorials to flatten learning curve

RUMS Project Development Steps As-Is / To-Be Analysis Early Prototype Design and Initial Data Model Full Prototype (Functional Version 0.5) Program Specs and Final Data Model Development and Testing Training (Just-in-time and repeatable) Conversion for Pilot Pilot (single district - 3 weeks) Conversion for state-wide implementation State-wide implementation Maintenance

Highlighting a RUMS Feature - Forms Processing Standardized forms (i.e., internal memoranda, external correspondence, etc.) for all RUMS users User presented with forms applicable to the screen currently being viewed in RUMS - eliminating the need to search through a myriad of unrelated forms Forms populated with information from the RUMS database - eliminating redundant data entry Forms can be modified with full power of Microsoft Word Forms can be updated remotely - user does not have to be in the RUMS application Completed forms stored in RUMS for viewing “Sandbox” concept allows new forms to be created without updates to RUMS software

Web Based Reporting Reports defined with Crystal Report Writer Reports executed on “Cizer” (third-party product) Web Server and viewable by users via the Web Browser Web server is a powerful machine, and has fast connection to database, allowing efficient execution of Crystal Reports Cizer allows scheduling of reports and can limit the number of simultaneous reports processing against the database Client is not locked while report is executing Needs of 500 inquiry users satisfied via Web

Technology Utilized Oracle 8i Visual Basic 6.0 Sheridan VB Extensions: Data Widgets, Active TreeView, Designer Widgets MS Word 2000 / VBA (with Word 97 compatibility) Mercury Testing Tools: TestDirector / LoadRunner / WinRunner Crystal Report Writer Cizer (Web Enabled Report Execution) ADABAS SQL Gateway (interface to other system)

Current Status / Enhancements User base broadening based on system success and understanding of capability Pursuing Web-enablement opportunity Flexible system architecture allowing system enhancements/expansions to be made (over 200) Software copyrighted has been obtained

Right of Way and Utilities Division Contacts C.L. “Les” Griggs, Jr. RUMS Project Manager Right of Way and Utilities Division VDOT Central Office (804) 786-2917 griggs_cl@vdot.state.va.us