Oil Pipeline Optimal Route

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

GIS APPLICATIONS IN SELECTION OF SOLID WASTE DISPOSAL SITES
Copyright, © Qiming Zhou GEOG3600. Geographical Information Systems GIS as Decision Support Tool.
Network Analyst Lecture 4. What is network? A network is a system of interconnected elements, such as edges (lines) and connecting junctions (points),
Raster Based GIS Analysis
19 th Advanced Summer School in Regional Science Combining Vectors and Rasters in ArcGIS.
Cost Path Analysis of Skid Trails Using GIS Laura Heath December 14, 2006 FOR 557.
Abstract The operation of today’s wastewater systems requires ongoing planning, maintenance, and management. Planning of these systems involves a thorough.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
UNIVERSITY OF NAIROBI DEPARTMENT OF GEOSPATIAL AND SPACE TECHNOLOGY FINAL PROJECT PRESENTATION 3 rd April 2014
Lecture 9 Managing a GIS project. GIS analysis Collect and process data to aid in decision making  Use the data to make decisions  Identify alternatives.
Goal — The BP Routing Collaboration tool is a web-based.NET application consisting of server-based GIS and modeling components that identify the least.
Spatial Analysis cont. Optimization Network Analysis, Routing.
Development of a Decision Aiding Framework For Energy Infrastructure Siting Ganesh Doluweera & Joule Bergerson Institute for Sustainable Energy, Environment.
CFR 250/590 Introduction to GIS © Phil Hurvitz, intro_overview.ppt Introduction-Overview Why use a GIS? What can a GIS do? How does a GIS work?
INTRODUCTION TO LAND-USE ISSUES. Land-use planning Seveso II provisions (Art. 12) in case of: New establishments Modifications to existing ones Developments.
2 nd International Conference Graz, October 10 th, 2012 SHARP PP 2: Region of Western Macedonia Fig. 1: Comparing different scenarios with the use of DSS.
DIGITAL ELEVATION MODELING GEOG 421: DR. SHUNFU HU, SIUE Project One Steve Klaas Fall 2013.
A Systems’ Approach to the Design of a Methodology and Mathematical Model for Determining the Most Critical Links of a Highway Network Gerard Ibarra PhD.
BY WASIKE L ARNOLD F19/1669/2009 APPLICATION OF GEOSPATIAL TECHNOLOGIES IN THE SELECTION OF A SUITABLE DAM SITE ON THE LOWER EWASO NYIRO RIVER.
{ Sammamish-Juanita 115 kV Project Route Siting Project November 2012 Gene Lohrmeyer GeoEngineers.
Spatial Analyst - Cost Distance Analysis Kevin M. Johnston.
Pairwise-Comparison was used as the ranking method which provided accurate weights in determining the ideal site for Niagara Region. Site Selection for.
By: Beependra Singh Manika Bindal. Introduction Study Area& Objective To provide an unbiased suitable sites for waste disposal in and out Ooty.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
GIS Site Suitability Analysis for developing a vineyard in Sonoma County, CA ____________________________ David Jaquet Raster GIS & Modeling ( )
1 Application of SDI in hydrology for assessment of hydropower potential of small streams Subija IZEIROSKI Bashkim IDRIZI Sotir PANOVSKI Igor NEDELKOVSKI.
LP – MUNICIPALITY OF PATRAS State of Implementation of project “Neighborhood Social Planning and Development” Acronym: ‘NEBSOC’ T. Roustanis Bari, 3-4/11/2014.
GIS M ETHODOLOGY Swearing Creek Watershed Restoration Plan 8/26/2015 Piedmont Triad Regional Council.
OPENGIS for Water Management OPENGIS for Water Management in Developing Countries JRC Activities on Water Knowledge Management In Developing Countries.
Transmission Line Siting Model (Hypothetical Example) Criteria – the transmission line route should… Goal – identify the best route for an electric transmission.
Mohammed Alzaaq MS GIS Program University of Redlands.
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
Graduate Students, CEE-6190
Water and people in a changing world
Julia Kintsch, ECO-resolutions Paige Singer, Rocky Mountain Wild
Vector Analysis Ming-Chun Lee.
Zachary Mondschein (‘17) ES212: GIS and Remote Sensing
Pubs of Dublin “ It would be a puzzle to find a route across Dublin
Emma Gildesgame, Katie Lebling and Ian McCullough
An Integrated Approach for Subsidence Monitoring and Sinkhole Formation in the Karst Terrain of Dougherty County, Georgia Matthew Cahalan1 and Adam Milewski1.
Raster Analysis Ming-Chun Lee.
Presented by Shaynee Gulliford
Members Cliff Walden- Manager Ty Wolosin- Assistant Manager
Arc Hydro for EPA Basins
Estimation of Runoff & nonpoint source pollution using GIS techniques
Draft Transportation Element September 6, 2017
December 14, 2017 Christine brittle, Ph.d.
Spatial Models and Modeling`
Spatial Analysis cont. Optimization Network Analysis, Routing
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
Instructor: Dr. Chunling Liu
Continuous Improvement Plan (CIP)
Hazards Planning and Risk Management Tsunami Inundation Mapping
Introduction to Geographic Information Science
Terrain Complexity using Fuzzy Introduction Suitability using MCE
use of GIS to assess groundwater recharge in the Texas High Plains
Nick Bonvoisin Secretary to the Convention on the
MSc Thesis - Presentation
URBAN STREAM REHABILITATION
GIS-based wind farm site selection using spatial multi-criteria analysis (SMCA): Evaluating the case for LA County The threat of global warming has caused.
Spatial Analysis cont. Optimization Network Analysis, Routing
Spatial Models and Modeling
References to Economic Instruments in Selected MEAs
Chapter 6 Network Flow Models.
Addressing the challenge of water scarcity and droughts
Introduction to Geographic Information Systems (GIS)
Spatial Analysis cont. Optimization Network Analysis, Routing
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
Prioritizing Watershed Protection in King County
Presentation transcript:

Oil Pipeline Optimal Route Turkana Oil wells to Isiolo Omondi, Steve Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Abstract This project demonstrate the use of GIS technique to generate an Optimal Oil Pipeline route from the oil promising Turkana region to Isiolo connecting with the LAPSET Oil Pipeline. The project aims to ensure the generated route has the highest utility to the public, in addition to minimizing harmful impacts to people and the natural environment. Inputs from the pipeline host areas were put through a relative preference of the various factors affecting the route (Weightings) ESRI’s ArcGIS spatial analyst tools were used for data analysis and interpretation Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Introduction Route selection is a critical first step in the process of pipeline design and construction and significantly impact the construction and operation of the pipelines. So, effective route selection process is very important for minimizing economic lose. GIS technologies are used effectively in siting oil pipelines corridors. With this study, in Turkana, Samburu, Isiolo counties various thematic layers such as land use, elevation, roads, rivers, water surfaces and protected areas were integrated in route selection using GIS techniques. Using ArcGIS Spatial Analyst module, costs surfaces were calculated and the undulating oil pipeline route was generated. Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Introduction cont. The themes and variables used as input in this process mainly address direct construction costs and pipeline efficiency once the pipeline has been completed. Some of the variables examined include; shortest distance from source to destination least grading (removal of trees, etc.) Costs associated with right of way slope of terrain Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Introduction cont. number of stream, road, and railroad crossings existing laws and regulations (wetlands, protected areas, etc.) proximity to population centers and towns etc. utilization of existing utility corridors and easements other engineering factors. Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Conceptual Model Geodatabase Pipeline.gdb Classify Weighting Overlay Source Land Use, Roads, Towns, Rivers, Protected areas, Water bodies, etc Land_Use Classes, Road_Proximity, Rivers_Proximity, Slope of Terrain, source and Destination, etc Generated datasets Thematic Layers Distance Surface Direction surface Least Cost path Algorithm Source point Distance Surface Direction Surface Destination Point Optimum Route Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Study Area The study area is selected between the source point of the pipeline i.e Turkna Oil Wells and destination i.e Isiolo covering three counties; Turkana, Samburu and Isiolo. Exhibits rel. flat terrain, low population & underdevelopment Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Methodology 1. Rasterization 2. Reclassification Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Methodology cont. 3. Weighting 4. Generation of the cost weighted raster Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

5. Least cost path generation Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Result Length: 326.576808 Km Road Crossing: 7 River Crossing: 3 Protected Area: 0 Water Body: 0 Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Recommendation This process should be taken further to include all the stakeholders in determination of influences of the existing policies. Data to be used ought o be well attributed and ground truthing be carried out for detailed analysis Policy makers in engineering projects should utilize GIS techniques a tool for efficient decision. Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Conclusion So far, GIS techniques have been successfully deployed in this oil pipeline sitting process. In this study, by incorporating both the environmental and traditional sets of criteria an optimal route could be achieved. Human, environmental and financial factors have been considered in generating this route. By further incorporating opinions of local community members in weight derivation/ranking the variables, we are able to get a realistic and reliable pipeline route which meets the needs of all concerned parties. Its demonstrated in this paper that, ArcGIS Spatial Analyst module can be used in the optimum route selection of pipeline process to minimize impacts to environmental and costly aspects during construction. Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve

Thank You Conducted & Presented @ ESRIEA in the period of January - March, 2014 by Omondi Steve