Naming convention and layout database for the East Area

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
1 Chapter 2 Copyright ©2006 Thomson South-Western, Mason, Ohio William A. Raabe, Gerald E. Whittenburg, & Debra L. Sanders Tax Research Methodology.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
(C) OHIM User survey on the media to be used for publication of the Community Trade Marks Bulletin Office for Harmonization in the Internal Market.
This chapter is extracted from Sommerville’s slides. Text book chapter
School and LEA Users
Type approval Data- base and vehicle registration in The Netherlands EReg Luxembourg, 12 May 2010 P.E.Th. Striekwold Manager Type Approval Department.
Training Session Product File Notes and Registration Reports, 23 October Registration Report: General aspects M. Trybou Federal Public Service of.
Survey of cathode deformations and further actions F. Vercellati – INFN-PV C. Montanari – CERN / INFN-PV weekly meeting, March 12,
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
Production Cycle Objectives:  Identifying key phases for building up website  Understanding the major goals and activities of each production process,
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Curriculum Forms Guidelines and Information Curriculum Proposals for publication in the Calendar, deadline is March 31, 2015.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
CAG EMEAI | Agilent Restricted | Page 1 Proof of Installation - Guide 24 th January, 2012.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
RATE CODES Central Maine Power Company. Introduction This is to provide Suppliers training on: n Establishing a new rate code prior to enrollment n Establishing.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
XML Exchange – the future of moving data. Purpose… Moving product data to Retail portal. Moving product data from one WERCS database to another Moving.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
ALS WorkManager Modeling Schema Course Outline Naming Convention for ALS Models Assembly Structure for ALS Models in WorkManager ALS Coordinate System.
 A content management system ( CMS ) is a system providing a collection of procedures used to manage work flow in a collaborative environment. These.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Radiation Protection computing tools Gérald Dumont HSE/RP.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Seite 1 WP1 Organisation and Management Management Group Meeting, Halle 18 March 2014.
1 Documentation Workflow Proposal By Michael Wheatland LibreOffice Documentation Team
Electrial Safety LS2 days November 2016 AP
Offline software - Introduction
East Area Renovation Project Team meeting # 2 – EDMS News
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Configuration Management and Layout Database ELENA Project
WP8 – Improvement and equipment of irradiation beam lines
Engineering Technology Division
East Hall under construction
Figure 2. from INTERACTION CROSS SECTIONS AND SURVIVAL RATES FOR PROPOSED SOLAR SYSTEM MEMBER PLANET NINE null 2016 APJL 823 L3 doi: / /823/1/L3.
Curriculum Forms Guidelines and Information
ETS Working Group, 5-6th June 2012
دانشگاه شهیدرجایی تهران
WP1 Vidyo Meeting 16 October 2018
تعهدات مشتری در کنوانسیون بیع بین المللی
Update on Reporting Information point 10
Welcome to Facility and School Registry (FSR) Presentation
Honeywell Safety Products Pricing Portal Customer Guide
Mail Merge.
Curriculum Forms Guidelines and Information
Experimental Areas – LS2 planning
Draft Guidelines for application of the Unique Identifier (UI)
S.A.M.P.L.E. Small Area Methods for Poverty and Living condition Estimates Siena, Sample 6 October 2010 Some results from the survey on local stakeholders.
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
EA Deliverable Equipment for East Area Renovation
East Hall under construction
East Area Renovation Supply of control rooms b.157
Safety in the East Area Renovation Project
Instructions for filling out the Learning Agreement
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Federal Work Study Hiring Steps
Presentation transcript:

Naming convention and layout database for the East Area East Hall under construction - 1962 Erwan Harrouch/ EN-EA, 23-09-2016

Current situation in the East Area Naming convention proposals Presentation outline Current situation in the East Area Naming convention proposals What’s next? 23/09/2016 Erwan Harrouch EN-EA

Current situation Beamline components named after their role in the beam optics Beamline components with identical names on several beamlines, different types of equipment with the same name… 23/09/2016 Erwan Harrouch EN-EA

Naming convention : Proposal 1 Proposal 1 : East area naming convention based on the model of the North area V . Position code Equipment code X 6 4 1 C S Equipment code (Slide 6): S the first letter indicates the system to which the equipment belongs and must be chosen from to the list of systems. F the second letter defines the family of the equipment within a given system. TT the last two letters defines the type within a family, the model for a given type and lastly the variant. Position code : The 3 first identify the beamline concerned (Slide 7). The 2 next digits give the position in meters from the first equipment of the section. The last digit is used to differentiate equipment when they are located in the same position. 23/09/2016 Erwan Harrouch EN-EA

Naming convention : Proposal 2 Proposal 2 : East area naming convention based on the model of the PS. . Position code Equipment code Beamline prefix 8 T X C S V 1 Beamline prefix : The beamline prefix indicate on which beamline the equipment is located (Slide 7). Equipment code : S the first letter indicates the system to which the equipment belongs and must be chosen from to the list of systems given in (Slide 6). F the second letter defines the family of the equipment within a given system. TT the last two letters defines the type within a family, the model for a given type and lastly the variant. Position code : The 2 first digits locate the equipment from the origin of the beam line in meters, the last digits is used in case two beamline components are located in the same position 23/09/2016 Erwan Harrouch EN-EA

Equipment codes : Example Available on the Naming portal 23/09/2016 Erwan Harrouch EN-EA

Naming convention : Positioning Positioning of the equipment : Targets Ex: XCSV.640010 T08.XCSV.100 PS F61610… T08620… T09630… T10640… T11650… BHZ PS   BHZ BHZ Line Proposal 1 Position code (3 first digits) Proposal 2 Beamline prefix Origin of the line F61 610 BHZ (PS) T8 620 T08 BHZ T9 630 T09 T10 640 Target T10 T11 T11 650 23/09/2016 Erwan Harrouch EN-EA

What is next? The equipment code should be provided by its owner. Please provide all your equipment code relevant to the new beamlines so they will be validated by the CERN naming service and the project coordination The naming convention document will be sent for circulation in the coming weeks. Once the naming convention, your equipment code and the beatch files will be approved the first version of the beamlines layout will be published. All the beamline components will be stored in the CERN layout database to centralize all the information on the equipment. CERN Layout database 23/09/2016 Erwan Harrouch EN-EA

THANKS FOR YOUR ATTENTION ! QUESTIONS ? 23/09/2016 Erwan Harrouch EN-EA