Six Sigma DMAIC Improvement Story

Slides:



Advertisements
Similar presentations
P D S A REVIEW ACT PLAN STUDY DO Plan Continuous Improvement
Advertisements

Lean Six Sigma Green Belt Training
Project Storyboard Template
Project Change Management
Project quality management Cody Ronning 3/23/2015.
Tumolo’s Toolbox 7 Step Improvement Process.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Monitoring Accommodations in South Dakota Linda Turner Special Education Programs.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
QUALITY These slides have been added to the standard MRU PM Cert materials and are made available to students who have attended my class. Robin Hornby.
CMMI Technology Conference and User Group November 2003 Experiences with Leveraging Six Sigma to Implement CMMI Levels 4 and 5 Jeff Facemire & Hortensia.
Project Objective: To Reduce Number and Cost of Public Works & Waste Management Heavy Fleet Repairs Project Objective: To Reduce Number and Cost of Public.
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Team: Right on Time! Updated April 14, 2015
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Define Tollgate Checklist
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: Team: Allison Duffy (Co-Team Leader) Joseph M. Sabater (Co-Team Leader) Jennifer Hill Asheley Hepburn Green Belt Project Objective:
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Green Belt Project Objective: To Improve Workplace Security Green Belt Project Objective: To Improve Workplace Security Six Sigma DMAIC Improvement Story.
ASK MBSAQIP Agenda ASK MBSAQIP November 10, 2016 Time (CST)
TM 720: Statistical Process Control DMAIC Problem Solving

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Florida Department of Health in Seminole County Quality Improvement DMAIC Project 2016: Increasing Timeliness of CSR Entries into HMS Project Team: Crystal.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
2016 Year-End Performance Management
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Business – IT Alignment
TechStambha PMP Certification Training
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Title: Owner: Ver: Date:
Quality Management Six Sigma
Framework for Success: DMAIC
Six Sigma Green Belt Training
Improving Form 462 Collection Process
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Explanation to Participants about this template and final presentation
CIS12-3 IT Project Management
Early Childhood Transition APR Indicators and National Trends
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
Six Sigma DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
by Operational Excellence Consulting LLC
Managing Project Work, Scope, Schedules, and Cost
Introduction to Lean and Lean Training
Miami-Dade Water & Sewer
Lean-Green belt six sigma program
Six Sigma DMAIC Process
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Six Sigma DMAIC Improvement Story Green Belt Project Objective: Reduce Construction Project Variances 2 Team: John Frank (Co-Team Ldr) Allison Macdonald (Co-Team Ldr) Matt Hammond Matt Beard Kenney Cooper (Polk County) Howard Tipton (Sponsor) CPS

Team used the 5-Step DMAIC problem solving process Lean Six Sigma Problem Solving Process 2 Define Select Problem Identify Project Charter Develop Project Timeline Establish Method to Monitor Team Progress Construct Process Flow Chart Develop Data Collection Plan Display Indicator Performance “Gap” Measure Stratify Problem (i.e. “Gap”) Identify Problem Statement Analyze Identify Potential Root Causes(s) Verify Root Cause(s) Improve Identify and Select Improvement(s) Identify Barriers and Aids Develop and Implement Improvement Plan Confirm Improvement Results Control Standardize Improvements within Operations Implement Process Control System (PCS) Document Lessons Learned Identify Future Plans Team used the 5-Step DMAIC problem solving process The team utilized the 5-Step DMAIC problem solving process.

Select Problem 3 The Green Belt Class brainstormed many possible projects and multi-voted them down to nine (9) for evaluation. The above project was selected with the initial emphasis on “Reducing Construction Project Variances”. Define Measure Analyze Improve Control

Project Alignment to Strategy 4 Define Measure Analyze Improve Control

Develop Project Charter 5 The team developed a team Project Charter Define Measure Analyze Improve Control

Develop Project Timeline 6 The team developed a timeline plan to complete the Project Define Measure Analyze Improve Control

Monitor Team Progress 7 Team identified an indicator; Flowchart, Spreadsheet; SIPOC, Cust Requirements matrix Paretos, Histograms Single Case Bore; Fishbone ; RC Verification Matrix Countermeasures Matrix; Barriers and Aids; Action Plan The Team and Management used a Checklist to monitor team progress. Line Graph Process Flowchart; Process Control Chart Lessons Learned Define Measure Analyze Improve Control

Review Process Flow Chart 8 The team constructed a Process flow chart describing the Process. The team next looked closer how to capture indicator data. Double-Click on MS Visio Object to develop process map Define Measure Analyze Improve Control

Cost of Poor Quality of Unwanted Project Variances 9 1. Direct Costs a. Actual Dollars above Planned Project Costs for 2012-2015 Projects that were over ………………………………………………………………. $1.8 M Note: This does not include all indirect additional costs of re-works (i.e., labor, equipment and materials added when the project work activity does not meet specifications causing re-inspections) 2. Management and Staff Costs a. Cost of project delays: consultant costs, project manager time, purchasing department time, department manager time, etc. (30 days late x $3,000/day x 14 Projects w/ Overruns)………………………….. $1.26 M The team identified costs related to Unwanted Project Variances. Total Hidden Costs were estimated between $1.8M and $3.06M over the 4-year period analyzed. Define Measure Analyze Improve Control

The team developed a spreadsheet to analyze the construction projects. Identify Data Collection Needs 10 The team developed a spreadsheet to analyze the construction projects. Construction Project Status Summary Define Measure Analyze Improve Control

Review Selected Indicator 11 GOOD Average = 7% The team collected Q1 indicator data and reviewed performance trends: The team next looked closer at the Gap. GAP Target = 0% Define Measure Analyze Improve Control

11 (42%) projects had variances of 5% or more Stratify the Problem 12 The team stratified the 26 projects many ways and found… 11 (42%) projects had variances of 5% or more The team looked closer at these 11 projects. Define Measure Analyze Improve Control

6 Projects Exceeded $30k variance totaling $1.7 million in overruns. Stratify the Problem 13 The team stratified the 11 projects > 5% variance many ways and found… 6 Projects Exceeded $30k variance totaling $1.7 million in overruns. Problem Statement: “6 Projects completed during FY 2012 to December 2015 had a Project Award variance over 5% and total Variance Dollars over $30,000.” Define Measure Analyze Improve Control

Identify Potential Root Causes 14 The team reviewed the 6 projects before conducting Single Case Bore Analysis. Single Case Bore Analysis A The team next looked closer at these 3 factors. C B Define Measure Analyze Improve Control

Identify Potential Root Causes 15 The team completed Cause and Effect Analysis and found… The team next looked to verify these 4 Potential Root Causes Define Measure Analyze Improve Control

Verify Root Causes 16 The team collected data to verify the root causes and found…. Root Cause Verification Matrix …all potential root causes were validated. Define Measure Analyze Improve Control

Identify and Select Countermeasures 17 The team brainstormed many countermeasures and narrowed them down to these for evaluation: Countermeasures Matrix Problem Statement Verified Root Causes Countermeasures Legend: 3=Moderately 5=Extremely 2=Somewhat 4=Very 1=Little or None Ratings Effectiveness Feasibility Overall Take Action? Yes/No “6 Projects completed during FY 2012 to December 2015 had a Project Award variance over 5% and total Variance dollars over $30,000.” A- Policy for vetting and approving optional /added project value improvements is inconsistently applied among depts A1/D1- Create Standard Process for "Vetting" proposed field changes during construction 4 16 Y B- Current field data acquisition procedures are not adequately designed to identify most all conditions B1- Establish "Best Practice" field data acquisition procedures and decision support tools C- Poor standards to identify & involve all appropriate stakeholders C1- 3D Construction Plan Version for better understanding to residents and stakeholders 3 2 6 N C2- Create Online Plans of project and make available to residents for comments 12 C3- Develop Procedure and Decision Support tool(s) to Identify and then follow-up with project affected stakeholders D- No consistent policy for allowing changes after design review finalized See above A1 Score 3 countermeasures were identified for implementation. Define Measure Analyze Improve Control

Identify Barriers and Aids 18 The team performed Barriers and Aids analysis on the selected Countermeasures. The team next incorporated this analysis into the team’s Action Plan. Define Measure Analyze Improve Control

Develop and Implement Action Plan 19 The team implemented an Action Plan for the team’s Countermeasures. Define Measure Analyze Improve Control

Countermeasure A1/D1- Create Process for ‘Vetting’ Project Changes 20 The team created a Project Variance Review and Approval Form. Define Measure Analyze Improve Control

Countermeasure B1-C3 Identify Data Acquisition/ Stakeholders 21 The team developed a Pre-Design Worksheet intended to assist staff to identify all potential stakeholders and factors that may affect the project design and construction. Define Measure Analyze Improve Control

Review Results 22 The team collected indicator data and reviewed results of it’s countermeasures GOOD Counter measures to be implemented Spring 2016 Next chapter in the story Define Measure Analyze Improve Control

Standardize Countermeasures 23 The team: Revised indicators and incorporated the improvements into the Process flowchart. Looked to standardize the Indicator monitoring Define Measure Analyze Improve Control

Standardize Countermeasures 24 The team Developed a Process Control System (PCS) to monitor the process on-going. Define Measure Analyze Improve Control

Lessons Learned 25 Project performance data at SLC is inconsistent and scattered. Project management procedures are inconsistent across departments. Paretos and Histograms were effective tools to stratify the project information and lead the team to the project variance root causes. Project data needed to be reviewed to ensure accuracy of the information before analysis. Root causes of all problems are either “Current standards that failed” or “People failed the current standards”. Define Measure Analyze Improve Control

Thank You! Next Steps Implement countermeasures 26 Implement countermeasures Monitor the performance results. Thank You! Define Measure Analyze Improve Control