Cottonwood Recycled Water Pipeline (West)

Slides:



Advertisements
Similar presentations
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Advertisements

With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
ALDINEISD How to Do Business with Aldine ISD. ALDINEISD If you desire an opportunity to do business with Aldine ISD, you must first register in the district’s.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Amended IGA/JPA Agreements CBI Grant Cochise County Board of Supervisors August 28, 2012.
Clean Water State Revolving Fund (CWSRF) Engineering Planning Grant Program.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
PORT OF TACOMA. Authorization for 3 actions: 1. Purchase acres at 1300 Taylor Way in the amount of $2,930,000; and, 2. Execute Agreement with City.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Jill E. Watkins.
Transportation Enhancements/Alternatives Design Assistance Program
Phase II Financial Review Guidance
TVRWRF 23 MGD Expansion Disinfection System Conversion
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Construction Oversight
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
District-Wide Well Maintenance, Rehabilitation, and Repair
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
SJVRWRF Dewatering Building Corrosion Remediation
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Sustainable Groundwater Management Act
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
Department of Community Development
Designers’ Manual Appendix Contents
Administrator of Construction Todd Wilson Senior Project Manager
GHANA NATIONAL PETROLEUM CORPORATION OECD 10TH PLENARY SESSION
Student Transportation Services
David Salazar, Chief Facilities Executive
ApprenticeshipNC Regional Collaboration and Expansion Project
Delta Water Supply Project
RGFSCIII Procurement Request Lead Times
APPENDIX 4 Processing Land Use Permit Requests for Change of Limited Access Control (Changes typically involve shifting, moving or breaking right-of-way.
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Ward Park Restroom Timeline
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Cottonwood Recycled Water Pipeline (West) Marc Serna, P.E. August 24, 2017

Overview of Cottonwood Project

Benefits The proposed project will expand the Recycled Water distribution system to offset up to 59 acre-feet per year of existing use of potable water by the following developments: The Cove Development – The Cove Park Mayfield Development Track 32155 – Tamarisk Park Track 30828 – Terrrazzo Park

Construction Bids Advertised Plans and Specifications on June 28, 2017 Open Bids July 26, 2017 District received 12 bid packages Lowest responsive bid received from Hemet Manufacturing Company dba Genesis Construction in the amount of $786,800 Engineers estimate was $1,521,000

Engineering Support Services Michael Baker International $58,040 Submittal Review Request for Information Review Record Drawings Surveying Services RMA Consulting $42,610 Geotechnical Testing

Funding State Water Resources Control Board (SWRCB) Division of Financial Assistance Awarded 35 percent grant funding Agreement signed July 2017 Project construction will commence upon issuance of NTP

Schedule Board Award September 2017 Construction Commencement September 2017 Construction Duration 180 calendar days

Recommendation Approve and authorize the following: 1. Execution by the General Manager of the District's standard form of contract with the lowest responsive bidder, Hemet Manufacturing Company dba Genesis Construction, in the amount of $786,800; 2. Rejection of all other bids received under Specification No. 1306P; 3. Administrative award and execution by the General Manager of the District’s standard form of contracts with the necessary consultants and suppliers for engineering support during construction; and 4. Additional appropriation of $1,211,000, which brings the total estimated project cost to $1,306,600.

Contact Information Marc Serna, P.E. Director of Engineering (951) 928-3777 Ext. 4461 Email: sernam@emwd.org