Area of Expertise Marketing` Sales Branding Supply Chain Management Maintenance Quality control Health and safety Production Planning Store Human.

Slides:



Advertisements
Similar presentations
The total cost of ownership
Advertisements

Poka Yoke & Mistake Proofing
Ramanan S. Tiruvannamalai
TOTAL PRODUCTIVE MAINTENANCE
Lean Systems and Six Sigma Quality
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
SSI Sustainable Solutions International, LLC Developers of SPM ™ Preparing the Workplace for the 21 st Century! the 21 st Century! Preparing the Workplace.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
TO LEARN ABOUT OUR “CONSORTIUM OF LEAN ORGANIZATIONS” Click Here.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
OFFICE MODERNIZATION – Toward lean and efficient administration Presented by: Edly Ferdin Ramly.
April 10–12, 2006 Hyatt Regency Atlanta Atlanta, GA NCMA World Congress 2006 : Achieving High Performance in Global Business: Leadership, Outsourcing,
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Driving and Sustaining Quality & Innovation in Manufacturing Processes Thursday, January 19, 20121Quality Presentation - EFY.
Assurance Case Approach TECNALIA Inspiring Business Novara November, 2013 TRIAL WS.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
Lean Thinking and Just-in-Time Systems
NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June Work streams –New patient referral –Re-referral –Depot MDT teams -
Japan International Cooperation Agency
No 1 Mr Ram Mohan & Dr Sarita Nagpal Presentation to PMMAI 25 th July 2014 CII’s New Manufacturing Sector initiative.
2 Purpose, Content and Value The Purpose of the MLC Library is to provide members with lean training material and recommended knowledge resources for.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Lean Production.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
AAA Arizona GB training Curriculum Modification Reviewed other Client’s 3/3/4 curriculum Considered AAA Arizona project needs –Sequence of modules –Need.
The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 1 SimLern ® Frank D. GeislerMobile: Alte Toesstalstrasse 50Fax:
Total Productive Maintenance
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
Implementing Lean Accounting Making it happen © BMA Inc All rights reserved.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
Operations Management JIT & Lean Systems
IENG 451 / 452 Stability: Visual Management and 5S
Training Within Industry (TWI)
An-Najah National University
Lean Manufacturing Competitive Scheme Under
Business Management Jai Maaruthi Consultaant Chennai & Singapore
Lean Manufacturing Series
Why are Starbucks so successful?
Enterprise / Production System Interface Expand Internally/Externally
IENG 451 / 452 Jidoka: Reliability, Quality, Poke Yoke
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
IAQ Symposium – 2nd IAQ World Quality Forum Kaizen System Implementation Balázs Németh, PhD
Introduction to Lean Emily Varnado.
Kaizen Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka
Welcome to my presentation
COBIT5 Foundation Training Supreme of IT Security Governance
Just-In-Time and Lean Production
IENG 451 / 452 MUDA (Waste): Waste’s Impact on Systems
Lean and Quality Management Kaizen and lean
Dawn Hill CSCP, CPIM, CQE, CLSSMBB
Just-In-Time and Lean Production
Japanese Production Methods
Lean Methodology and Building Blocks Kaizen Methodology The 5 Whys
"Introduction To Japanese
Mistake Proofing & Poka-yoke
វិទ្យាស្ថានខ្មែរជំនាន់ថ្មីInstitute of New Khmer
1 LEAN Safety. 2 Lean safety is a systematic approach to identifying and controlling the waste in processes/activities which could cause accidents or.
Production Preparation Process (3P)
Implementation of Lean at Rheem Manufacturing
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Area of Expertise Marketing` Sales Branding Supply Chain Management Maintenance Quality control Health and safety Production Planning Store Human Resource Project Management Data Analysis Performance Management System Design and Development Cost / Profit Analysis Cost Management Training

Tool Used ISO Consultation Lean Practice 7 QC Tool 5 S Kaizen Kanban Hoshin Kinery Jidoka Automation SWOT SQC / SPC Value Stream Mapping Spaghetti Diagram Bottleneck Analysis KPI / KRA GEMBA Poka-yoke Standard work JIT Visual Factory Haigunka TPM SMED Tool Used

Result You can Expect Improved Sales, Profit & Brand Image Reduce Machine down time Target Oriented work Planned work Systematic work with Minimal involvement of Top Management Reduced Down time Easy to train staff with systematic work Reduced cost Optimised Resources Easy Reporting System Analysis based Decision Better culture Quick ReponseTeam Improved Efficiency, Effectiveness, Productivity Scheduled work System for Easy to Train People Reduced inventory Proactive System instead of Reactive

10 Step Approach for Assured Result Gap analysis Identification of Existing system Deficiency report preparation Proposed Future system and Approval Preparation for Implementation Kick off meeting Routine implementation verification of the expectation Modification in system if required Execution of strategy and verification of the expectation