CONDUCT FACILITY ASSESSMENTS

Slides:



Advertisements
Similar presentations
Manage the Facility Condition Index (FCI)
Advertisements

BSBIMN501A QUEENSLAND INTERNATIONAL BUSINESS ACADEMY.
FY02 ASA Presentation Provide Scientific Equipment Services Presented by: Johnny Robbins (Team Leader) Team Members: Annalie Burke John Baron John Olguin.
Provide Facility Management and Maintenance Services 1 FY02 ASA Presentation Provide Facility Management and Maintenance Services Presented by: Kelvin.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
1 FY02 ASA Presentation Fire Prevention Section, EMB, DPS Presented by: J.P. McCabe, P.E. Samuel A. Denny, P.E. Robert C. Beller, P.E. Office of Research.
Data Analysis and Graphing Office of Quality Management Office of Research Services National Institutes of Health July 2002.
Please put the title here
1 CONDUCT FACILITY ASSESSMENTS Customer Value Proposition Leverage our expertise and background in NIH scientific infrastructure needs by providing state.
1 FY04 ORS Performance Management Manage Information Technology Team Members: Charlie Jones, Ben Ashtiani, Denny Bermudez, La'Tanya Burton, Ron Edwards,
1 FY02 ASA Presentation Provide NIH Events Management Services Presented by: Ken Ryland Marianne Bachmann Office of Research Services National Institutes.
1 FY02 ASA Presentation Provide Administrative Support (2) Presented by: Genia Bohrer Office of Research Services National Institutes of Health 18 November.
2014 AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
Implementing School Plans in ePlan
ORF 1 Performance Management Presentation List your Service Group Team Members: List Leader and Members ORS National Institutes of Health Date.
2014 AIA Jacksonville Design Awards ( Un-Built-General Category) Instructions Slide Upon downloading file from your please save file as submittal.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
IPDF toolkit – brought to you by PwC How to use this Interactive PDF (iPDF) template This template is part of a self-service iPDF toolkit. Use this to.
FY02 ASA Presentation Provide Workplace Safety Presented by: Deborah E. Wilson, DrPH, SM, CBSP Occupational Safety & Health Branch Division of Safety,
In this activity you will design and carry out your own controlled experiment to investigate your query. Design your own experiment for your investigations.
IBM Software Group ® Process workflows for the application portfolio management workspace.
Principal Investigator ESTCP Selection Meeting
Information Systems Project Management
Please put the title here
Please put the title here
The poster title goes here and here
Names of Project Lead and Audit Team
AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide
Application Outsourcing: Achieving Success & Avoiding Risk
FY02 ASA Presentation Provide Library Services
Principal Investigator ESTCP Selection Meeting
Performance Management Presentation
FY02 ASA Presentation Operate Emergency Communication Center
EPICS Design Review Template Notes:
Provide NIH Events Management FY 2004 Performance Management Report
Conducting the performance appraisal
Please put the title here
Conducting the performance appraisal
How To Use PowerPoint A Brief Introduction to Commonly Used Features
The poster title goes here and here
Poster Template for a 1189mm x 841mm poster presentation
THE GREATEST RESEARCH PROJECT EVER
SchoolFront - Notifications Training
Classified Evaluation System
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Please put the title here
OPTIONAL LOGO HERE Professional Template for a 36 inch high x 48 inch wide Poster Presentation Your name and the names of the people who have contributed.
Professional Template for a 40x32 poster presentation
Performance Measurement in Decentralized Organizations
Copywrite Digital Printers
Please do not change the heading of these slides
Professional Template for a 100cm x 100cm poster presentation
Project Management Process Groups
Copywrite Digital Printers
Copywrite Digital Printers
How to Use the Story Board Layout
The poster title goes here and here
National Food Service Management Institute
The poster title goes here and here
Poster Template for a 1189mm x 841mm poster presentation
How to Use the Story Board Layout
Classified Evaluation System
Principal Investigator ESTCP Selection Meeting
Hands-On: FSA Assessments For Foreign Schools
The poster title goes here and here
UNITED MAINTENANCE AND CONTRACTING COMPANY Business Process Reengineering Human Resources Key Performance Indicators The Input area of the Beam.
The poster title goes here and here
Principal Investigator ESTCP Selection Meeting
The poster title goes here and here
The poster title goes here and here
Presentation transcript:

CONDUCT FACILITY ASSESSMENTS Presented by: Ed Bain November 18, 2002 Here is an ASA Presentation file to help you prepare your presentation for the Performance Management Conference to be held at the Natcher Conference Center on 18 November. OQM must receive your final PowerPoint presentation file by Monday, 11 November. Please email this file to kaplanc@ors.od.nih.gov. Note that this template provides guidance and that you should not limit your report/presentation to the examples provided in it. Copy this file to your computer and name it for your ASA. Realize you are currently in the Notes Page View, where you will find advice on how to put together your ASA Presentation. To view your slides as they will appear in Power Point, click on View and select Normal. To return to the this view, click on View and select Notes Page. Customer Value Proposition Leverage our expertise and background in NIH scientific infrastructure needs by providing state of the art facility assessments to contribute towards NIH's goal of exceeding industry facility standards.

Table of Contents Main Presentation ASA Template, Page 1…..…………………….……………………………………… 4 Customer Perspective……………………….……………………………………. 5 Customer Performance Objectives………….…………………………….. 6 Customer Segmentation …………………….…………………………….. 7 Customer Satisfaction……………………….……………………………… 8 Customer Measure, Increase Safety and Functionality……………. 9 Internal Business Process Perspective………………………………………… 10 Internal Business Process Performance Objectives…………………… 11 Service Group Block Diagram……………………………………………. 12 Conclusions from Discrete Services Deployment Flowcharts……… 13 Internal Business Process Measure, Improve Cycle Time…………… 14 Internal Business Process Measure, Improve FCI………..…………… 15 Learning and Growth Perspective……………………………………………….. 16 Learning and Growth Performance Objectives…………………………. 17 Conclusions from Turnover, Sick Leave, Awards, EEO/ER/ADR Data 18 Analysis of Readiness Index Conclusions………………………………. 19 Learning and Growth Measure, Train Customers to use Software….. 20 This Table of Contents lays out a recommended structure for your ASA presentation. Notice this page describes the Main Presentation. Keep in mind that you have 30 minutes for the presentation, including questions from the audience.

Table of Contents Main Presentation Financial Perspective………………………………………………………… 21 Financial Performance Objectives…………….……………………………. 22 Unit Cost………………………………………………………………………… 23 Asset Utilization……………………………………………………………….. 24 Financial Measure, Improve Building Deficiency Cost Data…………… 25 Conclusions and Recommendations…………………………………………….. 26 Improvements Implemented………………………………………………… 27 Conclusions from FY02 ASA..……………………………………………… 28 Recommendations…………………………………………………………… 29 Appendices……………………………………………………………………………… 30 Page 2 of ASA Template………………………………………………………………. 31 Process maps…………………………………………………………………………… 32 Notice this page describes the slides that should be included in your Appendices.

ASA Template – Page 1 Replace the template shown here with page 1 of your ASA template. To copy an Excel chart, diagram, graph, Visio chart, or MS Word narrative into PowerPoint: 1. Copy selected chart/diagram/graph/ text in Excel/Visio/Word 2. In PowerPoint, insert a new slide on which to paste your chart/diagram/graph. Note when selecting a new slide on which to paste a graphic, you will want to select the slide type that only has a text box for a title, and the rest of the slide is blank. To insert a slide, choose “Insert”, then “New Slide” from the menu, select the type of slide to insert, and then click “OK”. 3. Once you have positioned your cursor onto the new blank slide on which you want to import your graphic, choose “Edit” and then “Paste Special” from the menu. By using “Paste Special” instead of just paste, you will help to keep the size of your file manageable. Resize the copied object if necessary. Resizing the chart or graph in Excel first may give you better results. You may want to try it both ways. In your presentation, please emphasize the value proposition and the service group strategy. Have your customers had a chance to discuss with you the the VP? What elements of the value proposition were assessed in the ASA?

Customer Perspective Transition Slide for your Customer Perspective data and findings.

Customer Performance Objectives Increase understanding of customer base Increase customer satisfaction Increase safety and functionality

Customer Objective Objective: Increase Understanding of Customer Base Performance Measure: Customer Segmentation Insert bullet statements summarizing your findings from your customer segmentation graphs, or insert the actual graphs if you desire. If you have more than one graph, you will need to add additional blank slides to your presentation, and import your graphics to those slides. To insert a slide, choose “Insert”, then “New Slide” from the menu, select the type of slide to insert, and then click “OK”. Refer to page 4 of this presentation for directions on how to insert charts/diagrams/graphs from other programs into PowerPoint. Ideas for summarizing your Customer Segmentation Data: Which segments are your primary customers? Which NIH customers are not currently your customers? Why? If you have multiple year data, how has your customer base changed over time? What does the information show about who you are and are not serving? What does this mean for your service area? Have you chosen growth as your service strategy? If so, how is this reflected in your chart (i.e., which segments will you target for growth)?

Customer Objective Objective: Increase Customer Satisfaction Performance Measure: Customer Survey for Facility Assessments Customers will be surveyed electronically using the ORS scorecards. Only facility assessment report recipients will be surveyed Insert bullet statements summarizing your findings from your customer satisfaction graphs, or insert the actual graphs if you desire. If inserting your radar charts or scatter diagram, refer to page 4 of this presentation for directions on how to insert charts/diagrams/graphs from other programs into PowerPoint. Ideas for summarizing your Customer Satisfaction Data: Which ratings are highest? Which are lowest? Why? How do the ratings compare to the data collected in the internal business perspective? For example, if the average satisfaction with timeliness is low and your response time measure in the process perspective indicates that 97% of the time you delivered within agreed upon schedules, then the discrepancy needs to be investigated. How do you compare to ORS overall? What did you learn from reviewing all your comments? Which areas will you concentrate your improvement efforts on and why?

Target = 3 Million SF / Year Customer Objective Objective: Increase Safety and Functionality Performance Measure: Square Footage Assessed on a 3 year Cycle Target = 3 Million SF / Year If you added unique customer measures, insert bullet statements summarizing your findings here or the graphs if informative. For example, you may show a graph depicting repeat customers or new customers, or revenue from new customers or new services. Refer to page 4 of this presentation for directions on how to insert charts/diagrams/graphs from other programs into PowerPoint. Delete this slide if you have no additional unique customer measures.

Internal Business Process Perspective Transition Slide for your Internal Business Process Perspective data and findings.

Internal Business Process Performance Objectives Increase understanding of process Identify methods to measure process Improve buildings Facility Condition Index

Internal Business Process Objective Objective: Increase understanding of process Performance Measure: Block diagram Program funding for next year Assess Buildings Determine FCIs Perform repairs Conduct Facility Assessments: Block Diagram of Assessment Cycle Establish facility assessment schedule

Internal Business Process Objective Objective: Increase understanding of process Performance Measure: Discrete Services Deployment Flowcharts Conclusions: Involved DCAB in the process Reduce the time between the initial customer contact and presentation of the final results to the customer. Process to update data before the next assessment Each Service Group was required to complete a deployment flowchart on every discrete service in their Service Group. After reviewing these flowcharts, summarize what you learned from this analysis. Ideas for summarizing conclusions from your Deployment Flowcharts: Did it lead to suggestions for changing the process? Did it lead to identifying process measures? Have you made any changes in your processes already based on what you learned? What impact should these changes have in process performance, customer satisfaction? How would you know if the changes achieved expected results? If particularly useful, you may want to include a copy of a deployment flowchart. Realize that in most cases, it will be difficult for your audience to readily see your chart in this format. However, you could focus on a section that you changed. If you choose to insert any deployment flowcharts, refer to page 4 of this presentation for directions on how to insert charts/diagrams/graphs from other programs into PowerPoint.

Internal Business Process Objective Objective: Identify Methods to Measure Processes Performance Measure: Improve cycle time for assessment process Target = 120 Days Each Service Group was required to come up with a unique process measure for every discrete service. List those measures here. A simple way to do that is indicated above. Also summarize any data that was collected on these process measures, and the findings from that data. If relevant, include graphs showing your process measures data. You should indicate how these unique measures helped you assess the performance elements of your team’s value proposition. For example, if you indicated that you provide timely and cost efficient services, then show the percentage of times that your services were delivered within agreed upon schedules. Then, in the financial perspective you can show how your unit cost has changed over time, or how your rates compared to other service providers. You may also show how your response time to service requests has changed over time.

Internal Business Process Objective Objective: Improve Facility Condition Index Performance Measure: Decrease the FCI overall for all buildings 50% Target 10% 5%

Learning and Growth Perspective

Learning and Growth Performance Objectives Enhance Quality of Work life for Employees in ORS Maintain and Enhance Competencies for the Future Organization Customers trained in use of Facilities Assessment Application

Learning and Growth Objective Objective: Enhance Quality of Work life for Employees in ORS Performance Measure: Turnover, Sick Leave, Awards, and EEO/ER/ADR Data Observation: 5.6 % employee turnover Less than one week of sick leave used per employee Approximately one award per employee No EEO or ADR cases out of 18 employees Conclusions: Zero turnover, not including retirement Employees are satisfied and happy Healthy environment and good working relationship among employees

Learning and Growth Objective Objective: Maintain and Enhance Competencies for the Future Organization Performance Measure: Analysis of Readiness Index Required skills: Contracting, facility management, coordination and planning, technical background RMS staff have these skills and can assume duty of the Project Officer if necessary Lack of personnel and skills in assessment and software application resulting in need for contract support Summarize the major findings from the Analysis of Readiness questions reviewed by your team. Ideas for Analysis of Readiness Summary: Do you expect major changes in the service group value proposition, or in the composition of discrete services ( 3 - 5 years from now)? What new skills and abilities are needed by your workforce? How do you plan to address fluctuations in discrete service demand? What changes in technology or tools, if any, are needed or desired? How do you know? Is it based on best practices or benchmarking studies? If so, please explain. What is the team doing to address the changes needed? What is the plan? What are the possible consequences of not implementing the changes in the time needed?

Learning and Growth Objective Objective: Customers trained in use of Facilities Assessment Software Application Performance Measure: Increase number of customers trained in use of Facility Assessment Software Target = 50% If you added any unique Learning and Growth measures, list them here. Also include bulleted statements of conclusions from this data, or if insightful, insert relevant graphs. Refer to page 4 of this presentation for directions on how to insert charts/diagrams/graphs from other programs into PowerPoint. Delete this slide if you have no additional unique learning and growth measures.

Financial Perspective

Financial Performance Objectives Minimize Unit Cost at a Defined Service Level Maximize Utilization of Assets Improve Building Deficiency Correction Cost Data

Financial Objective Objective: Minimize Unit Cost at a Defined Service Level Performance Measure: Change in Unit Cost Target Summarize the major findings from the Analysis of Readiness questions reviewed by your team. Ideas for Analysis of Readiness Summary: Do you expect major changes in the service group value proposition, or in the composition of discrete services ( 3 - 5 years from now)? What new skills and abilities are needed by your workforce? How do you plan to address fluctuations in discrete service demand? What changes in technology or tools, if any, are needed or desired? How do you know? Is it based on best practices or benchmarking studies? If so, please explain. What is the team doing to address the changes needed? What is the plan? What are the possible consequences of not implementing the changes in the time needed?

Financial Objective Objective: Maximize Utilization of Assets Performance Measure: Actual Asset Utilization 100% Asset Utilization Summarize the major findings from the Analysis of Readiness questions reviewed by your team. Ideas for Analysis of Readiness Summary: Do you expect major changes in the service group value proposition, or in the composition of discrete services ( 3 - 5 years from now)? What new skills and abilities are needed by your workforce? How do you plan to address fluctuations in discrete service demand? What changes in technology or tools, if any, are needed or desired? How do you know? Is it based on best practices or benchmarking studies? If so, please explain. What is the team doing to address the changes needed? What is the plan? What are the possible consequences of not implementing the changes in the time needed?

Financial Objective Objective: Improve Building Deficiency Correction Cost Data Performance Measure: % variation between budgeted costs and actual repair/replacement expenses Target = +/- 10% Summarize the major findings from the Analysis of Readiness questions reviewed by your team. Ideas for Analysis of Readiness Summary: Do you expect major changes in the service group value proposition, or in the composition of discrete services ( 3 - 5 years from now)? What new skills and abilities are needed by your workforce? How do you plan to address fluctuations in discrete service demand? What changes in technology or tools, if any, are needed or desired? How do you know? Is it based on best practices or benchmarking studies? If so, please explain. What is the team doing to address the changes needed? What is the plan? What are the possible consequences of not implementing the changes in the time needed?

Conclusions and Recommendations Transition Slide for your Conclusions and Recommendations.

Improvements Implemented: Established a three year contract for assessment program Completed first third of NIH campus (FY 02) Began the second third of NIH campus (FY 03) Completed assessment for off campus facilities at Rocky Mountain Laboratory, Montana and National Institute of Environmental Health Sciences in North Carolina Included other facility management reports such as roof maintenance, indoor air quality and asbestos management program in to the facility assessment database

Conclusions from FY02 ASA Major findings: Electronic links to other facility management and reports can not be made economically. For security reasons, a link to the assessment database from ORS web page should not be established. Backlog of Maintenance and Repair greater than expected Most buildings in fair condition Use this slide to summarize your conclusions from the FY02 ASA. Ideas for Conclusions: What are your major findings based on all of the analyses you’ve conducted? What services, products, or processes have you identified for improvement? What have you already implemented based on your findings?

Recommendations Complete assessment cycle. Assess other off campus facilities at GRC, Baltimore; New Iberia, Louisiana; Ft. Detrick, Maryland. Use assessment data in planning and budgeting Establish a policy goal for FCI at NIH. Develop a process to update building deficiencies before next assessment. Involve DCAB in the process. Shorten assessment cycle. Use this slide to summarize your recommendations. Ideas for Recommendations: How do you recommend making improvements for the future? What recommendations can you implement without higher-level approval? If you need approval from higher authority to implement a recommendation, clearly state who that would be, and the date by which you need the decision.

Appendices Transition Slide for your Appendices.

ASA Template – Page 2

Flow Chart