- CT INSTALLATION PROCEDURE OVERVIEW -

Slides:



Advertisements
Similar presentations
Click on this image to open the full PDF document.
Advertisements

PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
DCal-ALICE integration and installation plan and status A. Tauro.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STT gas system a possible implementation
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Update of MVD services and requests
Beam
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Very preliminary draft
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
cooling and supports of the forward endcap EMC
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
LumiCal mechanical design, integration with LDC and laser alignment
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
EMC BWE PANDA Insertion
Requirements of the support mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
Initial BIS installation
Step-by-step assembly instructions
Integration and IR Hall
Micromegas for CLAS12 – Preliminary work on integration
OT Survey & Adjustment Outline: Survey technique at present
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
The Garage Assembly Instruction By Laser Dollhouse Designs
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Cryomodule Assembly Plan
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
Polarized 3He target installation
Presentation transcript:

- CT INSTALLATION PROCEDURE OVERVIEW - THE AUXILIARY STRUCTURE HAS BEEN: > POSITIONED ON THE MOUNTING PLATFORM; > THE UPPER AND LOWER RAILS ALIGNED WITH THOSE OF BARREL DIRC STRUCTURE > THE CENTRAL SUPPORT FRAME HAS BEEN PLACED IN THE AUXILIARY STRUCTURE. CRUCIAL TOPICS: > THE RECIPROCAL POSITIONS OF THE “DIRC BARREL RAILS”; > THE ALIGNEMENT PROCEDURE OF THE RAILS SYSTEM; > THE DEFINITION OF A FURTHER MECHANICAL POSITIONING SYSTEM OF THE RAIL POSITIONS. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- CT INSTALLATION PROCEDURE OVERVIEW - THE ROLE OF THE CENTRAL SUPPORT FRAME IS CRUCIAL FOR: > TO CHECK THE CORRECT ALIGNMENT OF THE RAILS SYSTEM; > TO CHECK THE CORRECT COUPLING WITH THE TARGET VERTICAL ARM. CRUCIAL TOPICS: > THE INNER VOLUMES MUST BE ACCESIBLE FROM BOTH SIDES; > THE ALIGNMENT PROCEDURE OF THE CENTRAL SUPPORT FRAME; > SOME “FAKE COMPONENTS” THAT SIMULATE THE CROSS PIPE COUPLING PARTS MUST BE IMPLEMENTED IN THE FRAME. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- CT INSTALLATION PROCEDURE OVERVIEW - THE STEPS OF THE CENTRAL TRACKER ASSEMBLY PROCEED WITH: > THE VERTEX ASSEMBLY; > THE STT ASSEMBLY . VERTEX. ST_TRACKER. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > RACEWAYS ARE MOUNTED ON THE SIDEWAYS OF THE CT SYSTEM (ONE FOR EACH SIDE); > THE SERVICES (CABLES AND GAS PIPES) ARE CONVOYED IN THE RACEWAYS AND CONNECTED TO THE RACKS. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > THE SUPPORT STRUCTURE OF THE RACEWAYS ARE FORMED BY TWO PARTS: - A BLUE ONE, SUPPORTED ON THE RACKS STRUCTURE; - A YELLOW ONE, SUPPORTED ON THE AUXILIARY STRUCTURE. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > DURING THE SHIFTING PHASE OF THE CT INSIDE THE MAGNET, THE RACEWAYS FOLLOW THE MOVEMENT OF THE CENTRAL SUPPORT FRAME. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > THE CT IS IN THE FINAL POSITION INSIDE THE MAGNET. > THE RACEWAYS SUPPORTED ON THE AUXILIARY STRUCTURE (THE YELLOW ONE), ARE DISMOUNTED TOGHETER WITH IT. > THE RACEWAYS SUPPORTED ON THE RACKS STRUCTURE, (THE BLUE ONE), REMAIN ON SITE. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > TOP VIEW OF THE RACEWAYS MOVEMENT. STEP 1: THE CT IS COMPLETELY OUTSIDE. STEP 2: THE CT IS IN AN INTERMEDIATE POSITION. STEP 3: THE CT IS IN THE FINAL POSITION. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING/PIPING: > CT IN FINAL POSITION. INTERFERENCES WITH OTHER COMPONENTS DO NOT SEEM TO BE…….. ?. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - HYPOTESIS FOR STT CABLING PROS: > THE SYSTEM APPEARS FEASIBLE AND RATIONAL. > NO PATCH PANELS > ?????? HYPOTESIS FOR STT CABLING CONS: > THE SPACE ON THE SIDEWAYS OF THE CT WILL BE OCCUPIED BY THE RACEWAYS. > MUST BE MANAGED MORE OF 5 METERS OF CABLES AND GAS PIPES. > ????? GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- STT SERVICES (CABLES AND GAS PIPES) PROCEDURE OVERVIEW - PATCH PANELS. AN ALTERNATIVE HYPOTESIS FOR STT CABLING (AS SUGGESTED BY DANIELA): > A SYSTEM OF PATCH PANELS COULD BE SUSPENDED ON THE RACKS STRUCTURE (A SORT OF BRIDGE). > THE CABLES AND THE GAS PIPES BETWEEN RACKS AND PATCH PANELS REMAIN ALWAYS CONNECTED; > THE CABLES AND THE GAS PIPES BETWEEN SST AND PATCH PANELS MUST BE CONNECTED AFTER THE CT INSERTION AND MUST BE DISCONNECTED BEFORE THE CT EXTRACTION. GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- SIGNALS CABLES AND GAS PIPES CROSS SECTION DATA - 24 17 95 19 13 13 22 - SIGNALS CABLES CROSS SECTION:3000mm^2 9 54 41 53 17 14 - SERVICES TOTAL CROSS SECTION: 3000mm^2 - AVAILABLE CROSS SECTION: 5500mm^2 296 Flates (2960 Ch.) 106 13 17 54 41 53 9 in reality we would have had considered 3478 = 2318 tubes + 1160 control lines The surface of the Left and Right cutouts is 6600 mm2 23 13 19 13 95 17 24 -The encumbrance of the connectors has not been considered! GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI

- HV CABLES AND GAS PIPES CROSS SECTION DATA - (From the Forward Side) - HV CROSS SECTION: 200mm^2 13 HV Cables - GAS PIPE CROSS SECTION: 450mm^2 10 Gas Pipes (From the Forward Side) 13 COOLING PIPE CROSS SECTION: 70mm^2 (New entry) - SERVICES TOTAL CROSS SECTION: 800mm^2 - AVAILABLE CROSS SECTION: 1400mm^2 7 14 HV Cables 6 The surface of the Up and Down cutouts is 1800 mm2 each 10 Gas Pipes (From the Forward Side) 13 13 HV Cables 5Gas Pipes (From the Forward Side) -The encumbrance of the connectors has not been considered! 15 Gas Pipes 20 HV Cables GSI-MECH WORKSHOP_27.4.2015 - D. ORECCHINI