CHE 451 CHEMICAL ENGINEERING DESIGN ASSIGMENT 4: DISTILLATION COLUMN DESIGN Prof. Dr. Bekir Zühtü UYSAL Res. Asist. Melda ESKİTOROS 09114003.

Slides:



Advertisements
Similar presentations
Mass Transfer for 4 th Year Chemical Engineering Department Faculty of Engineering Cairo University.
Advertisements

Multistage Distillation
Process Modeling using Aspen Plus
Distillation and Alcohol Production Application
CENG 221 Lecture 4. Multi-component Distillation (4.5 h)
Blue-OX Energy Management TJ Chancellor Paul Cole Sara Habib Mira Kim Claudio Ramos Vicente Rosas.
INTRODUCTION BEN DALTON ANDY GUIDER TEAM MICHAEL A DIVISION OF HENRY TECHNICAL ASSOCIATES GREG HIGGINS BRAD PARR CHRIS ROGERS.
CHAPTER 6 Estimation of Manufacturing Costs Don Scott ENCH 430 2/7/06.
Proposal for Ethylene Glycol Distillation Tower Presenters: Demetrius Henry Tyler Ware Craig Staton.
1 Acetone, 2-Propanol H 2 Acetone 2-Propanol L2 Acetone, 2-Propanol L201 L101L1 L3 L4 L10 L9 Condenser Reboiler Distillation Column Endothermic Reactor.
Ethanol Production from Wastepaper Ben DaltonMarie Labrie Cassia DavisAlex Saputa John OzbekSteve Wild Murat Ozkaya4/15/09.
CHE 205 $200 $400 $600 $800 $1000 Vapor/Liquid Equilibrium Energy Balances Multiphase Systems Nonreactive Processes $600.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
ERT 313 BIOSEPARATION ENGINEERING DISTILLATION
Cyclohexane Production Unit
การออกแบบ โรงงานทาง วิศวกรรมเคมี (Chemical Engineering Plant Design) 3(3-0-6)
College of Engineering & Petroleum Depatment of Chemical Engineering
Section 1 Dr.Hoda’s part Sheet 1: Calculating equipment cost Eng. Reda Zein.
Propylene Oxide Production by ARCO Process Done By Fiasal Juhail.
CHEMICAL HEAT PUMP SAND TEAM
I = 1753 × FR^ I : Investment (€) FR : Flow rate (m 3 /h) I total = I×1.85 This factor of 1.85 accounts for : instrumentation, freight, foundation.
Propylene Production from
Safety & Economic Supervised By: Prof. Mohamed Fahim Eng. Yusuf Ismail Presented by Hessa Al-sahlawi Beshayer Al-Dihani Latifah Al-Qabandi.
Boiling and condensation
Designer: Khaled Aldhaferi Supervised by: Prof.M.Fahim ENG: Yousif Ismail PROPYLEN OXIDE CO-PRODUCTION WITH t-BUTYL ALCOHOL BY THE TEXACO HYDROPEROXIDATION.
Team Yellow. Experiment 3 IRI Economics FCI and Annual Costs FCI is $4.63 million Annual product cost is $104 million Annual cash flow is -$77 million.
by Pınar Özbay Nihal Payza Zeynep Pekişen Deniz Uğurlar
“Chemical Engineering Equilibrium Separations”
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
BALIKESİR ETHANOL PLANT
1. Introduction Basis of Design Process Structure Process Flow Diagram Equipment Design Process Control Waste, Environment, Safety Economy Conclusion.
+ P2 workshop Problem objective Process costs Product costs.
Done by: Esraá Hajjeyah Supervised by: Prof. M.Fahim Eng. Yusuf Ismail.
Supervised by: Prof. Mohamed Fahim Eng. Yusuf Ismail Done by: Mutlaq Al_Shammari.
Table of content 1- Heat exchanger design (cooler ) 2- Distillation column design. 3- Valve.
Tritium Fuel Cycle System Modeling with ASPEN -ISS and FCU
TOTAL CAPITAL INVESTMENT
Separation Trains S, S&L Chapt. 7. Simple Separation Unit Operations Flash Quench Liquid-liquid decantation Liquid-liquid Flash Crystallization Sublimation.
Chemical Heat Pump Members Yong Su Kim John Usher.
+ Improved tower models SCDS Tower. + Quick cost estimates Tower cost, installed = $40,000.
Optimization & Fleshing Out the Design Optimizing for capital and/or operating costs More detailed look at specific equipment.
CHEMICAL PROCESS DIAGRAM
Tower Design in ProMax ChEN 4253 Design II Chapter 19 S,S&L Terry A. Ring University of Utah.
CHE441 Lecture: Tank & Vessel. Introduction of Vessel Applications of Vessels:  (1) as a liquid surge drum for liquid storage  (2) as a vapor/liquid.
Che 451 chemical engineering design PIPELINE DESIGN
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
Che 451 chemical engineering design i HEAT EXCHANGER DESIGN
Process Economics Factors that affect profitability
Unit Operations Laboratory Distillation Analysis Seminar Super Team 2005 Monday, December 5, :30 PM.
Mentor: Dennis O’ Brien
Manajemen Industri Instructor: Rama Oktavian
Costing and Project Evaluation
John Edwards, P&I Design Ltd
Natural Gas Processing Plant
CEA’s assessment of the sulfur-iodine cycle for hydrogen production
Process Equipment Design and Heuristics – Heat Exchangers
Estimating Capital Costs
PROCESS AND PROCESS VARIABLE
Refinery: Separation units
ChEN 5253 Design II Chapter 13 Terry A. Ring University of Utah
Total Cost of Plant Purchased cost – equipment f.o.b.
CHPE404 Engineering Economy Estimation Of Capital Cost
Distillation Column – External Balance
CHPE308 Chapter Seven (Textbook) Estimation Of Capital Cost
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
Terry A. Ring Chemical Engineering University of Utah
Sieder et. al. Chapter 9 and 13
PROCESS AND PROCESS VARIABLE
Separation Columns (Distillation, Absorption and Extraction)
Condenser in Power Plants
Presentation transcript:

CHE 451 CHEMICAL ENGINEERING DESIGN ASSIGMENT 4: DISTILLATION COLUMN DESIGN Prof. Dr. Bekir Zühtü UYSAL Res. Asist. Melda ESKİTOROS 09114003 EMRE AKASLAN

INDEX AIM CHEMCAD FLOW CHART DESIGN VALUES COLUMN PROPERTIES METHOD OF CALCULATIONS ASSUMPTIONS COLUMN RESULTS DETAILED FLOW CHART BASIC RESULTS CHEMCAD RESULTS ECONOMICAL CALCULATIONS RESULTS FOR STEAM COST 40 TL/ton FOR STEAM COST 16 TL/ton COMPARING OF PROGRAMS RESULTS

AIM: IN THIS PROJECT, THE AIM IS TO DESIGN THE OPTİMUM ECONOMICAL DISTILLATION COLUMN FOR SEPERATION OF ACETONE, ETHANOL AND WATER MIXTURE. THIS MIXTURE IS DESIRED TO BE DISTILLED TO 99.9% PURE COMPONENTS.

CHEMCAD FLOW CHART

DESIGN VALUES: FEED AT FIRST COLUMN: 190 ton/h TEMPERATURE: 145 oC COMPONENTS WT% ACETONE 1.2 BUTHANOL 2.4 ETHANOL 0.4 WATER 2.8 MESITHYLENE 93.2

FEED AT THIRD COLUMN: 351 kmol/h TEMPERATURE: 96.45 oC q: 1 and f: 0 DESIGN VALUES: FEED AT THIRD COLUMN: 351 kmol/h TEMPERATURE: 96.45 oC q: 1 and f: 0 FEED STREAM   x Flow (kmol/h) Acetone 0,1118 39,2418 Ethanol 0,047 16,497 Water 0,8412 295,2612 Total 1 351

DESIGN VALUES: LIGHT KEY: ETHANOL HEAVY KEY: WATER DECIDED: XD(WATER): 0.0001 XB(ETHANOL): 0.0001

MATERIAL BALANCE RESULTS: D: 55.71 kmol/h B: 295.29 kmol/h TOP STREAM (T=65,66 C) BOTTOM STREAM (T=104,36 C)   y Flow (kmol/h) x Acetone 0,7043 39,243596 0,0000 Ethanol 0,2956 16,470832 0,0001 0,029528 Water 0,005572 0,9999 295,250472 Total 1 55,72 1,0000 295,28

COLUMN PROPERTIES 304 STAINLESS STEEL PLATE DISTILLATION COLUMN MULTICOMPONENT DISTILLATION COLUMN PARTIAL REBOİLER PARTIAL CONDENSER SIEVE TRAY

METHOD OF CALCULATIONS CALCULATE HEIGHT OF THE COLUMN CALCULATE DIAMETER FOR BOTTOM AND TOP PEC = COLUMN + CONDENSER + REBOİLER + PUMP UTILITIES = STEAM, WATER AND ELECTRIC COST DETAILED ECONOMICAL ANAYLYSIS PLATE DESIGN TO FIND IF THEIR IS WEEPING, FLOATING AND ACTUAL PRESSURE DROP

ASSUMPTIONS hw= 0.05 m F*= 0.80 For partial condenser U=750 W/m2K For partial reboiler U= 1200 W/m2K Pump efficiency = 0.75

COLUMN RESULTS Feed, kmol/h 351 Distillate, kmol/h 55.71 Bottom, kmol/h 295.29 x(acetone),F 0.1118 x(acetone),D 0.7043 x(acetone),B x(ethanol),F 0.047 x(ethanol),D 0.2956 x(ethanol),B 0.0001 x(water),F 0.8412 x(water),D x(water),B 0.9999 Partial Condenser Partial Reboiler Flows in Column Operating Temperature. oC 65.66 Operating Temperature.°C 104.36 Lo, kg/s 8.59 Operating Pressure. atm 1.15 1.18 V1, kg/s 9.43 Duty. kW 3103.5 3162.6 Lm, kg/s 10.92 U W/m2-K 750 1200 Vm, kg/s 9.42 m(water) kg/s 35.37 m(steam) kg/s 1.46   Column Properties Plate Properties RDmin 9.697 Number of Plates 59 ΔPdry (cm liq. column) 2.389 RD/RDmin 1.1 Feed Plate 42 Δptotal (cm liq. column) 9.236 RD 10.67 Height.m 27.5 Number of holes 64106 Nmin 20 Diameter.m 3.8 Ntheoretical 47

DETAILED FLOW CHART

BASIC RESULTS

CHEMCAD RESULTS

CHEMCAD SENSITIVITY ANALYSIS

ECONOMICAL RESULTS

DETAILED COST ANALYSIS FOR STEAM COST 40 TL/ton Direct costs   Purchased Equipment 1 639 666 TL Installation 819 833 Instrumentation and Controls 409 917 Piping 491 900 Electrical, Installed 327 933 TOTAL DIRECT COST 3 689 909 Indirect Costs Engineering and Supervision 737 862 Construction Expense and Contractor's Fee 1 180 578 Contingency 295 144 TOTAL INDIRECT COST 2 213 586 FIXED-CAPITAL INVESTMENT(TL) 5 902 894 Depreciation 393 526 TL/yr Insurance 29 515 FIXED-CHARGES 423 041 Maintenance and Repairs 295 145 Utilities 1 723 273 OPERATING COST 2 029 218 TOTAL ANNUAL COST(TL/year) 2 452 259

DETAILED COST ANALYSIS FOR STEAM COST 16 TL/ton Direct costs   Purchased Equipment 1 639 666 TL Installation 819 833 Instrumentation and Controls 409 917 Piping 491 900 Electrical, Installed 327 933 TOTAL DIRECT COST 3 689 909 Indirect Costs Engineering and Supervision 737 862 Construction Expense and Contractor's Fee 1 180 578 Contingency 295 144 TOTAL INDIRECT COST 2 213 586 FIXED-CAPITAL INVESTMENT(TL) 5 902 894 Depreciation 393 526 TL/yr Insurance 29 515 FIXED-CHARGES 423 041 Maintenance and Repairs 295 145 Utilities 713 015 OPERATING COST 1 019 030 TOTAL ANNUAL COST(TL/year) 1 442 001

COMPARATIONS FOR PROGRAM’ S CALCULATIONS

THANK FOR YOUR ATTENTION Prof. Dr. Bekir Zühtü UYSAL Res. Asist. Melda ESKİTOROS