Maria Steblay, MaKinnah Collins, Ryan DeGroot, Caleb Ingram

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

DENVER ZOO Lion’s Quarters Recycle Cross-connection
WelcomeWelcome BURT PROCESS EQUIPMENT “Harvesting The Rain” Rainwater Reclamation.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Bleach A cleaning agent that kills. Under your sink- There could be many types of bleach under your sink waiting to disinfect, or annihilate anything.
ISLA POPA II, PANAMA WATER SUPPLY PROJECT July 10 th 2014.
Josiah Dobson Brett Nicholson Travis Befus Team 11.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
1 Project Management CIS 375 Bruce R. Maxim UM-Dearborn.
Connecticut Department of Energy and Environmental Protection.
Weaning and hardening of coffee tissue culture plantlets Possible role of Xclusive Cuttings in Uganda’s Robusta replanting campaign Peter Benders Director.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
Managing Offshore Software Development Projects Presented by Orlando Moreno Phone: web:
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Rural Drinking Water Treatment System. INTRODUCTION Water demand Identification of water source Drinking water Quality Parameters Required treatment system.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Christian Pfretzschner Mike Handlogten Jason Kraai Brady Rathbun Julie Stoddard Our Team.
Everyone in the world needs clean water. Water can carry substances such as soil, dirt and chemicals. We have to treat water so that it is safe for.
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Amanda Jacobs Project Lead.
November 15, 2007 The “ABC” of Effective Field Monitoring & Supervision November 15, 2007.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Team 19. Outline Team Introduction Project Overview Challenges Christian Influence Status Questions 2 of 10.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
NicarAGUA – Team 17 SETH KOETJE, JESSE VANDERWEES, HANNAH VANDERVORST, DALTON VEURINK.
1 Global Water is an international, non-profit, humanitarian organization focused on providing safe water supplies, sanitation & hygiene facilities for.
The Waterworks Section 5.4. How does fresh water reach you? Ancient Romans built aqueducts – canals to carry water from the mountains to the city… some.
Provincial Drinking Water Objectives Office of the Provincial Health Officer and Health Protection Branch Presentation to Southern Interior Local Government.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Introduction to Software Project Management Lecture1.
P U B L I C S E R V I C E S State of South Carolina Enterprise Information System Business Case Study SCEIS User Group Briefing Wednesday July 10, 2002.
5 Important Rules While Booking a Banquet Hall
Project Management PTM721S
TVRWRF 23 MGD Expansion Disinfection System Conversion
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
CTC 450 Review Open Channel Flow (Manning’s Equation)
Change Management Committee Meeting July 11, 2016
Systems Analysis and Design in a Changing World, 4th Edition
Funding Lead and Copper testing in public schools
Dr. Sarah Colby, Nutrition Department
Perris Water Filtration Plant Membrane Upgrade – Phase I
Website Development Plan for Carlsbad Village Auto Body
CHAPTER ‘3’ Project Blastoff
The Nature of Groups.
Management of Oman Census2010
Business System Development
PRESENTATION BY TRILLIAN PROPOSED EXECUTION PLAN FOR ESKOM’S POWER PLANT IN SOUTH AFRICA DATE:
TECHjOSH.COM TechJosh.com.
Christopher Jones Sherri Cook Allison Davis Bill Hogrewe
With Good Flow Data: Greater control Decisions grounded in facts
Class III Estimate for Regional Consolidation
CTC 450 Review Open Channel Flow (Manning’s Equation)
Potable Water for La Pitajaya
Yearly average of freshwater consumption for Appledore
Controlling Project Cost and Schedule
Perspective of Typical Dayroom at Housing Module
Solids Stream Train incinerator (#1) built in 1972
3.1Process selection and the treatment process train
Johnny François Regional Office Manager, Les Cayes
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
2017 Community Health Assessment Fredericksburg City, Virginia
[Your Name]’s Trip to [country] with Engineering Ministries International Insert picture of you in-country here. Tell a quick teaser story of your.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Technology Maintenance
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

Maria Steblay, MaKinnah Collins, Ryan DeGroot, Caleb Ingram Green to Clean https://www.google.com/search?q=laguna+colta&espv=2&biw=1517&bih=714&source=lnms&tbm=isch&sa=X&ved=0ahUKEwilj5_ivcDJAhVMq4MKHaqOAbkQ_AUIBigB&dpr=0.9#imgrc=67TgLuBWvM5WAM%3A Maria Steblay, MaKinnah Collins, Ryan DeGroot, Caleb Ingram

Team 04 Maria Steblay Chemical Ryan DeGroot Civil/Environmental MaKinnah Collins Civil/Environmental Caleb Ingram Chemical Potential Roles: scheduling and team management, computer model development business plan and cost estimation budget Chlorine Disinfection Membrane Filtration website email communications with the client

The Problem - Green Rice The Existing System Current Sources Contamination Newly built well Our Task: Evaluate and modify current water distribution system Design a pump house Provide on-site chlorination and filtration https://www.google.com/maps/place/Iglesia+de+Balbanera/ Intro Feasibility Scope Future Questions 3/14

Project Feasibility Client Communication Current Community Development New Well New Reservoir Tank Bruce Rydbeck. Life Giving Water International “Rydbeck Ripples”. Newsletter. Fall 2015 Intro Feasibility Scope Future Questions

Project Status EMI Survey Trip Team trip in January (Agenda) Water Quality Tests Survey Data and Training Team trip in January (Agenda) Surveying Water Quality Tests if Necessary Meeting with Onsite Staff and Engineers Visiting other Communities https://www.facebook.com/eMiDesignHope/photos Intro Feasibility Scope Future Questions https://www.facebook.com/eMiDesignHope/photos/a.417173911260.199847.81561921260/10153049234251261/?type=3&theater

Project Status: Research Engineering Report: Improvement of the Potable Water; System Santiago de Quito Current Distribution Specifications Population Specifications Intro Feasibility Scope Future Questions

Project Status: Research Intro Feasibility Scope Future Questions Morocho, Efraín, July 2015, “Improvement of the Potable Water System”, Santiago de Quito.

Project Status: Engineering Analysis Distribution Pressure Zones Design Population Estimate (2035): 2,300 people Estimated Demand: 60,000 gal/day Additional Analysis to be done in January http://www.lib.utexas.edu/maps/topo/ecuador/txu-pclmaps-oclc-869565072-riobamba-3888-i.jpg Intro Feasibility Scope Future Questions

Project Status: Engineering Decisions and Accomplishments Chlorination as disinfectant Electrolysis, no membrane Sodium Chloride Dilute hypochlorite Possible Fluoridation http://www.bbc.co.uk/schools/gcsebitesize/science/ocr_gateway/chemical_resources/sodium_chloriderev2.shtml Intro Feasibility Scope Future Questions

Project Status: Design Norms Cultural Appropriateness Meeting Community Desires Financially Politically Labor Considering Community Capabilities Technically http://www.lifegivingwaterinternational.org/ http://www.lifegivingwaterinternational.org/ Intro Feasibility Scope Future Questions

Project Status: Design Norms Akvo Countries with Water Point Sensors http://akvo.org/blog/over-one-million-surveys-collected-with-akvo-flow/ Intro Feasibility Scope Future Questions

Project Status: Obstacles Communication Information Sources Filtration Options Maintenance Specialty Materials http://www.eschooltoday.com/global-water-scarcity/how-water-is-treated-for-drinking.html Intro Feasibility Scope Future Questions

Future Current Work Future Researching/Designing Communicating with client Trip Agenda Future November EMI Survey Team January/February Trip Intro Feasibility Scope Future Questions

Thank You! Questions? ??? Intro Feasibility Scope Future Questions