BI-day 2014, The SEM-grid renovation project Michel Duraffourg

Slides:



Advertisements
Similar presentations
12/02/2013 Gerrit Jan Focker, BE/BI/PM 1 WireGrid electronics in the Linac 4 tunnel.
Advertisements

Data Acquisition Risanuri Hidayat.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
22/11/2013 Gerrit Jan Focker, BE/BI/PM 1 BI review on Radiation development and testing. Analogue Electronics for: - L4 Grids, - L4 Scanners, - PS Complex.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
The Stripping Foil Test Stand in the Linac4 Transfer Line
False asymmetries/Ground Loops David Bowman 4/27/12.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
Meeting from Mai 10th at ETHZ ArgonTube electronics Charge amplifier or linear amplifer ? Front end module Max Hess.
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
ProtoDUNE SP – Slow control temperature gradient monitor
Beam Interlock System SPS CIBU Connection Review
Overview of the Beam Interlock System
Calorimeter Mu2e Development electronics Front-end Review
ECAL Front-end development
Analog FE circuitry simulation
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Readout electronics for aMini-matrix DEPFET detectors
Injectors BLM system: PS Ring installation at EYETS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Ewald Effinger, Bernd Dehning
BE-BI Software for LINAC4
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Summer 2000 HF Beam Test. DAQ proposal.
Beam instrumentation for HIE-ISOLDE
LHC BLM system: system overview
Electronics: Demod + 4Q FE
Upgrading the Digital Component of the Bunch Current Monitors
AQT90 FLEX Service Training
Combiner functionalities
PS Machine Changes during the 2009 Shutdown
BESIII EMC electronics
Status of muon monitor R&D and construction
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Series 5300 Lithium Cell Formation System
Clement Derrez European Spallation Source ERIC Date
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Breakout Session SC3 – Undulator
Presentation transcript:

BI-day 2014, The SEM-grid renovation project Michel Duraffourg Jean Tassan-Viol, Gerrit Jan Focker, Michel Duraffourg, BE/BI/PM 16/10/2014

The SEMgrids (Secondary Emission Monitor) 16/10/2014

16/10/2014

Introduction Electronics of PS SEM-grids needed being replaced, too old and obsolete components. Common development for Linac 4 and PS-Complex Linear Amplifiers for long beam pulses (Linacs), Integrating Amplifiers for short beam pulses (circular machines, transfer lines). The Amplifiers need to be placed near the detectors, to be relatively safe with the radiation the electronics in the tunnels contains: Only amplifiers, No logic, no power supplies. 16/10/2014

Overview Between Grid and Amplifier: two cables with twisted pairs with individual screening. The two cables will be mounted together in Harting 72-pin connectors. Between Amplifiers and Controls a single cable is proposed (CERN ND100) mounted with Harting 108-pin connectors. Power and I/O control are handled by the same cables, no additional cabling is foreseen. Bias +120V directly onto measuring wires. Few cables allow rapid intervention on the box. 16/10/2014

Amplifier-boxes. Up to 2 x 32 channels per box. 2 Motherboards with daughter-boards carrying 4 amplifiers each. 16/10/2014

Controls of grids. VME-crates: 36-channel ADC’s, (BI-PI design) Sampling at max. 250kHz, Input Bandwidth ~200kHz. Serial RS422 Control cards, CO-standard. Card for Timing. Up to 2 Interface chassis, each containing : Up to 8 controller cards Limitation of 8 due to the size of the Harting connectors on the rear panel. 24V power. 16/10/2014

Grid controller cards. Automatic offset-zeroing, Software controlled MUX: output to OASIS, +5V power for Amplifier output stages, Floating +5V power at max. +120V for Amplifier input stages (bias), Pneumatic Movement control, Control of relays for amplification setting and test-signals. Control by RS422. 16/10/2014

Design Details (1). Linear Amplifiers: Input ranges: 1μA to 10mA, The calculated input-related noise-level is ~2nA rms at 1MHz BW. Overall BW is defined by the cable-length between grid and electronics, 8m cable results in 500kHz. Integrating Amplifiers: Depending on the input sensitivity the input will be An active integrator with most sensitive input range 2,5pC, Theoretical noise should be 5fC rms, but environmental noise appears to be much higher. Or a passive integrator with maximum input range of 250nC. 16/10/2014

Design Details (2). Specific for old PS Grid Hardware: Both Amplifier types: Isolated input-stage: Bias of up to +120V on measuring wires. The design foresees to use test-resistances: At the grid in the vacuum-chamber, Outside the vacuum-chamber at the cable-connection, At the amplifier-inputs. Specific for old PS Grid Hardware: In many places the original cabling was kept. Lemo-00 connections, original cables in very good shape. Changing these cables would have required major modifications on the SEM-grid hardware or replace the hardware. Not possible to have test-resistors! 16/10/2014

Spice was used for development Integrating Amplifier Design Details 16/10/2014

Tests. Labview programs have been developed for testing using Fesa class. 150 ADC’s programmed and tested, More than 200 Amplifier cards tested. 16/10/2014

Other modifications to the installations. PLC’s for In/Out control and angle control have been installed or upgraded In/Out with Interlocks, Electrical In/Out Movements, Stepper Motor Controls for variable Angle. Power Supplies for polarisation have been renewed. Linac3 16/10/2014

Installation Examples. Booster PS Booster TT2 16/10/2014

Conclusions and remarks. Though the PM –section was a bit stressed to install a totally new system with little possibilities for testing beforehand it looks like the equipment is working. Time will learn whether it with fulfil the wishes of the users and how long it will resist in radiated areas. This system could also be used for other machines by using different Amplifiers. It is foreseen to make very sensitive (slow) amplifiers for Isolde. 16/10/2014

Acknowledgements Thanks to all people that participated to this renovation. Jean Tassan-Viol Gerrit Jan Focker David Michel Sellez Section SW Section ML Thanks to Joao de Carvalho Saraiva from the R2E Team finding the best spots for installation in the tunnels. MANY THANKS TO ANA FOR HER GREAT CONTRIBUTIONS AND (moral) SUPPORT !!! 16/10/2014