Steering algorithm experience at CTF3

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
CTF3 ORBIT : TOOLS AND AUTOMATIC TUNING Davide Gamba 4 February 2014 CLIC Workshop CERN.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
Beam Dynamics WG Summary N.Solyak, K.Kubo, A.Latina LCWS 2014 – Oct 6-10, 2014 – Belgrade, Serbia.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
O RBIT F EEDBACK EXPERIENCE AT CTF3 Davide Gamba 3 October 2014 Octoberfest at JAI – Royal Holloway University of London.
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
RF Pulse Compression system for CTF3.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
ILC BDS Alignment, Tuning and Feedback Studies
Phase Feed-Forward Piotr Skowroński (CERN)
Piotr Skowroński for the CTF3 team
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Orbit Response Matrix Analysis
First Year of Operation at the Two-beam Test Stand
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
CLEX* Status and Plans CTF3 complex CLEX
New algorithms for tuning the CLIC beam delivery system
S. Bettoni for the CTF3 commissioning team CTF3 commissioning status
Status of the CLIC main beam injectors
CLIC Damping ring beam transfer systems
Have a chance to operate your own beam at CERN
Commissioning the Fast Orbit Feedback System at SSRF
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński CTF3 Meeting 9 February 2012.
Status of Reference Network Simulations
Recent high-gradient testing results from the CLIC XBoxes
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Summary Shifts 8th Oct – 12th Oct
Phase Feedforward in 2015 & Plans for 2016
ILC Main Linac Alignment Simulations
Beam-Based Alignment Results
Quadrupole error localization using Response Fits
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
TI8 analysis / J. Wenninger
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
LHC An LHC OP guide… under construction J. Wenninger
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Steering algorithm experience at CTF3 Davide Gamba davide.gamba@cern.ch 13 December 2013 (Slides from previous presentation at The International Workshop on Future Linear Colliders LCWS13)

CTF3: the CLIC Test Facility at CERN. Steering necessities. Outlook CTF3: the CLIC Test Facility at CERN. Steering necessities. A general feedback algorithm and its implementation. Preliminary results and issues. Work in progress: new tools. Dispersion measurement from Jitter. “Jitter free steering.” Summary.

CTF3: the CLIC Test Facility at CERN. Drive Beam Gun Dogleg Experiment Factor 2 Recombination Factor 4 Recombination Building 2003 DL 42 [m] Building 2001 CR 84 [m] Building 2013 Building 2010 CLEX area Photo Injector Tests Two Beam Test Stand (TBTS) Probe Beam Photo-Injector XBOX experiment Deceleration Test Beam Line (TBL)

Steering necessities

Steering necessities. For machine operation and optimization we need a general tool to control the orbit of the beam. It has to deal with some intrinsic limitations Data acquisition is affected by noise White noise Not null dispersion and energy jitter Non responsive control system Delicate Front-Ends Instable beam (mainly coming from RF instabilities) Beam position may not be a well defined measurement in case of losses Challenging machine MADX model not always accurate Aperture limitations Algorithm to measure the response matrix needed Has to be “fast” compared to machine faults and drifts Has to be able to follow slow drifts of the machine

Steering necessities. Special case: during recombination, different section of the initial train take different paths. They don’t necessarily come back on the same trajectory. Only one section over two is delayed into the Delay Loop Initially we only have a long train “divided” into 8 sections, each 140 ns long Projected emittance blow-up. Increased losses. In the Combiner Ring all the 8 sections can end up in having different orbits

Steering necessities. First stage: match orbits of delayed and not-delayed trains. Use correctors in Delay Loop Force the same orbit in the next Transfer Line (TL1) In principle only two correctors with the right phase advance are needed. Aperture limitations may impose to use more correctors.

The feedback algorithm

The algorithm Solving a linear system of equations

The algorithm SVD   Synchronization

The algorithm Measure the response matrix based on a simple concept: Randomly excite all the correctors Read the Beam Position at all the interested points Invert the same linear system of equations, but the Response Matrix is now the unknown: Keep a history of last setting/observations pairs of variable length Also during beam corrections outcome data can be used to improve Response Matrix.      

Computed response matrix Testing the response matrix measurement algorithm Real response matrix Computed response matrix Computed – Real N correctors = 8 N BPMs = 12 correctors excitation σ = 1[A] correctors noise σ = 0.01[A] BPMs noise σ = 0.1[mm] dispersion induced jitter σ = 1 [mm] number of iterations: 100 history size: n = 30.

The algorithm: implementation and test Developed a Matlab application for generic linear feedbacks.

The algorithm: implementation and test Example of correction of beginning orbit of the linac.

The algorithm: implementation and test Example of use to control end of linac orbit:

The algorithm: implementation and test Example of use to control end of linac orbit:

The algorithm: implementation and test Example of use to control end of linac orbit:

The algorithm: implementation and test Example of use to control end of linac orbit:

Preliminary results Back to the main goal: use the tool to match “delayed” and “straight” orbits in TL1. Use correctors in Delay Loop Force the same orbit in the next Transfer Line (TL1)

Preliminary results “Orbit matching” in TL1

Preliminary results A first issue: straight and delayed beam have different energy From a rough estimation, this offset is related to a Δp/p = -0.03 of the delayed beam. Note: the injector was not properly optimized. These results were not obtained in normal condition of operation.

Work in progress

Interlude: beam jitter induced by energy jitter After summer shutdown: looking at energy jitter markup in beam position in dispersive region. We are affected by a natural jitter of the energy. Beam energy along the pulse is also not always flat. Thanks to generality of our feedback tool we can use it to shape the RF power of last linac structure to try to compensate the second effect. Note: 3Ghz beam for factor 4 recombination, i.e. different setup respect to previous slide!

Dispersion measurement from Jitter Developed an application to passively measure dispersion by beam jitter.

Nominally dispersion free Jitter free steering The first area where we have dispersion is at the end of Drive Beam linac, where a chicane is installed. Nominally non zero dispersion Nominally dispersion free

Jitter free steering Using the same feedback application and measuring dispersion as jitter. Change correctors inside chicane to reduce jitter (i.e. dispersion) downstream. Acquiring 30 beam pulses for each iteration. Main disadvantage: RM measurement and correction takes longer time. Preliminary results!

New ideas Other ideas to get read of energy jitter to measure Response Matrices? Even better: use it in a different way to get Dispersion Response Matrix. Can we guess the beam main characteristics ( x0 ; x0’ ; Δp/p ) only looking at the orbit of the beam in few BPMs upstream, and predict the orbit downstream? What if in the mean time a corrector is changed (and so the dispersion)? Use as indipendent variables the BPMs readings in TL1 In the mean time randomly excite downstream correctors (also indipendent variables) In a system like this, at first order, beam position in a downstream BPM seems to linearly depend on: x0 ; x’0 ; Δp/p ; (Δp/p x0) ; (Δp/p x’0) ; IC1 ; (Δp/p IC1) ; … ; ICN ; (Δp/p ICN) We don’t have any of this information, but they may be expressed in terms of upstream beam positions. Measure response matrix downstream

New ideas

… Work in progress to verify this is correct … New ideas If we suppose that within two shots we only change correctors and energy. Δ(Δp/p) can be measured from the jitter on a BPM. … Work in progress to verify this is correct …

Summary What has been done: What is ongoing: What is next: Developed and tested a generic linear feedback. Smart way to measure the response matrix: it can work in quasi-parasitic mode and/or during orbit correction. First results and characterization of possible limitations. What is ongoing: Dispersion measurements from jitter. “Jitter free” steering. Comparison of the response matrix with machine model (MADX). e.g.: found a corrector with inverted polarity. Model optimization using LOCO procedures. What is next: Demonstrate the possibility to match the two orbits in TL1 within noise level. Apply the feedback for the full closure of CR. Measure the improvement in beam emittance and power production stability.

Thank you.

Appendix slides

Measured Linac RM with errors (Appendix)

DL layout (Appendix)

TL1 layout (Appendix)

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM

DL -> Tl1 Response Matrix (Appendix) MADX and Measured RM