JLab Accelerator Overview

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Update on Accelerator Commissioning Plan Todd Satogata Accelerator Physics Group Head Center for Advanced Studies of Accelerators Accelerator Readiness.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
Y. R. Roblin Hall A beamline and accelerator status.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
12 GeV CEBAF Transverse Emittance Evolution Todd Satogata / Center for Advanced Studies of Accelerators May WEBD1.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
July Ops StayTreat: Transverse Emittance (T. Satogata)p. 1 Synchrotron Radiation Emittance Growth Arc focusing very flexible: separate power supplies.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
From Beam Dynamics K. Kubo
Cost Optimization Models for SRF Linacs
Beam Commissioning Adam Bartnik.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Test of Optical Stochastic Cooling in CESR
Slice Parameter Measurements at the SwissFEL Injector Test Facility
SuperB Injection, RF stations, Vibration and Operations
Jefferson Lab, Newport News, U.S.A.
ORFP Update: Outline Reminder of ORFP objectives
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
Controls CBETA controls will extend existing EPICS control system
First Look at Nonlinear Dynamics in the Electron Collider Ring
Beam Optics Set-Up at SLAC End Station A
Accelerator status after the 12 GeV upgrade
12 GeV CEBAF.
Diagnostics overview and FB for the XFEL bunch compressors
Beam-Based Alignment Results
Collider Ring Optics & Related Issues
Advanced Research Electron Accelerator Laboratory
Feed forward orbit corrections for the CLIC RTML
Trent Allison Ops StayTreat 2015
MEBT1&2 design study for C-ADS
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
Continuous Electron Beam Accelerator Facility Overview
CEPC SRF Parameters (100 km Main Ring)
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Hall A Beam Parameters Table
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

JLab Accelerator Overview CLAS Collaboration Meeting Feb 23-26, 2016 Jefferson Lab Michael Tiefenback, CASA with grateful acknowledgment of material from others -- “Thank You” to all CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 Outline: Accelerator Operations Summer 2015 -- Fall 2015 Outlook for Spring 2016 – Fall 2016 SRF C100 controls improvements energy jitter and vibration sensitivity Support for accelerator operations CASA and Engineering/Diagnostics Accelerator startup and operational tasks Diagnostic systems and applications Recent commissioning work/results Upcoming developments CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 SRF C100 Improvements Cavity controls being updated to improve Energy jitter Vibration sensitivity Master Oscillator stability improved Temperature stability, water flow control Improvements in certain narrow-band disturbances (27Hz?) Collaborative work involves staff from many areas Significant improvements already seen More expected CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CASA and CEBAF Operations CASA presently provides 2+ FTEs to CEBAF operations Distributed among 6-7 participants Commissioning support higher CEBAF Model Team Optics model/lattice layout, design, controls integration Beam Transport Team (BTeam) Operational review of tuning, optics, beam quality Beam Studies forum Weekly optics on call rotation during CEBAF operations Primary and backup opticians 24/7 for operations Primarily for main accelerator transport retuning issues e.g. diagnose beam jitter (identify subsystem support) separate on-call support by injector and hall optics (APELs) CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 APELs Accelerator Physics Experiment hall Liaisons Hall A: Yves Roblin Hall B: Michael Tiefenback Hall C: Jay Benesch Hall D: Todd Satogata Responsible for beam delivery and hall integration Point person for hall beam tuning/beam quality every run Evaluate/coordinate all hall experiment beam requirements Design and improve beamlines/diagnostics/procedures Works closely with similar liaison from Operations Often a member of hall experiment collaborations CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 CEBAF 12 GeV Beam Physics CASA organized the detailed 12 GeV beam commissioning plan Multi-year development plan Successive beam diagnostics calibrations and measurements throughout All CASA personnel engaged Updates indicated progress through successive runs Planned carefully Performed as planned CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CEBAF Detail Schematic CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CEBAF Detail: Transverse Matching CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Model-Based Optics Rematch σX2 [μm2] σX2 [μm2] Before match, as found 1.8x105 Horizontal 2.2x105 Horizontal εx=2.6 nm-rad After match εx=3.0 nm-rad All data plotted is (measured beam σrms)2 vs (set quadrupole KL) Blue data is design intent Red data is measurement [Horizontal after-match variance is due to measured beam emittance being larger than design expectation] 0.40 KL [m-1] 0.95 0.40 KL [m-1] 0.95 σY2 [μm2] σY2 [μm2] 9.0x105 9.0x105 Vertical Vertical Vertical εY=1.9 nm-rad εY=1.9 nm-rad -0.1 1.0 -0.1 1.0 KL [m-1] KL [m-1] CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CEBAF Detail: Bunch Length Compression CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CEBAF Detail: Arc Transport and M56 CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Initial Year’s Beam Requirements 5.0 pass, 11GeV requirements 5.5 pass 12GeV Physics beam requirements transmitted to CASA in 2007. CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Initial Years Beam Requirements Met! ✔ ✔ 5.0 pass, 11GeV requirements ✔ ✔ ✔ ✔ ✔ 5.5 pass 12GeV ✔ ✔ ✔ Physics beam requirements transmitted to CASA in 2007. CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Emittance/Optics Campaign Strategy Incorporated into 12 GeV optics commissioning Measure in all (available) matching regions Single quad  single wire scanner measurements Improve automation, model integration in 6 GeV tools Measurement/match: 6-8 hours (expert)  1 hour (operators) Additional benefits Matching more systematic and consistent through CEBAF Faster measurements can be performed more routinely e.g. comparison of different lasers, space charge effects “Parasitic” beam emittance data from every scan/rematch 12 GeV data shown: Fall 2015-present CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Model-Based Optics Rematch Before match, as found x’ [μrad] x’ [μrad] 40 Horizontal 40 Horizontal After match All data plotted is the projected beam ellipse in (x,x’) at start of an upstream scanned quad This data is for Arc 9 spreader Blue and green ellipses are measurement Red is online model prediction Excellent agreement εx=2.6 nm-rad εx=3.0 nm-rad -40 -40 -250 250 -300 300 x [μm] x [μm] y’ [μrad] y’ [μrad] 40 40 εy=1.9 nm-rad εy=1.9 nm-rad Vertical Vertical -40 -40 -300 300 -300 300 y [μm] y [μm] CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

12 GeV Horizontal Emittances Through present Corrected for pot/stepper, angle Point out 0L04 cryomodule (first data point) Horizontal emittances within all specifications Usually within factor of two of design (often better) Synchrotron radiation-driven emittance growth as predicted CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

12 GeV Vertical Emittances Through present Corrected for pot/stepper, angle Vertical emittances also within all specifications Synchrotron radiation-driven emittance growth also as predicted CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Emittance Observations Detailed top-to-bottom error analysis in progress Randoms: harp noise, carriage jitter, magnet regulation Systematics: harp scaling, magnet transport, procedural clarity Randoms are small (~few %) vs potential systematics Observed large uncertainties in harp carriage transport scaling (up to 50%) Miscalibration of linear potentiometer vs stepper travel Contributes quadratically to calculated emittance Does not substantially alter match parameters Data shown includes pot/stepper angle correction Quantify/cross-calibrate with non-blooming viewers CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Emittance Growth Scaling and Mitigation rms, geometric 180° multi-cell bend Sands 1985, Douglas 1997 Arc focusing very flexible: separate power supplies for all 32 arc quads Traditional CEBAF FODO cells  DBA cells in higher arcs 30-40% reduction in Tested in 2013-2014 11 GeV Dispersion/pathlength coupling through M56 Arc 10 DBA optics CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Bunch Length Measurements M. Ahmad PhD Student Linac gang phase vs SLM dispersive bunch size Short bunches even without injector compression Limit nonlinear halo, momentum spread in lower passes CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

6 GeV Existing Diagnostics Antenna-Style Beam Position Monitor Pathlength Cavity Beam Viewers New Style Old Style Beam on Viewer in Chicane Wire Scanner and Electronics Wire Scanner Forks CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 New 12 GeV Diagnostics Stripline Beam Position Monitor Stripline BPM on Stretched-Wire Test Stand Synchrotron Light Monitor Typical Results from BPM Test Stand CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Hall B: 1-pass Halo (1 GeV) <10-4 A. Freyberger CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Hall D: 5.5-pass Halo (10.5 GeV) < 1% A. Freyberger CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Viewer/SLM Profile Diagnostics Quantitative tools under development SLMs provide real-time parasitic jitter comfort display CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

New Pathlength Data System Longitudinal 1497 MHz cavities, each linac exit (time of arrival monitor) Resolution ~50 um Calibrated this run EPICS connected to archiver for long-term pathlength studies Internal current normalization enables laser-to-laser comparison Differential time of flight, precise time-of-flight cavity gradient checks Master Oscillator Modula- tion (MOMod) recommis-sioning and RF cresting development upcoming Pathlength [mm] Magnitude Phase CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 Future: RayTrace RayTrace: launch/measure pseudo-emittance rays Localize errors more precisely than other ORFP techniques Can provide robust, fast, large-scale transport matching Does not obviate need for beam/transport match In need of substantial tool development Similar to successful evolution of quad scan emittance/matching R. Bodenstein Ph.D. Thesis Fig. 4.3 CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Diagnostic Developments Fast FeedBack for Hall D with Digital Receiver BPMs Stripline pickups for higher sensitivity Cavity pickups for very low currents Adaptable to 3 GHz pickup to avoid 1497 pollution? Low current implementation (useful for Hall B?) Additional synchrotron radiation imaging stations Improving systems for image analysis and use providing flexible controls for image aquisition CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 Stripline BPMs Position calculated as difference-over-sum 100um resolution 120Hz bandwidth 330 nA of beam 26 Striplines IPMBS00 IPMBS01 IPMBS02 IPMBS03 IPMBS04 IPMBE01 IPMBE02 IPMBE03 IPMBE04 IPMBT01 IPMBT02 IPMBT03 IPM5C00 IPM5C01 IPM5C02 IPM5C03 IPM5C04 IPM5C05 IPM5C06 IPM5C07 IPM5C08 IPM5C09 IPM5C10 IPM5C11 IPM5C11B IPMAD00C XPOS YPOS Beam Current (nA) Y Stepper Ladder Goubau Line BPM X Stepper CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 Cavity BPMs IPM5C11A at shield wall, IPMAD00 at Goniometer Positions calculated as X/I & Y/I Signal disappear at boresight X&Y phase shift 180⁰ at zero crossing Phase indicates positive or negative position 100um resolution 120Hz bandwidth 1nA of beam Beam time needed for commissioning and response characterization Tuners I X Y Probes & Test Ports Foot Blanket w/ Heat Tape CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

HW Testing: 60Hz Suppression Line-synchronized Feedforward suppression Proved hardware capable of canceling motion IPM5C07 Stripline Frequency Response 60Hz Suppression OFF ON CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

Accelerator Physics Summary CASA continuously supports 12 GeV CEBAF operations Optics and analysis support, beam studies program 12 GeV CEBAF program meets beam requirements Systematic transverse match, emittance, bunch length measurements Synchrotron-radiation emittance growth understood 12 GeV diagnostics being re-commissioned, newly commissioned, and in continuing development SLMs, stripline BPMs are operational successes Working towards 6D tomography, rayTrace global match CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016

CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016 Accelerator Status Meeting requirements Developing plans to handle emerging issues Vibration sensitivity More rapid recovery to gradient for C100s Developing procedures to use new capabilities Improved beam timing diagnostics FFB expansion to HallD Additional features of new BPMs The land of opportunity CLAS Collaboration Meeting, Jefferson Lab, Feb. 23-26, 2016