2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting January 19, 2017.

Slides:



Advertisements
Similar presentations
1 Restoration of Quail Habitat on Surface Mined Lands Kale HortonRamona Briggeman U.S. Dept. of the InteriorIndiana Dept. of Natural Resources Office of.
Advertisements

West Virginia Department of Environmental Protection Division of Land Restoration Special Reclamation Program Alyce R. Lee ERS III.
Surface mining control and reclamation act of 1977 Draft Year: 1977 Amendment Years: The Abandoned Mine Reclamation Act of 1990 amended this act. This.
Surface Mining Control and Reclamation Act of 1977 By Nadia Farjood Period 6.
Reclaiming the Land After Kaolin Mining Ridge Road Elementary 4 th Grade Brannen Homeroom.
Cottonwood Wash Abandoned Mine Reclamation Project: A Partnership in Watershed Reclamation.
Wiser Lawn Care The Wiser Decision For Your Lawn Care Needs.
Surface Mining Control and Reclamation Act of 1977 By: Leeron Azoulai The Surface Mining Control and reclamation Act was drafted in 1977 and amended in.
LANDSCAPE MULCH. Definition Any materials that covers the coil surface around and under plants to protect and improve the area.
THE PROBLEM SOLVING POWER OF UNITS 2A. Basics Units of quantity describe what is being measured or counted. We can only add values that have the same.
Construction Cost Estimanting 4003 Cost Estimating/ Engineering Concrete Structures Prepared by: Ebrahim A Alkooheji Instructor: Proff. Locurcio.
SURFACE MINING CONTROL AND RECLAMATION ACT OF 1977 MEERA KOTA-PERIOD 3.
Office of Surface Mining Reclamation and Enforcement MissionEnsure that coal mines are operated in a manner that protects citizens and the environment.
Landscape Management Practices Mulching. Mulch (A tree’s best friend)  Insulates soil  Retains moisture  Keeps weeds out  Prevents soil compaction.
Kern River Natural Gas Line Expansion: A Case Study in Overcoming Adversity on a Mountainous Lineal Reclamation Project David Chenoweth, Joe Schneider.
Mining. What we mine… Ore : Ore : any material that mined –is mined (not grown) demand –is in demand (there is a need) profit –can be sold for a profit.
Land Restoration at the Climax Mine Zach Margolis Presented at the Mining, Forest & Land Restoration Symposium/workshop July, 2000 Sponsored by the the.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Created by Mr. K Math Facilitator Area or Perimeter? That is the question! An online study guide to help you review the 4 th grade area & perimeter objectives.
Geometry for the Landscape Adapted from: Chapter 2 Math for Horticulture by Mary Ann Boor From foukeffa.org Written by Cara Hutchins Kowal GA Ag Ed Curriculum.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Environmental Costs of Strip Mining of Texas Lignite Area stripping Overburden not high sulfur Reclamation cost C T = C A /T C T = Cost.
Coal. 1.(True/False) Coal is a mineral. 2.What is the lowest grade of coal? 3.What is the highest grade of coal? 4.What is the medium grade of coal? 5.Which.
Airman Topics Westwind Air Service Airman Topics Performing Weight and Balance.
Assignment #6 Stripping Ratios by Planimeter ©Dr. B. C. Paul Summer 2003.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Radius & Diameter Volume.
How to Calculate Landscape Estimates and Quotes 2.01 Apply procedures to perform calculations used in estimates and quotes.
6, 5, 3, 6, 8 01/10/11 Mean, Median, Mode Warm Up
Mulch Calculating for volume for a 3 dimensional object Area of cone =  rs Area of base =  r 2 SA =  rs +  r 2 V = 1/3  r 2 h S A = 4  r 2 V = 4/3.
Surface Mining Control and Reclamation Act of 1977 By: Alex Rembolt Period 3 This was approved on August 3, It was amended in 1978, 1980, 1981, 1982,
The Mining Cycle Exploration MiningReclamation Metals-6-1 Images: Martin Miller.
2015 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting April 23, 2015.
MRAB July 9, Non Regulatory Agenda plus New TGD Guidance Documents in process Pre-applications Engineering Manual Blaster’s License Suspension Coal.
2014 Small Farm rate: Cost & Cost per acre foot as a function of bimonthly consumption in cubic feet 2,800 cf bimonthly, 0.39 acre foot annually Near Medium.
Agriculture Mechanics I.  The volume of a triangular prism is equal to the area of the triangle times the length of the prism. ◦ V = ( ½ (b x h)) x l.
Measures of Central Tendency Mean, Median, Mode, and Range.
Utah Abandoned Mine Reclamation Program Division of Oil, Gas & Mining Department of Natural Resources Lakeside Project.
DROPPING LOWEST GRADES MATC Math Club January 26, 2006 Jonathan Kane, Professor University of Wisconsin-Whitewater.
The number which appears most often in a set of numbers. Example: in {6, 3, 9, 6, 6, 5, 9, 3} the Mode is 6 (it occurs most often). Mode : The middle number.
What will be done I will be installing an area for a kindergarten playground. Next year the school is moving to full day kindergarten and a playground.
Solving Math Word Problems. Mr. Childers needs to sow grass seed in his yard. His lot is 150 feet by 200 feet. His house is 1,100 square feet and his.
© 2010 The Williams Companies, Inc. All rights reserved. Safe and Reliable.
By Connor Armitage.  The purpose of the SMCRA was to address fears about the effects Coal Mines have on the environment.  The act forced miners to obtain.
MRAB January 22, Permit Decision Guarantee – Guidance Documents to be revised Pre-applications ( ) Engineering Manual Transfers Other.
2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting July 21, 2016.
Remining Financial Guarantees
, Mean Median , Range Mode &.
2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting October 20, 2016.
Bureau of Mining Programs Update
Tunnel Farming of Vegetables ( Preparation of Soil) A Series of Presentation By Mr Allah Dad Khan
JOHN HENRY NO. 1 MINE - SUMMARY
Surface Mining Control & Reclamation Act
Surface Mining Control and Reclamation Act of 1977
Surface Mining Control And Reclamation Act of 1977 (SMCRA)
Surface Mining Control and Reclamation Act of 1977 By: Jennie Isber Per. 2 Rall Amendment Year: 1990; this allowed for funds to be spent on the reclamation.
Surface Mining Control and Reclamation Act of 1977 (Simon K)
Surface Mining Control and Reclamation Act
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
Surface Mining Control and Reclamation Act of 1977 (SMCRA)
Why do we need mines?.
Incidence of Legionnaires’ disease by county, January 1, 2010–December 31, 2017 Showing counties that had at least one case per year (on average) during.
Unit 3 Review (Calculator)
Reclaiming Mine Sites.
Bonds to 10 and 100 Hint: Use your bonds to 10 to work out bonds to – 5 =  10 – 8 =  10 – 3 =  10 – 10 =  100 – 30 =  40 +  = – 90.
Naval Complexes Meeting August 20, 2018
Algebra 2/Trig Name: ________________________________
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Where many varied interests agreed….. And the environment benefited.
Dollar Branch A 45 acre abandoned coal preparation and washing facility located at the head of Greasy Creek in Harlan County Poorly vegetated coal refuse.
Presentation transcript:

2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting January 19, 2017

2016 AML Reclamation Grading Costs 6 reclamation projects with 1,728,269 total cubic yards Cost per cubic yard ranged from $0.62 to $2.25 3 low bid averages at $0.91, $1.06, and $1.16 for a weighted average of $1.03 2014 – 2016 weighted average at $0.95 for 500 ft. or less

2014-2016 AML Reclamation Grading Costs

2016 AML Reclamation Revegetation Costs 9 reclamation projects with 284.8 acres revegetation Cost per acre of the 3 lowest bids ranged from $808.63 to $2,838.65 Weighted average of 3 lowest bids was $2,129.80

2016 AML Reclamation Mulch, Seed Bed Preparation and Seed Costs Mulch cost per acre of 3 lowest bids was $886.72 3 year weighted average of Mulch cost is $868.05 Seed Bed Prep cost per acre of 3 lowest bids at $329.10 3 year weighted average of Seed Bed Prep is $279.57 Seed cost per acre of 3 lowest bids at $250.95 3 year weighted average of Seed is $281.85

2014-2016 Bond Rate Data 2017 Bond Rates

2017 Bond Rates (continued) 2014-2016 Bond Rate Data 2017 Bond Rates (continued)

Bruce Carl Bureau of Mining Programs 717-783-3516 brcarl@pa.gov