INSIDE – Update meeting

Slides:



Advertisements
Similar presentations
1 Software Processes A Software process is a set of activities and associated results which lead to the production of a software product. Activities Common.
Advertisements

Lecture 19 Page 1 CS 111 Online Protecting Operating Systems Resources How do we use these various tools to protect actual OS resources? Memory? Files?
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PulseHR Time and Attendance software development and coding web development, web hosting IT project management and consulting Str. Ghioceilor.
 Electronics for the profiler (Michela e Adalberto)  Profiler: development of an evaluation board for the test (Matteo)  Design of the FE-ASIC (Cristoforo)
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Handheld TFTP Server with USB Andrew Pangborn Michael Nusinov RIT Computer Engineering – CE Design 03/20/2008.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
Low Cost Virtual Reality Platform Done by: Peter Fang, Kevin Feng & Karen Wai Supervised by: Prof. Edwin Blake & Dave Maclay.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
Fullbeam DAQ board on PET system Eleftheria Kostara (INFN of Pisa, University of Siena ) Supervisors: F. Palla, M.G. Bisogni (University of Pisa) Technical.
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
INSIDE – Update meeting PET DAQ 24 March Refresh from the last meetings Objectives of the PET DAQ – Provide a full in-beam (full-beam) PET system.
Sampa testing Arild Velure. FPGA testboard design SoC-Kit Board HPS Memory Command and Control Module Clock Manager Uart to bus MUX Data manager.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen - CMS Electronics Week
Chapter 3: Link Aggregation
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
A Flexible Open Source Electronics System for Radiotracer Imaging
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
INSIDE in-beam PET system assembly and test at INFN Torino
Baby-Mind SiPM Front End Electronics
Current DCC Design LED Board
Production Firmware - status Components TOTFED - status
Update on the development of the PET data acquisition system
Software Life Cycle “What happens in the ‘life’ of software”
Cluster Active Archive
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
HCAL Data Concentrator Production Status
CMS EMU TRIGGER ELECTRONICS
Edgecore ASFvOLT16 VOLTHA Adapter and Driver Kim Kempf, Sr
Edgecore ASFvOLT16 VOLTHA Adapter and Driver Kim Kempf, Sr
FMC adapter status Luis Miguel Jara Casas 5/09/2017.
Online Software Status
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Carlos Abellan Milano, May 18th 2016
Status of the Data Concentrator Card and the rest of the DAQ
Measurement & Automation Explorer
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
NS Training Hardware.
Status of the ESS High Power RF Systems
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

INSIDE – Update meeting PET DAQ 9 June 2015 G. Sportelli on behalf of the INSIDE DAQ workgroup

RX HW development status in the last meeting (04/2015) Functional design ✔ Schematic design ✔ Mechanical design ✔ PCB design IC and connectors placement ✔ Negotiation ✔ External company kick-start ✔ Construction and assembly ✖ Expected delivery 7/2015 -> 9/2015 Most recent results are marked in blue

Current work SoCKit board Motherboard RX board Finish time constraining of ethernet connection ✔ Develop a HW/SW test framework Motherboard Finish hardware tests (mainly LVDS channels) Develop clock management boot-strap ✔ Re-implement control firmware from DoPET ✔ Test coincidence sorting ✔ Develop coincidence filtering ✔ RX board Develop complete firmware Most recent results are marked in blue

ASICs calibration framework The TX boards need calibration data from the user through the Ethernet interface Now this is done by a preliminary LabView script developed by Richard In the final version, the motherboard will perform the same operations as the script However this is a high-level feature that requires a detailed plan before starting development Agreed strategy: develop an alternate calibration software at Pisa and use it to test and document in detail the calibration procedure

System configuration for SW-calibration: alternative 1

System configuration for SW-calibration: alternative 1 Advantages no custom FW development full-SW based system relatively cheap part of the development is done already Disadvantages the DAQ workstation might not be fast enough to process events at the expected count rates SW development might not take less than the MB-based solution

System configuration for SW-calibration: alternative 2

System configuration for SW-calibration: alternative 2 Advantages FW development reuse highest performance Disadvantages relies on contractors deadlines relies on prompt and successful HW/FW development

System configuration: final considerations The two proposed solutions are fully compatible The strategy will be: buy a switch model with 52x1GbE ports plus 1x10GbE port develop in parallel at Pisa and Torino the SW-based and MB-based DAQ develop the system calibration SW at Pisa