IS IT CORRECTABLE? A DECISION ANALYSIS TOOL

Slides:



Advertisements
Similar presentations
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Advertisements

EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
David O. Wallin Department of Environmental Sciences Huxley College of the Environment Western Washington University Bellingham, WA
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
Erosion. What is it?  Movement of soil materials by the action of water, wind or gravity.
TRENCHING AND EXCAVATIONS
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Forest Practices Code Transition Roads With Ron Davis Chief Engineer, MOF.
Village of Alden Stormwater Pictorial view. Here is a view of rainfall and notice how the water carry’s away from the center of the road to the sides.
Drainage Systems for LBRC Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
Design of Open Channels and Culverts
Water Pollution. Watershed A watershed is an area of land from which all the water drains to the same location, such as a stream, pond, lake, river, wetland.
Small Scale Salvage Program Application Process. Purpose To establish an application and approval process for small scale timber salvage that is efficient,
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
Most Common Conservation Practices Forestry Illinois.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Storm Water Pollution Prevention Training
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Problem: surface ponding. Solution: surface or subsurface drainage.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
Soil conservation practices Contents Soil conservation practices Soil conservation practices Crop rotation Crop rotation Wind break Wind break Cover.
Coos Watershed Association Watershed Restoration Projects.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Land, Public and Private Chapter 10. Human Activities Affecting Land and Environment  Extensive logging – mudslides  Deforestation – climate change.
The plan for today What is careful logging Why careful logging is important What role do you play Look at some practical examples Organize for field session.
Soil Effectiveness Evaluations Procedure Fred Berekoff, RPF Stewardship Forester Stephane Dube, M.Sc. RPF Forest Soil Specialist PGFD Pilot Project.
Landslides and Road Deactivation Terry Rollerson, Mike Wise, Denis Collins, Wilson Muir, Denis Collins, Wilson Muir, Russ Wong, Tom Millard.
Maintenance of Structures Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
1 Module 3: Typical Roadway Drainage Where it goes in Where it comes out Stormwater System Maintenance: A 4-Part Workshop Series.
15 Feet : Minimum Width for Zone 1 Zone 1 Functions: Bank Stabilization Shading (water temperature control) Flood Protection Stream Inputs: Structural.
Essential Question: How does human activity affect the Earth’s surface?
OSHA Office of Training and Education
Excavation & Trench Safety
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
TWS/SELC Road Condition Study Two Duke University Nicholas School of the Environment, Masters Candidates and one Duke University, Undergraduate.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Soil Conservation.
Drainage Systems Surface Subsurface.
Inspector's Role and Responsibilities
General Road Construction Information
Interaction between Riprap Layout and Contraction Scour from Vertical-Wall Bridge Abutments Supported by Shallow Foundations presented by Huang, C., Xie,
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
Before the bell… Take out your notes sheet from yesterday.
Components of Stormwater Management Systems
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Inspector's Role and Responsibilities
Roads in flood plains (1)
Watersheds and Polluted Runoff
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF BRIDGE PROJECTS
Wetlands and Resource Roads
Small Scale Salvage Program
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Watersheds and Polluted Runoff
Latin America and Caribbean Region
What is soil erosion? Soil erosion is the process by which soil is moved. When soil is eroded, it may become pollution in the water or air. The land where.
Stream Crossing Replacement Policy
Presentation transcript:

IS IT CORRECTABLE? A DECISION ANALYSIS TOOL The following slides are to assist certified forest operations compliance inspectors in exercising their judgement in determining whether or not an operational issue is correctable (as per box 9 of the Forest Operations Compliance Monitoring Process Flowchart FOR 07 03 05). These slides are for guidance purposes only. They are not exhaustive. There are many situations and scenarios that a certified forest operations compliance inspector may encounter. The slides illustrate a thinking process for applying common sense when judging whether something is ‘correctable’ or not. The slides present only some examples for each operational type (Access, Harvest, Renewal & Maintenance). Correctable is assessed in terms of whether an operational issue can be responded to so that the forest operation meets the standard or requirement without loss or damage. Correctable is also assessed in terms of whether the proposed action will result in the behaviour of the Licensee being corrected. Operational issues that continue to occur after prior assignments of corrective action may be deemed not correctable due to failure of the of Licensee’s behaviour to change.

Correctable? - Decision Analysis Access WX Culvert Installation Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred and/or behaviour not modified Correctable Not Correctable In inspector’s opinion licensee is not exercising due diligence (e.g. continued occurrence of correctable operational issues) Pipe out of round beyond acceptable standard Reinstall proper pipe Wrong size Pipe; too short, or diameter too small Reinstall correct size An observable amount of sediment has entered or is entering the watercourse due to erosion, runoff or scour Fish passage obstructed (e.g. perched culvert) outside of fish spawning period; Reinstall A known contaminant is observed in the watercourse; e.g. oil, gas, herbicides that can be linked to industry operations Pipe improperly embedded in Stream, too deep or too shallow; Reinstall The reserve of standing timber prescribed to protect the watercourse has been compromised Water velocity in pipe beyond acceptable standard during spawning period; Riffle or Reinstall Road width exceeds prescription inside watercourse reserve area Fish passage obstructed during Fish Spawning Period due to perched culvert, excessive water velocity or blocked culvert. Embankment slope not stable; Re-slope Water crossing installation resulted in significant change to stream morphology Without DFO approval (SSG, p.135) Inadequate erosion control measures in place; Install rip-rap or veg. mats This slide provides examples of correctable decision analysis to be used for training purposes only

Correctable? - Decision Analysis Access WX Bridge Installation Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred, or behaviour not modified Correctable Not Correctable In inspector’s opinion licensee is not exercising due diligence (e.g. continued occurrence of correctable operational issues) Wrong size bridge installed; Reinstall Not constructed according to approvals- (e.g. stringers, abutments, curbs, running surface incorrect) detected before irreversible impact (e.g. before sedimentation or accident); Reconstruct, if detected before completion An observable amount of sediment has entered or is entering the watercourse Bridge constructed outside of approved time period or not at approved location Embankment slope not stable; Re-slope The reserve of standing timber prescribed to protect the watercourse has been compromised. Inadequate erosion control measures in place; Install riprap or veg. mats A known contaminant is observed in the watercourse; e.g. oil, gas, herbicides that can be linked to industry operations. Fish passage is obstructed by construction; Clear watercourse if outside of fish spawning period. Road width exceeds prescription inside watercourse reserve area Fish passage obstructed during fish spawning period Not constructed according to approvals- (e.g. stringers, abutments, curbs, running surface incorrect) impacts noted This slide provides examples of correctable decision analysis to be used for training purposes only

Sign, Improve Sight lines Stabilize/Rehabilitate Correctable? - Decision Analysis Access Road Construction Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred, or behaviour not modified Correctable Not Correctable Road is improperly drained no sediment entered watercourse due to erosion, scour or flooding Crown and Ditch In inspector’s opinion SFL is not exercising due diligence (e.g. continued unjustified occurrence, behaviour unchanged) Road located outside of approved Corridor Merchantable timber cut and left as a result of right of way clearing Pick-Up Aggregate removal occurred within 15 metres of the boundary of the planned area of the pit. Traffic Safety not addressed, no accidents have occurred Sign, Improve Sight lines Depth of aggregate extraction exceeds standard or is too close to a well or HPS stream (SSG, p.141) Forestry Aggregate Pit face Unstable or Pit not rehabilitated Stabilize/Rehabilitate Operations inside AOC boundary or during timing restriction Ponding in excavation area Provide drainage Operations during short shift/full shut down due to Fire Restriction Garbage on site Remove Inadequate Fire suppression equipment or personnel or equipment parked in unsafe area AOC boundaries improperly marked, pre-harvest. Re-mark This slide provides examples of correctable decision analysis to be used for training purposes only

Correctable? - Decision Analysis Harvest Cutting/Utilization Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred, or behaviour not modified Correctable Not Correctable Merchantable timber left on site (includes topping, butts); Pick-up and forest resources are scaled In inspector’s opinion licensee is not exercising due diligence (i.e. continued occurrence of correctable operational issues) In inspector’s opinion SFL is not exercising due diligence; i.e., reoccurrence without just cause, behaviour unchanged Merchantable timber left standing beyond operational restriction requirements; Return and harvest Trespass outside of harvest boundaries, or into AOC boundaries (may be result of improper boundary marking). Lodged trees; Remove Harvest during timing restriction. Garbage or equipment left on site; Remove Harvest of unauthorized species Residual stand damage Wood chip fibre left on site; Pick up High stumps Corduroy left unscaled; Scale/Pay Crown dues Cutting without authority. Site disturbance (SSG p.144) Harvest/AOC boundaries not properly marked; Re-mark boundaries Inadequate Fire suppression equipment or personnel or equipment parked in unsafe area This slide provides examples of correctable decision analysis to be used for training purposes only

Correctable? - Decision Analysis Renewal Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred, or behaviour not modified Correctable Not Correctable In inspector’s opinion licensee is not exercising due diligence; i.e., reoccurrence of correctable operational issues Garbage on site; Remove In inspector’s opinion SFL is not exercising due diligence; i.e., reoccurrence without just cause, behaviour unchanged Site preparation incorrectly carried out, some situations may be correctable (e.g. increase mineral soil exposure); Re site prepare if correctable Operations outside of approved boundary Unapproved pesticides used. Wrong species planted than prescribed Replant No notification and/or posting for pesticide application Residual stand damage Site disturbance (e.g. rutting SSG p.144) Operations during short shift/full shut down due to Fire Restriction Inadequate Fire suppression equipment or personnel and/or equipment parked in unsafe area This slide provides examples of correctable decision analysis to be used for training purposes only

Correctable? - Decision Analysis Maintenance Realignment to Standard or Requirement without Loss or Damage Loss or Damage Incurred, or behaviour not modified Correctable Not Correctable In inspector’s opinion licensee is not exercising due diligence; i.e., reoccurrence of correctable operational issues Garbage on site; Remove In inspector’s opinion SFL is not exercising due diligence; i.e., reoccurrence without just cause, behaviour unchanged Operations outside of approved boundary Incorrect tending according to Prescription - may be correctable Re-tend if correctable Unapproved pesticides used. No notification and/or posting for pesticide application Residual stand damage Site disturbance (e.g. rutting SSG p.144) Operations during short shift/full shut down due to Fire Restriction Inadequate Fire suppression equipment or personnel and/or equipment parked in unsafe area This slide provides examples of correctable decision analysis to be used for training purposes only