Summary of Deliverables & reached Milestones

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Programmable Logic- How do they do that? 1/16/2015 Warren Miller Class 5: Software Tools and More 1.
FTK poster F. Crescioli Alberto Annovi
The Preparatory Phase Proposal a first draft to be discussed.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
U.S. Department of Agriculture eGovernment Program Prototype Weekly Status Meeting July 1, 2003.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
14.4. Readout systems for innovative calorimeters
Outline The Pattern Matching and the Associative Memory (AM)
Firmware development for the AM Board
Deliverables, final review and final reporting
IAPP - FTK workshop – Pisa march, 2013
DCS Status and Amanda News
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
EC project periodic and continuous reporting
LAMB: Hardware & Firmware
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Production Firmware - status Components TOTFED - status
Possible contribution of Pisa on pixel electronics R&D
Wrap up Licia Florio AARC Coordinator
AM system Status & Racks/crates issues
An online silicon detector tracker for the ATLAS upgrade
* Initialization (power-up, run)
Calliope-Louisa Sotiropoulou
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
Pending technical issues and plans to address and solve
Secondments & tasks Management meetings – Calendar
Early Stage Researcher: Panos Neroutsos
WP5: Dissemination, studies, web portal and tools
CMS RPC Endcap RE1 Status Report
Experience with an IT Asset Management System
BioMedBridges – Work Packages 2 & 12
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Delivery of Solutions Information Management
TSF Upgrade Project Overview Resources Plans and Timetable
KICK OFF meeting - project presentation
Key Data on education: process for statistical indicators
A High Intensity Neutrino Oscillation Facility in Europe
Pierluigi Paolucci & Giovanni Polese
PCS Technical Board 27th February 2018, Vienna.
New Eurotrace Windows RoadMap
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be done Outreach

History Demonstrator: AMBFTK, LAMBFTK and AMCHIP04 (14 mm^2); produced and tested It works but the Amchip package is not ok for large chip (>1 cm2) →new package, new IP core, new serialized I/O → New AMBSLP PQ208 OLD → New LAMBSLP in two versions: Mini_LAMBSLP for Miniasic Amchip to test the IP core LAMBSLP for final BGA package for AMchip05 and 06. BGA 23x23 NEW

Status of Deadlines - Milestones in 2013 Milestones do not need separate documents – they will be mentioned in the periodic report Milestone no. name WP Delivery Comments Leader date M.4.1. Demo general simulation ok UniPisa M6 (July) Demonstrator simulated architecture ok basical AMBFTK simulation OK, M.1.1. Slp2 prototype ok at Priele PRIELE M12 (Jan) SLP2 prototype validated at PRIELE Ongoing work – boards available (Saverio-Pierluigi) M.1.2. Prototypes Atlas Review PRIELE M12 Atlas evaluation of FTK prototypes M.2.1. Demonstrator ok at Caen CAEN M12 Demonstrator runs flawlessly at Caen Integration with AUX card (Marco – Takashi) AMBoard (a) Final Fit-HW SSB: DF Proto AUX

OUTREACH MILESTONES M.7.1.-M.7.3. Open Days results verification AUTH M8, M20,M32 M.7.4. –M.7.6. WorkS. days results verification AUTH M6, M18,M30 JULY M.7.7. –M.7.9. Summer schools results AUTH M7, M19,M31 Summer School: VHDL language and ISE Xilinx CAD July 1 – 4 2013 http://agenda.infn.it/conferenceDisplay.py?confId=6549 Workshop DAY: July 12 2013 ALL IN PISA IAPP Open day: inside the “Department congressino” FTK communicates to students April 17 2013 http://www.df.unipi.it/eventi/congressino-2013

Talks and paper summaries http://www.pi.infn.it/~paola/IAPP/publications/ http://www.pi.infn.it/~paola/IAPP/talks-posters/ Calliope: talk at ICATPP13 and poster at IEEE13 2-D clustering implementation on FPGA Saverio: talk at RD2013 AMBFTK-LAMBFTK-AMchip04 Daniel: talk at ICATPP13 – AMBFTK & AMBSLP Agostino: poster at IEEE13: AMBSLP +miniLamb +new chip Guido: talk at TWEPP – general on FTK

DELIVERABLE SUMMARY Reports after secondments are inputs to Deliverables that are documents written by the WP leader Del. no. Deliverable Title Nature Dissemination level Delivery date D.2.1. VS infrastructure at CAEN for FTK demonstrator (Kostas) R (CAEN) RE M6 D.4.1. FTK Demonstrator detailed simulation (Piendi-Donati-Maga.) R (UNIPI) RE M9 D.4.2. Test Vectors for the FTK demonstrator (Piendi-Donati-Maga.) R (UNIPI) RE M10 D.2.2. FTK demonstrator fully integrated with old power supply (RD13) Pub PU M12 D.1.1. SLP2 prototype constructed at PRIELE (IEEE13) Pub PU M12 D.6.1 Test bench (Calderini) R (LPNHE)RE M12 D.7.1. IAPP project open days R PU(Paola) M7, M19, M31, M43 D.7.2. Workshop days R PU(Paola) M5, M17,M29, M41 D.7.3. Summer school weeks R PU(Paola) M6, M18,M30, M42 D.7.4 D.8.3 World wide web site for dissemination R PU(Kostas) M6, M18, M30, M48 Status of Web site D.8.1. FTK Workshops R RE(Paola) M1, M13, M30, M46 D.8.2. Trainings (next is AUTH) R RE(Paola, CAEN) M1, M5, M9,M19, M29, M47

IAPP program: where to do what WP1: Prisma  production, board tests (Marco+AMB experts…..?) WP2: CAEN integration  clustering (Calliope), AMSLP2, SLP1 (Christos), infrastructures… WP6…. WP3: commissioning  starting next year WP4: simulation, trigger studies  Danile..Guido..Simone?

Nuova distribuzione di comandi/assunzioni ??? Guido V. Rob. B.

ANNO III e IV

CONCLUSIONS TIME IS RUNNING FAST A LOT OF REPORTS TO PREPARE IF I do not receive the missing documents for the end of the year I will go on STRIKE!